Public tenders for environment in Hatvan Hungary

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Joint Municipal Office Hatvani carrying out related entrance to organize your work environment (amendment Information)

Hatvan Város Önkormányzata | Published November 27, 2015  -  Deadline November 26, 2015
cpvs
45000000, 45233200, 71220000

Joint Municipal Office Hatvani carrying out related entrance to organize your work environment

Preparation and ordering construction works in conjunction with the construction plans EEOP 6.5.0 / ID No. 14, tender "Development of an environment and energy non-profit information center is located sixty" in

Hatvan Város Önkormányzata | Published February 23, 2015  -  Deadline March 9, 2015
cpvs
45210000, 45110000, 45212310, 45331200, 45421100, 71245000

Preparation and ordering construction works in conjunction with the construction plans EEOP 6.5.0 / ID No. 14, tender "Development of an environment and energy non-profit information center is located sixty" in

carrying out related hatvani Joint Municipal Office entrance to organize your work environment - TSZM

Hatvan Város Önkormányzata | Published February 12, 2016
Winner
Jánosik és Társai Kft.
cpvs
45000000, 45233200, 71220000

80/100 counterattack. Gödörásásal size, dry, damp soil, 0,4x0,4x0,4 m ültetőgödrökbe, 100% soil replacement, 8 cm thick mulch-laying: 44 pc
- Bloom, low ground cover shrub planting area of ​​42 m2 - 5 units / m2, 20/30 - 30/40 control. sizes, binding Gödörásásal, dry, damp soil, 0,4x0,4x0,4 m ültetőgödrökbe, 100% soil replacement, 8 cm thick mulch-laying: 210 pcs
- Onion crops planting area on two sides of the landing ground cover shrubs in the area between 26 m2 - 25 pcs / m2, duggatással: 650 pc
- Irrigation pipes, install protective subsequent drive: 25 m
- Production of topsoil for planting: 42.3 m2

Joint Municipal Office Hatvani carrying out related entrance to organize your work environment (Results of the procedure)

Hatvan Város Önkormányzata | Published January 15, 2016
Winner
Jánosik és Társai Kft.
cpvs
45000000, 45233200, 71220000

Subject: Completion of Hatvani related Joint Municipal Office entrance of environmental organize your workload: Demolition and preparatory works: 40 cm depth of the recycled paving stone culling, deponálásával in are: 183 m2 - Green surface of crop eradication, soil picked up 40 cm depth: 37 m2 to 10 cm depth: 131 m2 - Manufacturing Execution installment plans Main architect in consultation: 1 - under preparation of compressed earth filling pavement: 60 m3 - plastic under the archway drain pipe painting, plaster color: Work on 8 m Housing construction - Production of Auburn ground stone cladding - 12x24 / 6cm traditional stack mode, putting pedestrians forglomra , mirror making, compacted crushed stone subbase, sand bed in a 6% cut losses calculated at 142 m2 - Making Auburn ground stone cladding - 12x24 / 6cm fishbone sample packed, fugázva counting pedestrian forglomra, mirror making, compacted crushed stone subbase, sand bed of 6% crop loss: 25.2 m2 - preparation of paving stones cover - 8cm Semmelrock so-called custom-made. "Hatvani red" station wagon car rakatkép forglomra, asphalt pavement, calculated at a 6% loss in crop and opened the space provided by the customer using stones: 167 m2 - Border included the construction of ramps and basalt plant beds, raised 10cm edge 10x50x30 cm, C8-32 / FN betonbordába putting together a 6% cut losses calculated at 48.7 fm - Border stone building space for step C8-32 / FN betonbordába putting together a 6% cut losses calculated: 26.6 fm - térburkolatnál concerned Paving the verge of car traffic "K" border or térburkolatból with an 8% slope: 13.4 fm - manhole covers lifting: 2 - 4 pieces of concrete Removing and reinstalling fixed the new pavement level adjusted column cast stone plinth of the site terrazzo coverage adding: 4 - Metal plate channels 10 cm wide casing flush , sink bindings: 13.26 m - in addition to outdoor LED strip ramps outer edge electrical wiring office next to the entrance conduit mounted on 20 meter complex equipment - handrail 700 and 950 mm from round steel or solid balustrades, columns 1m each with a diameter of 50 mm: 14 fm - handrail design 750x300x200 mm C8-32 / FN point Funds handrail poles underground recording: 80/100 14 Plant Installation icon. Gödörásásal size, dry, damp soil, 0,4x0,4x0,4 m ültetőgödrökbe, 100% replacement of soil 8 cm thick mulch-laying: 44 pieces - Floral, low ground cover shrub planting area of ​​42 m2 - 5 units / m2, 20 / 30 - 30/40 control. sizes, binding Gödörásásal, dry, damp soil, 0,4x0,4x0,4 m ültetőgödrökbe, 100% replacement of soil 8 cm thick mulch-laying: 210 pieces - two sides of the landing area on Bulbous plants include shrubs planted ground cover area of ​​26 m2 - 25 pcs / m2, duggatással: 650 pieces - Irrigation placing install conduits subsequent drive: 25 m - Production of topsoil for planting: 42,3 m2

Preparing and ordering construction works construction plans in the context of EEOP 6.5.0 / ID No. 14, tender "Development of an environment and energy non-profit information center located sixty" section - Achievement Guide

Hatvan Város Önkormányzata | Published September 2, 2015
Winner
Bástya Millenium Zrt.
cpvs
45210000, 45110000, 45212310, 45331200, 45421100, 71245000

The demolished buildings typical dimensions of the buildings of the successful transformation of the main demolished working parts of the renovation expansion which is the contractor duties are as follows: Breakdown • Roofing • Load-bearing wall structures occasional demolish (the building south side due stairwell entrances to be constructed as a load-bearing wall structures) • Partition structures occasional Demolition • Making develop there benefiting from the building levels of "glass cage" structure födémáttörések • demolition of the facade of existing plaster pieces • demolition of the existing tinning • The interior plaster breakdown where necessary • demolition of existing interior staircase structure • Newly together with the doors and windows structures inside breakdowns required completed Elevators placement • continuous collection and removal of demolition debris landfill permit • in accordance with the requirements of the electrical buildings tethering, stress relief, measuring disarmament • The buildings are full plumbing pipeline stipulation, the decommissioning of the closure of the building connecting plumbing / utility conductors • Technical building fittings , performing plumbing breakdowns. • Building electrical fittings decommissioning, to carry out building electricity breakdowns. Along the south side of the building of a new wing escape stairs and neck connecting members to convert to a five-storey (ground floor, first floor, second floor, third floor, fourth floor) finish. After enlargement and renovation and remodeling of the building characteristic dimensions are as follows: Ground floor: converted refurbished gross floor areas of 742 m2, first floor: converted refurbished gross floor areas of 742 m2, second floor: converted refurbished gross floor areas of 742 m2, third floor: converted refurbished gross floor areas of 742 m2, Fourth floor: converted refurbished gross floor areas of 742 m2, Attic: converted refurbished gross floor areas of 742 m2, Staircase gross total floor area of ​​323 m2, the total gross floor area affected by the works: 4775 m2, the be expanded and renovated and refurbished building will consist of six levels: 1) Existing levels of reconstruction, the transformation of the second six-storey building) a new five-storey staircase built next to the existing building. The heating system can be controlled terminal units, fan coils, radiators and underfloor heating surfaces. The building has central air conditioning systems will be developed; air handler with a 15000 m3 / h air flow, plate heat reclaimer and heating and cooling, floor-by-motorized adjustable dampers, speed-controlled fans and a 2500 m3 / h flow exhaust fan central exhaust system of separate sanitary facilities. The building has internal gravity sewerage network will be constructed. Gross surface area of ​​the inner surface of training works (surface preparation, part, plastering, plastic bonded FILLER (with the plaster), plaster and concrete surfaces, all floored room, articulate and inarticulate surface; Dispersion paint plastic-based aqueous dispersion of white or factory-tinted paint, new or old scraped and prepared substrate, plaster, concrete, drywall surface in two layers on a flat surface, deep primer): Installation of 2000 m2 42 mm thick glass windows to expectations: 118 pcs. During the work on the scaffolding anchor points determining the technologies and construction methods, materials choosing strive for the preservation of the existing façade, retaining the building's exterior character. The outer facade of the existing building will be renovated in a contemporary exterior facade restoration of doors and windows, replacement. The building will be constructed to ensure complete approach to parking, outdoor environment, gardening elements.

Demonstration acquisition of assets under the EEOP 6.5.0 / Project ID NO: 14 - Results of the procedure

Hatvan Város Önkormányzata | Published November 30, 2015
Winner
TÓ-ART MEDIC Kft.
cpvs
39162110

Procurement subject: Purchase of equipment under the Demonstration EEOP 6.5.0 / ID No. 14, "Development of an environment and energy non-profit information center is located Sixty" project procurement quantity: 32 pieces of demonstration devices and their installation, as detailed in the documentation

The provision of technical assistance in connection with the audit EEOP 6.5.0 / 14 identification number application (Results of the procedure)

Hatvan Város Önkormányzata | Published May 29, 2015
Winner
COHESION Tanácsadó és Szolgáltató Kft.
cpvs
71631300

Technical inspection services related to the provision of EEOP 6.5.0 / 14 identification number application. The contractor is also responsible for performing technical inspection tasks required in connection with the EEOP 6.5.0 / ID No. 14, tender on "Development of an environment and energy non-profit information center in sixty cities" 191/2009 on the building construction activity. . Regulation (IX. 15) on § 16 (2) - (5) shall be in accordance.

Order Security Service (Informative award notice)

Hatvan Város Önkormányzata | Published December 9, 2015
Winner
Target Group Facility Management Zrt.
cpvs
79710000, 79713000

Owned sixty Municipality of Hatvan hrsz.-U 2995, natural supply of 3000, located at Kossuth tér 2, Hatvani Joint Municipal Office space tax property guarding duties of the contractor's duty in the performance of the guarding tasks: - the agency's main entrance reception to meet - work used office supply office customer registration help - to comply with data protection rules for registration - who wish to enter the territory of the agency people and entering vehicles belépési- and recovery eligibility check - ingress of foreign or unauthorized users, as well as crimes or offenses committed prevent the offender withhold the scene to ensure the plot indicate both the payer and the police towards the enforcement agencies acting on their duties to cooperate - the environment, health, labor and fire safety rules to comply - the building keys and their records handled - passenger and vehicle traffic, parking policy, any movement of goods checked - with the camera system to monitor in case of defects intervene - privacy rules governing camera system to observe - security alarm system in the building to handle the potential failure immediately reported

Landscape. Hird. the authors. amending-corporation. authors. under the KEOP-1.1.1 / B / 10-11-2013-0004 az.sz. project-related Hatvani Waste Management Agency, as well as design and construction yards are FIDIC yellow book says

Hatvan és Környéke Települési Szilárdhulladék-gazdálkodás Fejlesztése Társulás | Published January 8, 2016
Winner
DHJ Építő Kft. és WEST HUNGÁRIA BAU Kft. közös ajánlattevők „DHJ - WEST Hatvan Konzorcium”
cpvs
45222100, 45222110, 71220000

Within the framework of a contract related to the KEOP-1.1.1 / B / ID No. 10-11-2013-0004 project Hatvani Waste Management Agency, as well as design and construction yards are in accordance with FIDIC Yellow Book. Part 1: Performance of Hatvani treatment center design, construction tasks, according to FIDIC Yellow Book. A brief description of development: The waste management center facilities, based on the indicative plan: - road access and parking (non-execution of this tender is the task of winning!), According to Ministry of Environment. - Office and social buildings: 377 m2 equipment - Colour and repair shops: 499 m2 - sided 40-ton measurement limit weighbridge 18.0 m, and two 20 'ISO balance sheet management container - Sorting (industrial) halls and sorting technology: 1198 m2, four stand-manual sorting line, dispatch tape dobrostával, magnetic separation, 50-ton baler, perforátorral, the need for conveyor belts - Fire water reservoir: 92 mx 60 m - Compost storage colors: 480 m2, m3 lightweight 2820. - Car wash: biological WWTP - Fuel pump: 10 m3 - Bálatároló color: 480 m2 lightweight - mechanical pretreatment map: Map of concrete, composting field - Wheel Washing 1 - Load Washer 1 - Buoyancy way the landfill 1 - Insulated dombépítéses B3 types of landfill, 120,000 m3 of solid capacity (approx. 25,000 m2), min. divided into two parts, leachate, rainwater drainage, insulation specified (HDPE insulation of 2,5mm geomembrán) dombépítéses cultivation. - 1 protective forests - Service road around the landfill - Internal pavements - Hazardous waste collecting place (ISO container) 1 x 2.0 m high gate + 1 Part 2: supply and Kali yards are Jászfényszaru design, construction tasks, according to FIDIC Yellow Book. Brief description of research: Jászfényszaru yard waste collection and re-use centers paved surface of 1594 m2 - Building re-use centers - lightweight, single-stage, at least 172 m2 of net space, social area and storage area. - According to site design 5/2002 KvVM - Road connection and access road Kal waste yards and re-use centers 1,176 m2 paved surface - according to site design 5/2002 KvVM - road access and access road Both sections regarding: planning and permitting tasks: the realization, operation license During the review dossier for a licensee to be named by the operator. The acquisition and completion of these tasks necessary for the design contractor is responsible for all other authorizations. External utilities: Sixty Waste Management Centre for the útcsatlakozásról and external public works contracting arrange for Jászfényszaru Kal and the road connections and external utilities construction, design and licensing of Contractor's obligations. Design tasks: regulation, as well as first class under the laws in force on the date of the execution, complete construction on the basis of the tender documents, the contract is to be concluded, the third volume requirements and offers Employed 15) on.. Construction works 20.) Govt. Shall be carried ensure continuous archaeological monitoring on the basis of Section 38 of the rules relating to the protection of archaeological heritage and the historic value (large investment or part thereof). Contractor shall also conduct trial run for the first part, as specified in the documentation, whose duration: 14 days. The detailed technical specifications of the tender documentation deadline for the completion of 270 days of its conclusion. The conditional amount of documentation and usability of the draft contract will be issued as part of which will be issued during the procurement procedure details. In connection with the construction required an investment of detailed criteria and requirements included in the tender documentation (project documentation). The project is not eligible job is not included. Estimated value excluding VAT: Part 1: 1,165,613,735 HUF Currency: HUF.

Within the framework of a contract related to the KEOP-1.1.1 / B / ID No. 10-11-2013-0004 project Hatvani Waste Management Agency, as well as design and construction yards are in accordance with FIDIC Yellow Book, amending the contract information

Hatvan és Környéke Települési Szilárdhulladék-gazdálkodás Fejlesztése Társulás | Published August 12, 2015
Winner
DHJ Építő Kft. és WEST HUNGÁRIA BAU Kft. közös ajánlattevők „DHJ - WEST Hatvan Konzorcium”
cpvs
45222100, 45222110, 71220000

Within the framework of a contract related to the KEOP-1.1.1 / B / ID No. 10-11-2013-0004 project Hatvani Waste Management Agency, as well as design and construction yards are FIDIC yellow book. Part 1: Performance of Hatvani treatment center design, construction tasks, according to FIDIC Yellow Book. A brief description of development: The waste management center facilities, based on the indicative plan # road access and parking (non-execution of this tender is the task of winning!), According to Ministry of Environment. # Office and social building 377 m2 # Machine Color and repair shops: 499 m2 # Two-sided 40-ton measurement limit weighbridge 18.0 m, and two 20 'ISO balance control container # Sorting (industrial) halls and sorting technology: 1198 m2, four stand-manual sorting line, dispatch tape dobrostával, magnetic separation, 50-ton baler, perforátorral, the need for conveyors Fire water reservoir # 92 mx 60 m # Compost storage colors: 480 m2, m3 lightweight 2820. # Car wash: biological WWTP # Fuel pump: 10 m3 # Bálatároló color: 480 m2 light # mechanical pretreatment map: Map of concrete, composting field # Wheel washers 1 # Load Washer 1 # Buoyancy way the landfill 1 # Insulated dombépítéses B3 types of landfill, 120,000 m3 of solid capacity (approx. 25,000 m2), min. divided into two parts, leachate, rainwater drainage, insulation specified (HDPE insulation of 2,5mm geomembrán) dombépítéses cultivation. # 1 # shelter belts around the landfill Service road pavements # # Internal Hazardous waste collecting place (ISO container) 1 x 2.0 m high gate 1 + Part 2: supply and Kali yards are Jászfényszaru design, construction tasks, according to FIDIC Yellow Book. Brief description of research: Jászfényszaru yard waste collection and re-use centers paved surface 1594 m2 building # re-use centers - lightweight, single-stage, at least 172 m2 of net space, social area and storage area. According to # site design 5/2002 KvVM # Road Connectivity and access road Kal waste yards and re-use centers 1,176 m2 paved surface #-site design, according to 5/2002 KvVM # road access and access road Both sections regarding: planning and permitting tasks: the realization, operation license During the review dossier for a licensee to be named by the operator. The acquisition and completion of these tasks necessary for the design contractor is responsible for all other authorizations. External utilities: Sixty Waste Management Centre for the útcsatlakozásról and external public works contracting arrange for Jászfényszaru Kal and the road connections and external utilities construction, design and licensing of Contractor's obligations. Design tasks: regulation, as well as first class under the laws in force on the date of the execution, complete construction on the basis of the tender documents, the contract is to be concluded, the third volume requirements and offers Employed 15) on.. Construction works 20.) Korm. Shall be carried in addition to providing ongoing archaeological observation based on Section 38 of the rules relating to the protection of archaeological heritage and the historic value (or part of a large investment). Contractor shall also conduct trial run for the first part, as specified in the documentation, whose duration: 14 days. The deadline for completion is 270 days from the date of its conclusion. The conditional amount of documentation and usability of the draft contract will be issued as part of which will be issued during the procurement procedure details. In connection with the construction required an investment of detailed requirements and expectations are included in the tender documentation (project documentation). The project is not eligible job is not included. Estimated value excluding VAT: Part 1: 1,165,613,735 HUF Currency: HUF.

Within the framework of a contract relating to the EEOP 1.1.1 / B / ID No. 10-11-2013-0004 project Hatvani Waste Management Centre, as well as design and construction yards are under FIDIC Yellow Book

Hatvan és Környéke Települési Szilárdhulladék-gazdálkodás Fejlesztése Társulás | Published February 11, 2015
Winner
DHJ Építő Kft. és WEST HUNGÁRIA BAU Kft. közös ajánlattevők „DHJ - WEST Hatvan Konzorcium”;DHJ Építő Kft. és WEST HUNGÁRIA BAU Kft. közös ajánlattevők „DHJ - WEST Hatvan Konzorcium”
cpvs
45222100, 45222110, 71220000

Within the framework of a contract relating to the EEOP 1.1.1 / B / ID No. 10-11-2013-0004 project Hatvani Waste Management Centre, as well as design and construction yards are under FIDIC Yellow Book. Part 1: Performance of Hatvani treatment center design and construction tasks according to FIDIC Yellow Book. A brief description of development: The waste management center facilities, based on the indicative plan # road access and parking (not design this tender is the task of winning!) Under Ministry of Environment. # Office and social building: 377 m2 # sheds and repair shops: 499 m 2 # sided 40 tonne meter with scales of 18.0 m, and two 20 'ISO balance sheet management container # Sorting (industrial) hall and sorting technology: 1198 m2, four stand-manual sorting line, dispatch tape dobrostával, magnetic separation, 50-ton baler, perforátorral, the need for conveyors Fire water reservoir # 92 mx 60 m # Compost container color: 480 m2, m3 lightweight 2820. # Car Wash: biological WWTP # Fuel pump: 10 m3 # Bálatároló color: 480 m2 light # mechanical pretreatment space: space concrete, composting field # Wheel washers 1 # Load Washer 1 # Buoyancy way the landfill 1 # Insulated dombépítéses type B3 landfill 120,000 m3 of solid capacity (approx. 25,000 m2), min. divided into two parts, leachate, storm water drainage, insulation provided (insulation of 2.5 mm HDPE geomembrán) dombépítéses cultivation. # 1 # protective forest service road around the landfill # # Internal pavements hazardous waste collection site (ISO container) 1 x 2.0 m high gate + 1, Part 2: Performance and Kali Jászfényszaru yards are the design, construction tasks according to FIDIC Yellow Book. A brief description of research: Jászfényszaru yard waste collection and re-use center # 1594 m2 paved surface reuse center building - a light-level, minimum net area of ​​172 m2, social area and storage area. According # site design 5/2002 KvVM # Path Connection and access road Kal collection yard and re-use center 1176 m2 paved surface # site design according to 5/2002 KvVM # road access and access road respect to both parts: Planning and permitting tasks: the realization, the operating license During the review dossier for licensees to be named by the operator. The acquisition and completion of these tasks necessary planning permission Contractor responsible for each other. External utilities: Sixty Waste Management Centre for the útcsatlakozásról and external public works contracting arrange for Kal Jászfényszaru and road connections to external utilities and construction, design and licensing of Contractor's obligations. Design tasks: regulation, and first-class under the laws in force on the date of the execution, complete construction on the basis of the tender documents, the contract will be concluded with the third volume requirements and Self-service 15) on the.. Construction works 20.) Govt. Shall be carried ensure continuous archaeological monitoring pursuant to Section 38 of the rules relating to the protection of archaeological heritage and the historic value (large investment or part thereof). Contractor shall also conducted trial run for the first part, as specified in the documentation, whose duration is 14 days. The deadline for the completion of 270 days from the date of its conclusion. The conditional amount of documentation and usability of the proposed contract will be issued as part of the procurement process, to be published in the details. In connection with the construction of investment required detailed requirements and expectations are included in the tender documentation (design documentation). The project is not eligible job is not included. Estimated value excluding VAT: Part 1: 1,165,613,735 HUF Currency: GBP.

Landscape. Hird. amending the contract-a contract to Albert Schweitzer Hospital in the framework of the SIOP-2.2.6-12 / 1 / B-2013-0005 of SEQ ID NO tender new surgical wing construction technology, hospital internal restructuring

Albert Schweitzer Kórház-Rendelőintézet | Published April 27, 2015
Winner
É-L 60 Konzorcium (Tagok adatai: ÉPKAR Zrt. (1112 Budapest, Németvölgyi út 146.) LATEREX Építő Kft. (1095 Budapest, Hídépítő út 1-12.)
cpvs
45000000, 45215140

A contract to Albert Schweitzer new surgical wing construction technology, hospital internal transformations contractor shall perform the intended subject of the contract under continuous operation of the institutional framework of the SIOP-2.2.6-12 / 1 / B-2013-0005 of SEQ ID NO Hospital in applications for which works so as to be uninterrupted patient care. Monument area (castle garden) MI. category, reference number: 2123 Currently after Land area 52,169 m2 Installation 9128 m2 Built-up 17:49% of construction: Land area 52,169 m2 Installation 9567 m2 (after disconnecting barakképületek) Built-up 18:34% (after disconnecting barakképületek) New building gross FORMAT BUILT 964 m2 Floor area index 00:40 Building height m 11:35 Main Building expansion and central sterilizing surgical wing, and breakdown during the course of the demolition and excavation assistance that may be necessary archaeological excavation of existing indoor stairs to the ramp. The size of the design, remodeling basement area of ​​internal transformations mounting new building net floor area: 893.84 m2 / gross floor area: 949.39 m2. Ground floor: new building net floor area: Internal: 630.83 m2 outdoor covered ambulance entrance, covered and covered entrance ramp: 238.14 m2 / gross floor area: 964.72 m2, 99.78 m2 built beyond these areas uncovered or ramp front staircase / renovation and transformation: ~ 1600 m2 of gross floor area. First floor new building net floor area: 681 m2 / gross floor area: 821.7 m2 / renovation and transformation: ~ 325 m2 gross floor area. II. floor new building net floor area: 198.51 m2 / gross floor area: 240.58 m2 / renovation and transformation: ~ 400 m2 gross floor area. III. floor renovation and conversion to the net floor area: 352.25 m2 / gross floor area of ​​408.24 m2. IV. floor renovation and conversion to the net floor area: 283.7 m2 / gross floor area: 305.45 m2. Total net floor area of ​​2,642.32 m2 of new construction (mounting basement 1,748.48 m2, of which internal floor area 1510.34 m2); All new gross floor area: 2,976.39 m2. Total: reconstruction: gross floor area: 3,038.69 m2 ~. Outside the building, remodeling and demolition-related renovations also the following demolition work is to be performed: 131.4 m2 area. - The existing pharmacy wing newly built wing side of the existing entrance stairs and windbreak of demolition: 11.18 m2 total area. - With regard to the demolished building extensions hospital roads, pavements and pavement sections were to be demolished. Construction and external facilities in the new wing (roads - hospital internal road and fire road - paving, exterior utilities) building and the wooden structure barrack buildings demolition after arrange the environment and carry out garden architectural work parts of the gardening plans. Planned features: New building mechanic Basement: mechanical and electrical supply mounting. New Building Ground: Creating a new central sterilization, developing emergency entrance. New Building 1st Floor: aseptic surgical block design with server rooms. New Building 2nd Floor: Develop and design powerhouse road. Existing building's basement ("A"), a new wing design wing entrance of the pedestrian ("B") engineering, respectively. basic machine construction. Wing ("C") mechanical replacements, preparing penetrations. Existing building ground floor on the north ("C") wing (from the new building): covered parking saving design. East ("B") wing. radiological unit (X-block) design - additional parts restaurant corridor) with (sterilization is the current block in place, and after the completion of the new building into the sterilizer relocation of existing buildings will be constructed first floor north ( "C") wing.. connecting the new building facing the connecting corridor development of the west side of the bridge (over lapstető wing section "B") reconstruction transom design ("C") flat roof wing vicinity of the bridge renovation of an existing building second floor north ("C") wing. with the development of aseptic surgical block server rooms and post-operative investing in the development of existing building 3rd floor north wing ("C"). Obstetrics department and the development server premises emperor-operation room with an existing building 4th floor north ("C") Wing: mechanical space inside the rig construction works which are the main parts of the work contractor shall include documentation detailing the plan and the budget in the calls). D

Environmental impact assessment documentation revision - result information

Hatvan Város Önkormányzata | Published February 20, 2015
Winner
ENVECON Környezetvédelmi és Projekttervező Kft.
cpvs
90713000, 71300000, 71311000

Preparation of environmental impact assessment as part of the documentation EEOP 7.9.0 / 12-2014-0042 identification number of projects. Contractor shall: • The 314/2005. Environmental Impact Assessment (licensing) documentation in accordance with Regulation (XII. 25.) Government. Drafting / revision of the administrative area of ​​sixty Municipality planned glassworks for establishing • Preparing the necessary discipline-specific documentation number of copies required by applicable law • During the licensing process, availability and may require missing documents become compiling dossiers
  • 1