Call +44 800 9755 164

Public tenders for environment in Saint-sulpice-sur-risle...

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!
EnvironmentFrancesaint-sulpice-sur-risle

16S0045 | Requalification of controlled environment rooms

Centre Hospitalier Chalon-sur-Saône (William Morey) | Published November 17, 2016  -  Deadline December 8, 2016
The contracting authority wishes to operational requalification of its premises controlled environment.

16S0342 | Development of Noise Prevention Plans in the Environment (PPBE) road infrastructure of the Department of Landes, Mont de Marsan and Urban Agglomeration of Gra

Département des Landes | Published November 3, 2016  -  Deadline December 12, 2016
Development of Noise Prevention Plans in the Environment (PPBE) road infrastructure of the Department of Landes, Mont de Marsan Agglomeration and Agglomeration of Grand Dax

Survey design services

Commissariat à l'énergie atomique et aux énergies alternatives | Published November 10, 2016  -  Deadline January 4, 2017

Benefits mechanical systems studies and if necessary to the implementation of the system.

Benefits mechanical systems studies eventually followed achievements.

- Benefits systematically include studies thus an expression of need and a draft summary of the CEA and up to the detailed design or folder definition together with any design justification file by calculations ;

- CAD benefits under the study will necessarily be made in the software environment CATIA / SmarTeam (used at CEA / DAM) or in the premises of the holder or in the CEA premises according to need in terms of classification and interactivity;

- Possibly, the realization of all or part of the subset studied;

- Quotes will be established after moving Holders on site, unless otherwise requested by the ECA;

- About 1/3 of the studies requested services will carry a supply time in 2 weeks.

The market is in a period of 3 years with an optional extension of 12 months.

Technical inspection and testing services

Commissariat à l'énergie atomique et aux énergies alternatives | Published November 10, 2016  -  Deadline December 12, 2016

Benefits of vibration tests for qualification structures thermomechanical environments and / or modal analysis.

The orders to contract is vibration testing services for qualification structures thermomechanical environments and / or modal analysis.

holder benefits include:

- The supply and installation of instrumentation,

- The assembly / disassembly on shaker,

- The smooth vibration controlled trials,

- The good compliance with environmental templates provided by CEA,

- Providing measures and a test report in electronic format.

It orders to market provides benefits estimated between 15 and 20 trials of more or less 5 days, spread over 4 years.

Works for complete or part construction and civil engineering work

Société d'habitations à loyer modéré de la Réunion | Published November 17, 2016  -  Deadline December 15, 2016

Structuring of Guillaume Bourg located in the municipality of Saint-Paul - improvement of the living environment - requalification works of Louise and rue Jouan.

Realization of external works (see tender documents for details).

Realization of street lighting works (see tender documents for details).

Realization of green areas of construction works (see tender documents for details).

Sewage removal services

Saint-Étienne Métropole | Published November 19, 2016  -  Deadline January 12, 2017

Managing service management includes the operation, including maintenance and monitoring of sewer systems, separate systems of wastewater collection networks and accessories; monitoring and control of potential releases of the works to the natural environment, research anomalies which may hamper the proper functioning of the service and resorption of these situations within the limits set by the contract; waste disposal and other by-products associated with the operation of the works; completion of work charged to the delegate by the contract and its subsequent amendments; management of relations with public service users for the duration of the contract; information and technical assistance to the community to allow it to control the service, including the transmission of accurate and reliable data; ancillary basis, maintenance, network monitoring separative rainwater community and related structures.

Engineering studies

Conseil général de la Vendée | Published November 22, 2016  -  Deadline December 20, 2016

The site was the subject in 1990 of a comprehensive rehabilitation operation and expansion, and all facilities (including technology) date from this time. Here they have "aged" and the building is more suitable in terms of comfort for users and deal with changing regulations, especially in terms of safety and the environment.

Accordingly, the Department plans to carry out all the necessary work, their programming to take into account the complexity of a major site for the busy Department hosts its services and welcoming a large audience.

The mission elements provided are: Diag, Aps and oda, Pro, total Exe on fluids and partial for the rest, Visa, Syn, Det, Opc and RPOs.

At this stage of reflection, the financial envelope foreseen for the overall achievement of the works is € 2.9 million before tax.

The execution time is estimated at 8 months to design and 36 months to work.

2016-11-02 | Environmental upgrading of Ty Corn site in Plougoulm

COMMUNAUTE DE COMMUNES DU PAYS LEONARD | Published November 14, 2016  -  Deadline December 6, 2016
Environmental upgrading of Ty Corn site in Plougoulm
  • 1