Call +44 800 9755 164

Public tenders for environment in Paris France

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Creation and implementation of a European multi country communication programme on the sustainability of the European dairy sector and its beneficial role for climate action and the environment

GEIE European Milk Forum (EMF) | Published January 17, 2017  -  Deadline February 13, 2017

The creation and development of a generic information PA/PR campaign targeting all participating EMF countries: 1) stakeholders of the environment, 2) influencers and millennials in order to increase the awareness of the dairy sector's positive role within the specific target groups, taking into account the different production systems of EMF member countries, with a European dimension.

Evaluation of a European multi country communication programme on the sustainability of the European dairy sector and its beneficial role for climate action and the environment

GEIE European Milk Forum (EMF) | Published January 17, 2017  -  Deadline February 13, 2017

Evaluation of a generic information PA/PR campaign targeting all participating EMF countries: 1) stakeholders of the environment, 2) influencers and millenials in order to increase the awareness of the dairy sector's positive role within the specific target groups, taking into account the different production systems of EMF member countries, with a European dimension.

1600482 | Implementation and operation of a Digital Work Environment (ENT)

Conseil Régional d'Ile-de-France | Published December 16, 2016  -  Deadline January 30, 2017
Implementation and operation of a Digital Work Environment (ENT)

1401297MIBRZ-2 | Acquisition of software packages STI (Scientific and Technical Information), use rights concessions IST packages and lump sum benefits related to the MINDEF (PROGIST)

Ministère de la Défense | Published November 25, 2016  -  Deadline January 24, 2017
Acquisition of software packages STI (Scientific and Technical Information), rights to use concession IST packages and lump sum benefits associated to the Ministry of Defence (PROGIST). STI packages under the following thematic groups: CADD / 3D Modeling; Data Acquisition / measures trajectory; scientific computing and simulation; Control / Control / Industrial Supervision; Development environment and configuration management; Operating results (data and images); graphics libraries / HMI; GIS / mapping; System engineering / Dependability; Tests and protection of information systems; Chemistry / Biology. The MCO includes the evolution version of the software and delivery of documentation updates. The acquisition / MCO of software / software licenses is the essential requirement. Note 1: This publication relates only to a call for applications. The consultation record companies (DCE) will later be sent to only those candidates invited to tender. Note 2: This publication is also published in more detail in BOAMP (http://www.boamp.fr) under No. 16-166205.

Legal advisory and representation services

Fondation nationale des sciences politiques | Published December 24, 2016  -  Deadline February 3, 2017

advisory, legal assistance and representation in court at the Fondation Nationale des Sciences Politiques.

regulatory / disciplinary law (ESR) (included in the litigation).

Procurement law - General.

Procurement law jurisdiction "works contract" (included in the litigation).

General public law - Institutional (included in the litigation).

Planning law and environment (included in the litigation).

real estate law.

Labour law (included in the litigation).

public law - Public Personnel Management (included in the litigation).

criminal labor law (included in the litigation).

Foundation law.

civil law / commercial / consumer law (included in the litigation).

Company law (included in the litigation).

Insurance Law (included in the litigation).

General criminal law (included in the litigation).

Computer law and the digital - IT / IP competence (included in the litigation).

Intellectual property - development of research and literary and artistic property (included in the litigation).

Law and intellectual property litigation - brand portfolio management.

General Tax Law (included in the litigation).

tax law foundations.

Banking services

Caisse des dépôts | Published December 9, 2016  -  Deadline March 13, 2017

The contracting authority wishes to extend the scope and architecture of the current electronic payment services and optimize existing services and processes.

Its scalability meets the desire to reduce instead of the check and species and to support its customers in the digital area.

The electronic banking bidding project should enable the CDC:

- To have an electronic banking architecture enables it to respond optimally to the needs and innovations in the field;

- To have an offer of electronic banking products that is competitive, innovative, secure and appropriate to the needs of its customers;

- To have a complete environment management tools which guide all its electronic payment business via secure interfaces and easy to use, and to meet the demands of its customers.

It offers the CDC the latest versions of automated service contracts client.The provider provides a comprehensive service of issuance of bank cards.

The provider offers the CDC the provision of leasing electronic payment terminal (TPE) and associated equipment (consumables and other supplies TPE) white label and ensures complete management of TPE CDC Park.

This service is structured around two components:

The first component of this service is to provide SOHO and appliances, to ensure delivery, and, if applicable, installation and support of newly equipped acceptors during the handling of the equipment. the second part of the provision is to manage the TPE park and ensure the delivery of assistance and maintenance of the TPE.

The proposed provision should cover three main areas:

- A brick application for payment;

- An administration tool available to the acceptor and the CDC;

O A support service for Acceptors and CDC.

The payment solution must be available 7 days 7, 24, 24 hours (excluding support services).

Lot No. 3 is divided into a firm phase and a conditional phase defined as follows:

Firm phase: implementation of Services providing online payment solution;

Optional slice: provisioning Provision of mobile acceptance solution (MPOS or equivalent).

The optional tranche will be strengthened within 24 months from the start of the service.

Environmental Impact Assessment (EIA) services for construction

Ville de Paris | Published January 11, 2017  -  Deadline February 15, 2017

coordinated conducting an impact study, a noise and vibration study, and a public safety study on land-Bedier Oudiné sector in Paris 13 th .

Firm phase:

Mission 1: completion of the impact study.

Mission 2: studies and additional meetings.

optional phases:

optional tranche 1: updating the impact assessment.

optional tranche 2: specific analysis in an impact on a Natura 2000 site.

Option No. Tranche 3: answer in memory of the opinion of the environmental authority and local authorities.

optional section 4: assistance in the drafting of the decision of the competent authority under the I] paragraph 2 of Article L.122-1-1 the environmental code.

optional section 5: Environmental Assessment of a possible evolution of the PLU.

Firm phase: realization of a sound and vibration study.

Optional slice: updates and additions of acoustics and vibration study.

Firm phase:

Mission 1: implementation of a public safety study.

Mission 2: Project management assistance in the development of the overall development project.

Optional slice: updates to the study of public safety study.

Lift installation work

CAS-VP | Published January 10, 2017  -  Deadline February 7, 2017

This consultation relates to the elevator modernization work in the institutions of the Social Action Center of the City of Paris. The expected benefits are: - lifts modernation - complete replacement of an elevator - the work will take place in busy environments.

Modernization of 5 lifts.

Complete replacement of a lift.

alloti market work for the development of the surroundings from the terrace of the Café Branly - Jacques Chirac

Etablissement public | Published January 12, 2017  -  Deadline February 8, 2017
alloti market work for the development of the surroundings from the terrace of the Café Branly - Jacques Chirac

7 rue Paris Caplat 18ème.Il is provided for the establishment after heavy restructuring all, 16 social housing with a floor area of ​​730 square meters.

Rivp construction | Published January 12, 2017  -  Deadline February 20, 2017
extensive redevelopment works of a property, situated 7 Caplat 18th Street in paris. This set consists of a R + 5 + building basement street and a building with ground floor and attic of cour.Il is provided for the establishment after restructuring all, 16 social housing with a floor area of ​​730 square meters. It is expected the elevation and extension of street building with the creation of a lift while maintaining the stairwell existante.Le market consists of three lots: Lot 1: ASBESTOS REMOVAL LOT 2: WORK EVERY BODY STATE LOT No. 3 LIFT

The frr wishes to have external expertise can measure, analyze and monitor the environmental footprint of its portfolio of financial assets.

Fonds de reserve pour les retraites | Published January 6, 2017  -  Deadline January 30, 2017
The FRR intends to implement external expertise can measure, analyze and monitor the environmental footprint of its portfolio of assets Environmental financiers.L'empreinte the FRR wishes to calculate is defined by identifying the associated risks by climate change which it is exposed through holding assets financiers.Cette footprint should in particular enable it to identify the high carbon footprint assets (Emissions and GHG reserves, coal), those generators physical risks and transition energy and environment, all in compliance with the international goal of limiting global warming.

Project management assistance for the environmental quality of the bus depot melun

Syndicat des transports ile-de-france | Published December 30, 2016  -  Deadline January 24, 2017
Project management assistance for the environmental quality of the bus depot from Melun
  • 1