Public tenders for environment in Montigny-en-gohelle France

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!
EnvironmentFrancemontigny-en-gohelle

ACQUISITION AND MAINTENANCE OF PRESS DIGITAL COLOR LASER NEW GRAPHIC ARTS PRODUCTION QUALITY AND COMPUTER ENVIRONMENT

Ville d'aix-en-provence | Published July 18, 2016  -  Deadline September 5, 2016
cpvs

ACQUISITION AND MAINTENANCE OF PRESS DIGITAL COLOR LASER NEW GRAPHIC ARTS PRODUCTION QUALITY AND COMPUTER ENVIRONMENT

Sewage, refuse, cleaning and environmental services

CC Plaines et Monts de France | Published March 8, 2016  -  Deadline June 1, 2016
cpvs
90000000

discharge sewage services and waste disposal, cleaning and services relating to the environment

Sewage, refuse, cleaning and environmental services

CC Plaines et Monts de France | Published January 2, 2016  -  Deadline March 8, 2016
cpvs
90000000

Removal services sewage and waste disposal, cleaning and services relating to the environment

Scheduling software package

Communauté de communes de Montrevel-en-Bresse | Published February 3, 2016
Winner
Aductis
cpvs
48332000

Supply, installation and maintenance of a management software for the management of infrastructure and the environment.

Technical computer support services

Communauté d'agglomération du Pays d'Aix | Published November 4, 2015
Winner
Repro diffusion informatique
cpvs
72611000

Implementation of technical assistance remote and on-site maintenance actions on the environment.

Consultancy, assistance and legal representation for the city of Saint-Germain-En-Laye

commune de saint germain en laye. | Published November 13, 2014  -  Deadline December 2, 2014
cpvs

consultancy, assistance and legal representation for the City of Saint-Germain-En-Laye. Planning, land use and environment.

Liability insurance services

Syndicat mixte Baie du Mont-Saint-Michel | Published December 22, 2015  -  Deadline February 8, 2016
cpvs
66516000

This consultation aims of building insurance services - civil liability of the owner for personal injury, material, consequential, consecutive or not immaterial and accidental harm to the environment, required as part of the realization of the recovery operation of the maritime character of Mont Saint-Michel. Basic Solution - Franchise: 10 000 EUR (excluding personal injury).

Supply, delivery and installation of office furniture and services for school furniture for schools and recreation centers.

Ville de Roissy-en-Brie | Published October 14, 2014  -  Deadline November 19, 2014
cpvs
39160000

The service includes the supply, delivery, unpacking, assembly, installation of furniture and on-site waste disposal. All products must meet the NF standards conform to the customs of communities and standards on fire. Each furniture will be a reference "catalog", details and a choice of materials and colors. The furniture should have the NF environment - or should meet the ecological criteria NF.

Construction work

Semcoda | Published April 16, 2015
Winner
MT Paysage SARL
cpvs
45000000

Infrastructure (about 1,100 parking lots) and viabilisations as part of the construction of 457 homes and businesses in Saint-Genis-Pouilly "Gateway to Northern France" (01630).

General contractors for construction of a police barracks comprising about 80 collective dwellings and approximately 1900m² of local service and technical - sdp approx. 8700m² in Bonneville

semcoda | Published July 9, 2015  -  Deadline August 19, 2015
cpvs
71240000

Bonneville - project management for construction of a police barracks comprising about 80 collective dwellings and approximately 1900m² of local service and technical - sdp approx. 8700m².

Technical assistance remote and on-site and ancillary training activities with the dsitae of the Aix community

cte d'agglo. du pays d'aix en provence | Published May 13, 2015  -  Deadline June 5, 2015
cpvs

The holders of the two lots will be responsible for implementing a remote technical support and on-site and ancillary training activities with the DSITAE the Community of the Pays d'Aix.le lot 1 for software Windows server environments , Citrix, Symantec and VMWARE.le lot 2 concerns the IBM server software environment. Lot 1: provision of services and assistance for server software: Microsoft vendors, Citrix, Symantec, Vmware The services subject of this lot consist remote telephone support and technical assistance on site for software maintenance Microsoft Servers, Citrix, Symantec and VMware.

Purchase and maintenance of new digital copiers, black and white, 16 to 50 pages / minute at Puy-en-Velay

conseil general de la haute-loire | Published May 11, 2015  -  Deadline June 4, 2015
cpvs
30121100, 50313200

ACQUISITION AND MAINTENANCE OF NEW DIGITAL COPIERS, BLACK AND WHITE OF 16 TO 50 PAGES / MINUTE ABOUT

Engineering studies

SISA | Published December 9, 2015
Winner
Safege SAS
cpvs
71335000, 45246000, 45246400, 72242000

The hydraulic study concerned the lower valley of the Siagne in the towns of Mouans-Sartoux, Pégomas, La Roquette-sur-Siagne, Mandelieu-La Napoule and Cannes. This study provides: In Phase 1: feasibility study at all hydraulic solutions to: - reduce peak flows of some rivers, floods -laminer the Siagne and Béal - improve resilience of the environment by shedding floods, -increase the capacity of the bed and / or improve flow conditions Béal - Phase 2: build to overview AVP level and on the basis of the above solutions, several development alternatives Combining different solutions - phase 3 study in detail design stage then compare technically, economically and statutorily 3 or 4 selected design variants.

Engineering studies

SISA | Published July 14, 2015  -  Deadline September 15, 2015
cpvs
71335000, 45246000, 45246400, 72242000

Hydraulic study concerns the lower valley of the Siagne in the communes of Mouans-Sartoux, Pégomas, La Roquette-sur-Siagne in Mandelieu-La-Napoule and Cannes. This study provides: In phase 1: feasibility study at all hydraulic solutions to: - reduce peak flows of some rivers, floods -laminer the Siagne and Béal, -improve resilience of the environment by shedding floods, -increase the bed capacity and / or improve flow conditions of Béal. - In Phase 2: build to overview AVP level and on the basis of the above solutions, several development alternatives combining different solutions. In phase 3 study in the detailed design stage and then compare technically, economically and statutorily 3 or 4 selected development alternatives.

Navigational instruments

Mindef/DGA/DE/CAEPE | Published March 10, 2015
Winner
DGA/DT/SCAT
cpvs
38110000

Opportunity required: Test receivers: The average will: - restrict the use of heavy equipment constellation simulation, - or using recorded real signals, - or by using signals recorded output by a simulator - facilitate comparison of different receptors test results - to facilitate non-regression testing of successive versions of a receiver, - improve the representativeness of tests vis-à-vis the reality of the frequency environment. The average would also capitalize sequences during measurement campaigns and contribute to the qualification of pure simulation means. A second copy of the average may be required to: - increase test capacity of RNAV department depending on work load induced weapons programs - will give the ability to conduct experiments in spoofing.

Floor laying and covering work

Dynacité (OPH de l'Ain) | Published February 16, 2017  -  Deadline March 16, 2017
cpvs
45432100

routine maintenance medium floor coverings in asbestos-occupied dwellings, public areas and various local. The consultation is divided into 21 lots. Each batch is subject to a framework agreement implemented by the issuance of purchase orders without minimim Ni Maximum concluded, subject to a sufficient number of bids, with 3 economic operators. The contract takes effect and runs from the first day of the first month following the date of notification. Duration: One year renewals: The contract may be renewed three times for a period of one year. The extension provided in the market is tacit and the holder may not oppose it. The Adjudicator takes power in writing the decision not to renew the contract, at least three months before the due date. The market is held at unit prices. Notwithstanding 10.1.1 GCC - FCS prices are revised, if appropriate, at each contract renewal.

routine maintenance of floor coverings in asbestos-environment.

restoration of market lône Jonage and related alluvial environments in the Grand Parc Miribel Jonage to Vaulx en Velin

Segapal | Published May 10, 2016  -  Deadline May 30, 2016
cpvs
45111291

restoration of market lône Jonage and related alluvial environments in the Grand Parc Miribel Jonage.

General contractors for construction of multi-family rental sixty in senior residence and about 12 individual housing social home Chaponost

semcoda | Published April 27, 2015  -  Deadline May 28, 2015
cpvs
71240000

chaponost - project management for construction of multi-family rental sixty in senior residence and about 12 individual housing social access - sdp approx. 3350m².

Plastering work

Dynacité, office public de l'habitat de l'Ain | Published December 23, 2016
Winner
Wasso Services
cpvs
45410000

The consultation is divided into 21 lots. Each batch is subject to a framework agreement executed by orders show no minimum or maximum concluded, subject to a sufficient number of bids, with 3 economic operators. The contract takes effect and runs from the first day of the first month following the date of notification. Duration: 1 year renewal: the contract may be renewed 3 times for a period of one year. The extension provided in the market is tacit and the holder may not oppose it. The contracting authority shall in writing the decision not to renew the contract, at least three months before the due date. The market is held at unit prices. prices are revised, if appropriate, at each contract renewal. Each batch is subject to a purchase order to the market with 3 traders under the so-called "cascade" through which the offer arrived first shall be deemed economically most advantageous offer.

Routine maintenance Plastering not concerned by painting the issue of environment work in asbestos-occupied dwellings, public areas and various local.

Retirement home construction work

EHPAD de Conches-en-Ouche | Published January 20, 2016  -  Deadline March 11, 2016
cpvs
45421000

The Ehpad of conches-en-ouche began construction of a new facility to increase and diversify its capacity to offer a place of quality of life for dependent elderly people. To meet these objectives, the establishment involves the construction of a new nursing home beds and 169 seats including:

- 92 shelter beds "all dependencies"

- 26 accommodation beds for confused elderly (UPAD)

- 27 beds for aging people with disabilities (uphv)

- 24 days of care places in a distributed cluster of activities and appropriate care (pasa) and a day care center alzheimer (caja).

The future establishment also hosts a Nursing Service at Home (SSIAD) for taking care of 40 seats.

The chosen site for construction is located in the municipality of conches-en-ouche, on a plot of 32,000 square meters. The estimated total area of ​​the project is 9000 square meters in maximum work surfaces. This project incorporates an environmental approach based repository habitat and environment dedicated to ehpad whose mastery of artwork will be responsible for the management.