Call +44 800 9755 164

Public tenders for environment in Metz France

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Réalisation d'un parking en surface de 100 places environ à la gare de Mommenheim

Region grand est | Published February 8, 2017  -  Deadline March 13, 2017
cpvs

Réalisation d'un parking en surface de 100 places environ à la gare de Mommenheim

Technical Assistance Mission for connecting production facilities, mainly photovoltaic Concession URM, within about 40km around Metz

Urm | Published June 7, 2016  -  Deadline June 27, 2016
cpvs

Technical Assistance Mission for connecting production facilities, mainly photovoltaic

Supply of electricity for losses networks for 2018 (excluding ARENH) volume about 72 gwh in Metz

urm | Published April 23, 2015  -  Deadline May 15, 2015
cpvs
31682000, 09310000

supply of electricity for losses networks for 2018 (excluding Arenh) Volume about 72 GWh.

Secondary school construction work

Région Lorraine | Published April 29, 2015
Winner
Eiffage travaux publics
cpvs
45214220

The program of work consists of the heavy restructuring externship buildings, boarding, demolition of existing building and a day school administration, the construction of the administration building with landscaping. The surface excluding net restructuring work is approximately 12,000 square meters. The restructuring work includes modifications of spaces, interior volumes, requalification of the built environment and architecture including the replacement of technical facilities and equipment primarily within externship buildings 1 and boarding. A construction of an administrative building with a total area excluding net work of approximately 3,000 m² and demolition of day schools 2 and 3, and the administration building about 2,400 square meters, complete the operation. The work is taking place in occupied site and the phasing of different interventions for use in existing should take into account the constraints linked to the activity of the high school, about 1 200 people on this site Malraux, with strict observance of periods and time running. The school is located in the perimeter of Vauban Longwy heritage.

Secondary school construction work

Région Lorraine | Published December 6, 2014  -  Deadline February 3, 2015
cpvs
45214220

The work program consists of the heavy restructuring externship buildings, boarding, demolition of existing building and a day school administration, the construction of the administration building with landscaping. The overall net work surface to restructure is about 12,000 square meters. The restructuring work includes changes to spaces, interior volumes, requalification of the built environment and architecture including the replacement of technical facilities and equipment primarily in buildings 1 and Day School Internat. A construction of an administrative building with a total area excluding net work of about 3,000 m² and demolition of 2 and 3 day schools and the administration building, about 2400 square meters, complete the operation. The work is taking place in occupied site and the phasing of different interventions for use in existing should take into account the constraints related to the activity of the high school, about 1 200 people on this site Malraux, with strict observance of periods and time running. The school is located in the perimeter of Vauban Longwy Heritage.

Sewage, refuse, cleaning and environmental services

Société nationale immobilière — établissement Nord Est | Published February 5, 2015
Winner
AF Propreté
cpvs
90000000

Maintenance contract cleaning the departments 57 and 54.

Engineering studies

Communauté d'agglomération de Metz Métropole | Published December 27, 2014
Winner
<CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME><ORGANISATION><OFFICIALNAME>ESOPE</OFFICIALNAME></ORGANISATION><ADDRESS>2 au Parc</ADDRESS><TOWN>Remilly</TOWN><POSTAL_CODE>57580</POSTAL_CODE><COUNTRY VALUE="FR"/><PHONE>+33 387734996</PHONE></CONTACT_DATA_WITHOUT_RESPONSIBLE_NAME>
cpvs
71335000

Scientific monitoring services on the Natura 2000 site - component forest environments and amphibians.

Environmental security control services

Région Lorraine | Published January 13, 2016
Winner
AC Environnement
cpvs
90714600, 71315400

The benefits are to be realized in the framework of the management of risks related to asbestos in the property assets within the jurisdiction of the Regional Council of Lorraine, including: - diagnosis necessary for the conduct of technical asbestos files - diagnosis before demolition or work - measures of dust, - assessment of the conservation status of products and materials containing asbestos, - visual examination after asbestos removal, - collection and timely analysis of materials or products that contain asbestos.

Environmental engineering consultancy services

DREAL Lorraine | Published October 2, 2015
Winner
Groupement Iris Conseil — eSOPE
cpvs
71313000

The contract is for the updating of environmental studies and hydraulics, and the constitution of CNPN waiver application files and authorization under the water police.

Environmental security control services

Région Lorraine | Published August 26, 2015  -  Deadline October 1, 2015
cpvs
90714600, 79419000

The benefits are to be realized in the framework of the management of risks related to asbestos in the property assets within the jurisdiction of the Regional Council of Lorraine, including: - diagnosis necessary for the achievement of asbestos technical files; - Diagnosis before demolition or work; - Measures of dust; - Assessment of the conservation status of products and materials containing asbestos; - Visual examination after asbestos removal; - Collection and timely analysis of materials or products that may contain asbestos.

6th environmental monitoring plan and releases the waste recovery center.

Haganis | Published December 18, 2014
Winner
Micropolluants TechnologieZAC de Grimont, 4 rue de Bort-les-OrguesSaint-Julien-lès-Metz 57070
cpvs
71620000

6th environmental monitoring plan and releases the waste recovery center. Separate market orders with maximum and a trader.
  • 1