Public tenders for environment in Marignane France

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Software maintenance and repair services

Société Aéroport Marseille Provence | Published September 29, 2015  -  Deadline October 23, 2015
cpvs
72267000, 72267100, 72262000

Application management FI, CO, AA and MM application SAP ECC6 - technical (specific developments) and functional (setting). - Preventive maintenance (versions and Support Packages and SAP administration), - corrective maintenance, - evolutionary maintenance (small changes and developments "Projects" mode), - technical and functional expertise on-site services - on-site training. Integration projects based on SAP modules FI, CO, AA, MM existing or implementation of new modules. Consulting services in the SAP environment, its evolution and its ecosystem.

Maintenance and repair of computer equipment

Société aéroport Marseille Provence | Published October 2, 2015  -  Deadline October 19, 2015
cpvs
50312000, 50324100

Providing IT support for desktop workstations and multimedia systems (video-conference room projectors), operational maintenance unmarked positions for airlines and airport IT systems. The appeal decision will be via a platform for the resolution remotely if possible. The work station and multimedia support is covered with 8:00 a.m. to 6:00 p.m. 5d / 7, outside these hours, intervention may be required (Microsoft Office environment). The operational maintenance unmarked stations and terminal systems with control servers is covered in 5:00 a.m. to 10:00 p.m. 7/7. Setting screens of the passenger information system and control servers. The perimeter workstation consists of 450 stations and a hundred IPhone and IPad terminals, 6 meeting rooms multimedia, videoconferencing room. The projectors park: 20 equipment. The airport perimeter is composed of 120 PC workstations and 240 devices (mostly printers IER). Other systems Terminal 20 barcode readers. The number of interventions is estimated at 650 per month.

Snow-clearing services

Société aéroport Marseille Provence | Published December 2, 2015
cpvs
90620000

Mise en œuvre de toutes les dispositions nécessaires à la permanence de l'ouverture de l'aéroport au trafic aérien durant la période hivernale (du 15 novembre au 15 mars) côté zone publique: infrastructures routières, route, parcs et accès. Concernant le lot 2, le déneigement se fera sur 2 niveaux d'intervention suivant les hauteurs de neige. Moyens matériels pour le premier niveau: environ 6 véhicules à prévoir (tracteur, mini chargeurs à chenille, tractopelle, camion grue). Moyens matériel pour le deuxième niveau: environ 10 véhicules à prévoir (tracteur, mini chargeurs à chenille, tractopelles, camions). Moyens humains pour chacun des 2 niveaux: chauffeurs et chauffeurs en remplacement de manière à assurer une prestation de déneigement en continue

Road construction works

Société Aéroport Marseille Provence | Published April 15, 2017  -  Deadline May 15, 2017
cpvs
45233120, 71322000, 45221000, 45112730

A global mission design and construction will be entrusted to redevelop the roundabout Lavender from Marseille Provence Airport which consists of:

Create resized roundabout;

Perform a one-way hopper from MP2 and Fret zone to the output of the AMP;

Creation of a rainwater treatment plant (WWTP).

Rehabilitation of existing pavements optional.

Different solutions will be studying for the realization of the covered hopper / open and direct access ramp. Thus the operator will be responsible for:

In design phase: Project studies (PRO); implementation studies (EXE) and complementary missions modeling traffic flows, regulatory studies (ICPE, Environment ...) and OPC.

Phase implementation: management of the execution of works (DET); construction of works; assistance to receive operations (AOR); guarantee perfect completion (GPA) OPC and complementary mission.

The skills required within the team are:

Design: MOE underground road structures; MOE VRD; landscape architecture; traffic studies; lighting; hydraulic; road equipment (traffic signs, restraints, fire safety devices ...).

In realization: civil engineering underground road structures; earthworks; roadways; VRD: dry and wet networks, curbs, sidewalks; landscaping; lighting; security prevention agent; road equipment (traffic signs, restraints, fire safety devices ...).

The objectives are:

- The improvement of road traffic in and out of the airport;

- To confer to this arrangement, the gateway function to the airport (on arrival) and the city of Aix-Marseille-Provence (exit);

- Realize this work without disturbance from the airport traffic;

- Stay in the budget that has set the client.

  • 1