Public tenders for environment in Le-tampon France

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Achieving operating agricultural Diagnostics (Lot 1) and wetland management plan (Lot 2) under the Agri-Environmental etClimatique Project (CEAP) of the terminal

Sicala | Published February 24, 2017  -  Deadline March 13, 2017
cpvs
71335000

Achieving operating agricultural Diagnostics (Lot 1) and wetland management plan (Lot 2) under the Agri-Environmental etClimatique Project (CEAP) of the terminal

Control Framework agreement on good studies and monitoring of the environmental quality of soil on the ZAC Saint Vincent de Paul in Paris 14ème

Spla paris batignolles amenagement | Published February 28, 2017  -  Deadline March 23, 2017
cpvs
90732000

Control Framework agreement on good studies and monitoring of the environmental quality of soil on the ZAC Saint Vincent de Paul in Paris 14ème

Assistance Mission to the Client for High Environmental Quality (HQE) as part of a demolition operation, restructuring, rehabilitation and / or extension

Cci region paris ile de france | Published April 5, 2017  -  Deadline May 4, 2017
cpvs
71310000

Assistance Mission to the Client for High Environmental Quality (HQE) as part of a demolition operation, restructuring, rehabilitation and / or expansion of a housing complex in Paris 10th.

Missions environmental studies, project ZAC Cantebonne: impact assessment, impacts folder natura 2000 feasibility study on the potential for renewable energy, in Villerupt

epa alzette-belval | Published May 21, 2015  -  Deadline June 12, 2015
cpvs
71313400, 71241000

MISSIONS OF ENVIRONMENTAL STUDIES, PROJECT OF ZAC Cantebonne (VILLERUPT) impact study of the effects folder NATURA 2000 feasibility study on the potential for renewable energy, derogation pack regulations protected species and back law water.

Achievement of individual diagnoses farming as part of the implementation of Agro-Environmental and Climate Projects gorges of the upstream Loire and Mézenc. M

conseil general de la haute-loire | Published February 4, 2015  -  Deadline February 20, 2015
cpvs

achievement of individual diagnoses farming as part of the implementation of Agro-Environmental and Climate Projects gorges of the upstream Loire and Mézenc

Preparation of an application for environmental authorization for the project to serve the Port of Bonneuil-sur-Marne by the RN406 in the Val-de-Marne (94).

Meeddm | Published April 20, 2017  -  Deadline May 15, 2017
cpvs

The consultation concerns the preparation of an application for environmental authorization in accordance with Order 2017-81 of 26 January 2017 and Decrees 2017-81 and 2017-82 of 26 January 2017 and assistance to the Until the authorization for the project to serve the Port of Bonneuil-sur-Marne by the RN406 in the Val-de-Marne (94).

Conducting an environmental assessment and drafting of the management documents for the wetlands of La Héronnière in Fains-Veel and La Ballastière in Ligny-en-Barrois

Communaute agglo bar le duc sud meuse | Published April 21, 2017  -  Deadline May 12, 2017
cpvs

Conducting an environmental assessment and drafting of the management documents for the wetlands of La Héronnière in Fains-Veel and La Ballastière in Ligny-en-Barrois

This contract concerns the monitoring of the environmental impact in the vicinity of two treatment centers by incineration in the commune of thonon les bains.

Stoc | Published August 1, 2017  -  Deadline August 23, 2017
cpvs

This contract concerns the monitoring of the environmental impact in the vicinity of two treatment centers by incineration (domestic waste and sewage sludge).

17-SAJ-08 | landscape and environmental maintenance of memorial sites in Management Department of the Meuse on the battlefields of Verdun and Argonne

Conseil Général de la Meuse | Published April 5, 2017  -  Deadline May 4, 2017
cpvs
77314000

landscape and environmental maintenance of memorial sites in Management Department of the Meuse on the battlefields of Verdun and Argonne

CONTROL FOR THE RESTORATION OF THE ENVIRONMENTAL CONTINUITY OF THE ANGOULÊME AND PLANNING PROGRAM FOR THE BARATAGE IN GOMETZ-LE-CHÂTEL AND BURES-SUR-YVETTE (

Siahvy | Published May 23, 2017  -  Deadline June 30, 2017
cpvs
71200000

Project manager for the restoration of the ecological continuity of the Angoulême and flood control program at the site of Baratage in Gometz-le-Châtel and Bures-sur-Yvette (91)

COORDINATION MISSION COORDINATION SAFETY AND HEALTH PROTECTION (SPS) LEVEL I FOR ENVIRONMENTAL AND ENERGY OPTIMIZATION OF THE TECHNICAL INSTALLATIONS OF THE UVE.

Smitom du ctre ouest seine et marnais | Published June 8, 2017  -  Deadline June 28, 2017
cpvs
71317200

COORDINATION MISSION COORDINATION SAFETY AND HEALTH PROTECTION (SPS) LEVEL I FOR ENVIRONMENTAL AND ENERGY OPTIMIZATION OF THE TECHNICAL INSTALLATIONS OF THE UVE.

The purpose of this contract is to carry out an environmental analysis of the impact of the revamping of the master plan for the South Rer.

Syndicat des transports ile-de-france | Published June 8, 2017  -  Deadline June 29, 2017
cpvs
90713000

The purpose of this contract is to carry out an environmental analysis of the impacts of the revamping of the RER B South Master Plan.

Work for the restoration of the sanitary facilities of the lodging 'Le Chêne' at the environmental education center of Amaury / Hergnies

Syndicat mixte parc naturel regional | Published August 29, 2017  -  Deadline September 29, 2017
cpvs

Work for the restoration of the sanitary facilities of the accommodation 'Le Chêne' at the Environmental Education Center of Amaury / Hergnies

SUPPLY AND DELIVERY OF FRESH FRUITS AND VEGETABLES OF SEASON, QUALITY, LOW ENVIRONMENTAL IMPACT FOR THE CITY OF SEPTEMES THE VALLONS

Ville de septemes-les-vallons | Published September 7, 2017  -  Deadline September 27, 2017
cpvs
03220000

SUPPLY AND DELIVERY OF FRESH FRUITS AND VEGETABLES OF SEASON, QUALITY, LOW ENVIRONMENTAL IMPACT FOR THE CITY OF SEPTEMES THE VALLONS

Completion of the environmental assessment of Streams 4 and 5 of the Strategic Project 2019-2023 of the major marine port of the meeting.

Grand port maritime de la reunion | Published October 2, 2017  -  Deadline October 19, 2017
cpvs

Completion of the environmental assessment of components 4 and 5 of the strategic project 2019-2023 of the Grand Maritime Port of Réunion.

Assistance mission to project management, operating control, environmental monitoring for the construction of an ehpad with certification nf hqe and passiv haus labeling, with bim process

C.h. de saint amand les eaux | Published September 28, 2017  -  Deadline October 27, 2017
cpvs
71312000

Assistance mission to project management, operating control, environmental monitoring for the construction of an EHPAD with NF HQE certification and the PASSIV HAUS label, with BIM process start of the service: upon notification

Framework agreement with purchase orders for studies, management and monitoring of the environmental quality of the site and soil of the ZAC Chapelle Charbon in Paris 18th.

Spla paris batignolles amenagement | Published March 16, 2018  -  Deadline April 9, 2018
cpvs
90732000

Framework agreement with purchase orders for studies, management and monitoring of the environmental quality of the site and soil of the ZAC Chapelle Charbon in Paris 18th.

Coordinated implementation of an impact study and related environmental studies (air quality study, acoustic and vibratory study, feasibility study on the potential of

Soc pub locale amenagement paris batig | Published May 4, 2018  -  Deadline June 5, 2018
cpvs
71313400

Coordinated implementation of an impact study and related environmental studies (air quality study, acoustic and vibration study, feasibility study on the development potential of renewable energies) prior to the creation of a ZAC on the sector Train Stations - Girls (Paris 18th) - 4 LOTS

Acquisition of two granulometers for the chemical pollutants laboratory of the Parisian Department of Environmental Health of the City of Paris

Ville de paris | Published February 28, 2018  -  Deadline March 30, 2018
cpvs

Supply and delivery of two optical granulometers for real-time and continuous monitoring of PM2.5 and PM10 fractions of suspended particles.

Pre-operational study to carry out work for the Amaury Environmental Education Center and for the Regional Natural Park Scarpe-Escaut House

Syndicat mixte parc naturel regional | Published June 29, 2018  -  Deadline September 10, 2018
cpvs

Pre-operational study to carry out work for the Amaury Environmental Education Center and for the House of the Scarpe-Escaut Regional Natural Park