Public tenders for environment in Le-tampon France

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Work for the restoration of the sanitary facilities of the lodging 'Le Chêne' at the environmental education center of Amaury / Hergnies

Syndicat mixte parc naturel regional | Published August 29, 2017  -  Deadline September 29, 2017
cpvs

Work for the restoration of the sanitary facilities of the accommodation 'Le Chêne' at the Environmental Education Center of Amaury / Hergnies

17-SAJ-08 | landscape and environmental maintenance of memorial sites in Management Department of the Meuse on the battlefields of Verdun and Argonne

Conseil Général de la Meuse | Published April 5, 2017  -  Deadline May 4, 2017
cpvs
77314000

landscape and environmental maintenance of memorial sites in Management Department of the Meuse on the battlefields of Verdun and Argonne

CONTROL FOR THE RESTORATION OF THE ENVIRONMENTAL CONTINUITY OF THE ANGOULÊME AND PLANNING PROGRAM FOR THE BARATAGE IN GOMETZ-LE-CHÂTEL AND BURES-SUR-YVETTE (

Siahvy | Published May 23, 2017  -  Deadline June 30, 2017
cpvs
71200000

Project manager for the restoration of the ecological continuity of the Angoulême and flood control program at the site of Baratage in Gometz-le-Châtel and Bures-sur-Yvette (91)

COORDINATION MISSION COORDINATION SAFETY AND HEALTH PROTECTION (SPS) LEVEL I FOR ENVIRONMENTAL AND ENERGY OPTIMIZATION OF THE TECHNICAL INSTALLATIONS OF THE UVE.

Smitom du ctre ouest seine et marnais | Published June 8, 2017  -  Deadline June 28, 2017
cpvs
71317200

COORDINATION MISSION COORDINATION SAFETY AND HEALTH PROTECTION (SPS) LEVEL I FOR ENVIRONMENTAL AND ENERGY OPTIMIZATION OF THE TECHNICAL INSTALLATIONS OF THE UVE.

The purpose of this contract is to carry out an environmental analysis of the impact of the revamping of the master plan for the South Rer.

Syndicat des transports ile-de-france | Published June 8, 2017  -  Deadline June 29, 2017
cpvs
90713000

The purpose of this contract is to carry out an environmental analysis of the impacts of the revamping of the RER B South Master Plan.

This contract concerns the monitoring of the environmental impact in the vicinity of two treatment centers by incineration in the commune of thonon les bains.

Stoc | Published August 1, 2017  -  Deadline August 23, 2017
cpvs

This contract concerns the monitoring of the environmental impact in the vicinity of two treatment centers by incineration (domestic waste and sewage sludge).

Acquisition of two granulometers for the chemical pollutants laboratory of the Parisian Department of Environmental Health of the City of Paris

Ville de paris | Published February 28, 2018  -  Deadline March 30, 2018
cpvs

Supply and delivery of two optical granulometers for real-time and continuous monitoring of PM2.5 and PM10 fractions of suspended particles.

Framework agreement with purchase orders for studies, management and monitoring of the environmental quality of the site and soil of the ZAC Chapelle Charbon in Paris 18th.

Spla paris batignolles amenagement | Published March 16, 2018  -  Deadline April 9, 2018
cpvs
90732000

Framework agreement with purchase orders for studies, management and monitoring of the environmental quality of the site and soil of the ZAC Chapelle Charbon in Paris 18th.

Coordinated implementation of an impact study and related environmental studies (air quality study, acoustic and vibratory study, feasibility study on the potential of

Soc pub locale amenagement paris batig | Published May 4, 2018  -  Deadline June 5, 2018
cpvs
71313400

Coordinated implementation of an impact study and related environmental studies (air quality study, acoustic and vibration study, feasibility study on the development potential of renewable energies) prior to the creation of a ZAC on the sector Train Stations - Girls (Paris 18th) - 4 LOTS

Pre-operational study to carry out work for the Amaury Environmental Education Center and for the Regional Natural Park Scarpe-Escaut House

Syndicat mixte parc naturel regional | Published June 29, 2018  -  Deadline September 10, 2018
cpvs

Pre-operational study to carry out work for the Amaury Environmental Education Center and for the House of the Scarpe-Escaut Regional Natural Park

This contract is for a project management assistance mission for the environmental quality of the maintenance and storage site (smr) of operation t zen 5.

Syndicat des transports ile-de-france | Published June 22, 2018  -  Deadline July 24, 2018
cpvs

This contract is for a project management assistance mission for the environmental quality of the maintenance and storage site (SMR) of the T Zen 5 operation located at the Lugo Choisy-le-Roi Avenue. The missions are broken down into six (05) types of missions: - Mission 1: Analysis of the aspect QEB in the offers of prime contractor SMR.- Mission 2: Assistance for the studies of design and the consultation of the companies works: APS to ACT.- Mission 3: Assistance to the realization: EXE - AOR.- Mission 4: Assistance to the drafting of the contract of exploitation of the SMR.- Mission 5: Evaluation of the environmental performances during the year of perfect completion. The details of these missions are specified in the CCP of this contract.

Study on identifying the success factors of agri-environmental and climate projects (ACAPs) for the needs of the SSP at MAA

Ministere de l'agriculture | Published July 3, 2018  -  Deadline September 3, 2018
cpvs

Study on the identification of the success factors of agri-environmental and climate projects (CEAP) for the needs of the Statistics and Foresight Department at the Ministry of Agriculture and Food (MAA)

The future provider will have to study and design a project for the environmental requalification of the RN118 sanitation. The project of dedicated tracks is separated into two perimeters:

Meeddm | Published July 13, 2018  -  Deadline September 4, 2018
cpvs
71335000

The future provider will have to study and design a project for the environmental requalification of the RN118.The dedicated track project is divided into two perimeters: -a perimeter north of the A86 including the corridors Paris-1 and Vélizy-1 -a perimeter south of the A86 including the Vélizy-2 corridor.

Elaboration of the regional air and energy plan of the Mediterranean Community of Commons Moors Gate and its strategic environmental assessment

Cc mediterranee porte des maures | Published July 16, 2018  -  Deadline August 13, 2018
cpvs

Elaboration of the Climate Air Territorial Energy Plan (PCAET) of the Mediterranean Community of Commons Porte des Maures and its strategic environmental assessment

Bibliographic studies and realization of prototypes through densimage containing NTCs within the framework of the ENSEMBLE project (ENSimage Element Major for Environmental Screening)

Ecole national sup. d'arts et metiers | Published July 16, 2018  -  Deadline August 23, 2018
cpvs

Bibliographic studies and realization of prototypes through densimage containing NTCs within the framework of the ENSEMBLE project (ENSimage Element Major for Environmental Screening)