Public tenders for environment in Tallinn Estonia

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Custom software development services

Tallinna Sotsiaal- ja Tervishoiuamet | Published November 3, 2017  -  Deadline December 4, 2017
cpvs
72230000

The object of the public procurement is the creation of the PIT2 information system for the disabled people in Tallinn, including designing, interfacing with other information systems, deployment, documentation, technical documentation and manuals, provision of inputs for the procurement of information system hosting and maintenance services, introduction of information available for the introduction of the information system, installation into the living environment and training for use. and 2 year warranty service.

Systems analysis and programming services

Tallinna Kommunaalamet | Published November 9, 2017  -  Deadline December 5, 2017
cpvs
72240000

The object of the public procurement is the creation of an information system for the maintenance, maintenance and restoration of the Tallinn city (hereinafter HHHIS or system) (including the analysis of the initial task, the design of the information system, realization including interfaces with other information systems and introduction, documentation of the information system, preparation of technical documentation and manuals, entry into service of the system, installation in the living environment and training of users and administrators, etc.) and provision of the guarantee service within 2 (two) years. The initial task of creating an information system is presented in Annex 1 of the procurement documents.

English-language print edition of "Life in Estonia" production

Ettevõtluse Arendamise Sihtasutus - HELEN NOORKÕIV | Published May 11, 2017
Winner
Positive Projects OÜ, 10725336, Pärnu mnt 69, Tallinn, 10134 Eesti (EE) Tel.: +372 5024224
cpvs
79800000, 79970000

This contract is in English language, Estonia is a diverse demonstration print edition of "Life in Estonia" Production Outsourcing (hereinafter edition) during the period 2017- 2019, during which a total of eight digits will appear. The target group is internationally active and broad-minded business sector. The publication is aimed at raising awareness about Estonia and the Estonian economic environment credibility in the eyes of potential foreign investors and trading partners in order to encourage foreign investment in Estonia, and the creation of new trade relations.

Saaremaa employer outreach event for people with special needs and for supporting recruitment

Eesti Töötukassa - HELINA REMMIK | Published April 25, 2017
Winner
OÜ Projektiekspert, 10893683, Endla 4, Tallinn, 10142 Eesti (EE) Tel.: +372 5074717 URL: www.projektid.ee
cpvs
80400000

Employers have the willingness to employ or she has been recruited by the reduced work capacity of people, but it needs information on how to support people with disabilities taking up employment or further development of the knowledge of the special needs. Notification The event aims to raise awareness of people with occupational employment support options, including practical measures recommended in special needs people into work and staying at work, work environment and work community integration.

Graphics software development services

Ettevõtluse Arendamise Sihtasutus | Published October 6, 2017
Winner
Telia Eesti AS
cpvs
72212322, 92111220, 72212000

Creating a virtual environment for the promotion of Estonian digital assets and the introduction of e-solutions requires the development of an innovative solution that includes the development of web-based, mobile api, video and the necessary automatic updating tools. This is a framework agreement, the contracting authority has no obligation to order works in the maximum amount indicated in clause II.1.7 of the report).

Systems analysis and programming services

Tallinna Kommunaalamet | Published November 11, 2017  -  Deadline December 11, 2017
cpvs
72240000

The object of the public procurement is the creation of an information system for the maintenance, maintenance and restoration of the Tallinn city (hereinafter HHHIS or system) (including the analysis of the initial task, the design of the information system, realization including interfaces with other information systems and introduction, documentation of the information system, preparation of technical documentation and manuals, entry into service of the system, installation in the living environment and training of users and administrators, etc.) and provision of the guarantee service within 2 (two) years. The initial task of creating an information system is presented in Annex 1 of the procurement documents.

The design and construction of the Purtse River, Kohtla River and fenoolisoo residual waste to be remedied. FIDIC Engineer and owner supervision services

Keskkonnaministeerium - Kristjan Rõivassepp | Published September 19, 2016
Winner
Sweco EST OÜ, 10633373, Veerenni 58a, Tallinn, 11314 Eesti (EE) Tel.: +372 6799530
cpvs
71310000, 90733100, 71521000, 71315300, 71248000

The proposed work aims FIDIC Engineer and owner supervision services engineering construction work, which is carried out in the framework of past pollution safety is Purtse River, Kohtla River and fenoolisoo region. The overall project objective is the localization of contaminated sites, pollution prevention and overall environmental Remediation. As a result of achieving the following objectives: - Organize Fenoolisoo about 14 ha, ditch system construction and Varbe ditch sediment purification ca 2000 m and the construction of a pumping station with electricity and survetrassiga; - Kohtla river polluted soil treatment ca 11 800 m, bypassing the ditches with culverts, rapids and other elements, about 5000 m, forest drainage reconstruction of approximately 180 hectares, the village ditch companies of pollution investigation and liquidation of about 850 m; - Püssi Purtse river and broke the gate between the part of the polluted soil and mud winding around 1 450 m. As a result of the following goals must be achieved: - the excavated soil is cleaned Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Backfilling the excavated soil to soil meets the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number; - At the end of the work, bleed and work areas used to restore nature friendly situation.

The design and construction of the Purtse River, Kohtla River and fenoolisoo residual waste to be remedied. FIDIC Engineer and owner supervision services

Keskkonnaministeerium - Kristjan Rõivassepp | Published July 1, 2016  -  Deadline August 11, 2016
cpvs
71310000, 90733100, 71521000, 71315300, 71248000

The proposed work aims FIDIC Engineer and owner supervision services engineering construction work, which is carried out in the framework of past pollution safety is Purtse River, Kohtla River and fenoolisoo region. The overall project objective is the localization of contaminated sites, pollution prevention and overall environmental Remediation. As a result of achieving the following objectives: - Organize Fenoolisoo about 14 ha, ditch system construction and Varbe ditch sediment purification ca 2000 m and the construction of a pumping station with electricity and survetrassiga; - Kohtla river polluted soil treatment ca 11 800 m, bypassing the ditches with culverts, rapids and other elements, about 5000 m, forest drainage reconstruction of approximately 180 hectares, the village ditch companies of pollution investigation and liquidation of about 850 m; - Püssi Purtse river and broke the gate between the part of the polluted soil and mud winding around 1 450 m. As a result of the following goals must be achieved: - the excavated soil is cleaned Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Backfilling the excavated soil to soil meets the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number; - At the end of the work, bleed and work areas used to restore nature friendly situation.

The design and construction of the Purtse River, Kohtla River and fenoolisoo remedied residual pollution

Keskkonnaministeerium - Kristjan Rõivassepp | Published April 29, 2016  -  Deadline May 16, 2016
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The contract proposed work aims residual waste harmless, and the design of works Purtse River, Kohtla River and fenoolisoo region. The contract involves the following main tasks: - Fenoolisoo trimming about 14 ha, ditch system construction and Varbe ditch sediment purification ca 2000 m and the construction of a pumping station with electricity and survetrassiga; - Kohtla river polluted soil treatment ca 11 800 m, bypassing the ditches with culverts, rapids and other elements, about 2250 m, forest drainage reconstruction of approximately 180 hectares, the village ditch companies of pollution investigation and liquidation of about 850 m; - Püssi Purtse river and broke the gate between the part of the polluted soil and mud winding around 1 450 m. As a result of achieving the following objectives: - the excavated soil must be cleaned by the Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Backfilling the excavated soil using the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number; - At the end of the work, all the endangered and work areas used to be restored in an eco-friendly situation.

The design and construction of the Purtse River, Kohtla River and fenoolisoo remedied residual pollution

Keskkonnaministeerium - Kristjan Rõivassepp | Published May 16, 2016  -  Deadline June 1, 2016
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The contract proposed work aims residual waste harmless, and the design of works Purtse River, Kohtla River and fenoolisoo region. The contract involves the following main tasks: - Fenoolisoo trimming about 14 ha, ditch system construction and Varbe ditch sediment purification ca 2000 m and the construction of a pumping station with electricity and survetrassiga; - Kohtla river polluted soil treatment ca 11 800 m, bypassing the ditches with culverts, rapids and other elements of approximately 5,000 m, forest drainage reconstruction of approximately 180 hectares, the village ditch companies of pollution investigation and liquidation of about 850 m; - Püssi Purtse river and broke the gate between the part of the polluted soil and mud winding around 1 450 m. As a result of achieving the following objectives: - the excavated soil must be cleaned by the Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Backfilling the excavated soil using the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number; - At the end of the work, all the endangered and work areas used to be restored in an eco-friendly situation.

The design and construction of the Purtse River, Kohtla River and fenoolisoo remedied residual pollution

Keskkonnaministeerium - Kristjan Rõivassepp | Published May 12, 2016  -  Deadline May 30, 2016
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The contract proposed work aims residual waste harmless, and the design of works Purtse River, Kohtla River and fenoolisoo region. The contract involves the following main tasks: - Fenoolisoo trimming about 14 ha, ditch system construction and Varbe ditch sediment purification ca 2000 m and the construction of a pumping station with electricity and survetrassiga; - Kohtla river polluted soil treatment ca 11 800 m, bypassing the ditches with culverts, rapids and other elements of approximately 5,000 m, forest drainage reconstruction of approximately 180 hectares, the village ditch companies of pollution investigation and liquidation of about 850 m; - Püssi Purtse river and broke the gate between the part of the polluted soil and mud winding around 1 450 m. As a result of achieving the following objectives: - the excavated soil must be cleaned by the Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Backfilling the excavated soil using the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number; - At the end of the work, all the endangered and work areas used to be restored in an eco-friendly situation.

Design and construction of the Purtse River, Kohtla River and fenoolisoo residual pollution remedied

Keskkonnaministeerium - Kristjan Rõivassepp | Published May 16, 2017
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The contract of the proposed work is aimed at the design and construction of residual waste harmless Making Purtse River, Kohtla River and fenoolisoo area. The contract includes the following main operations: - trimming Fenoolisoo approximately 14 hectares, a trench of a system for purification and the sediment Varbe trench about 2000 m, and with the power supply and the pumping stations survetrassiga; - purification of soil polluted river Kohtla about 11800 m, with the construction of the trench along the flow of culverts, cataracts, and other elements, about 5,000 m, about 180 hectares of forest drainage of reconstruction, the trench pollution examination companies of the village and winding of about 850 m; - Powder River Purtse between the gate and the hollowed part of the contaminated soil, sludge, and winding about 1450 m. As a result of achieving the following objectives: - excavated soil must be cleaned of the Minister of Environment Regulation No. 38 (the limit values ​​for dangerous substances in the soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - backfilling of the excavated soil using the soil must meet the Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number; - At the end of the work of all endangered and work areas used to be restored to the eco-friendly situation.

Design works for the protection of the pollution of the Purtse River, the Kohtla River and the phenolic stream

Keskkonnaministeerium - Kristjan Rõivassepp | Published July 20, 2017  -  Deadline August 14, 2017
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The purpose of the proposed contract work is to design and construct waste protection contamination in the area of ​​the Purtse River, the Kohtla River and the phenol stream. The contract contains the following main work: • The maintenance of phenol flow at ca 14 ha, the construction of a ditch system and the cleaning of the Pität ditch slope of ca 2,000 m and the construction of a pump with electricity supply and pressure pipelines; • Purification of contaminated soil in the Kohtla River about 11,800 m, construction of bypass with 540 m of clogs, rapids and other elements, reconstruction of the drainage of the forest about 180 ha, investigation and liquidation of the Roodu village trench about 850 m; • Purification of mud and soil contaminated in the Purtse river between Püssi and the dam of the dam is approximately 1 450 m. As a result of the work, the following objectives must be achieved: • the excavated soil must be cleaned up to the living limit established in Regulation No. 38 of the Minister of the Environment (Hazardous Substances Limit Values ​​in Soil https://www.riigiteataja.ee/akt/13348997); • soil used as back ground instead of excavated soil must comply with the target set in the Regulation No. 38 of the Minister of the Environment (limit values ​​for hazardous substances in soil https://www.riigiteataja.ee/akt/13348997); • at the end of the work, all areas used for protection and work must be restored to a natural state that is equivalent to the natural state of the analogous object (water body, coastal area, etc.).

The design and construction of the former Dutch and Mediterranean Priimetsa asphalt plants remedied residual pollution

Keskkonnaministeerium - Kristjan Rõivassepp | Published May 16, 2016  -  Deadline June 1, 2016
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The contract of the proposed work is aimed at the former Mediterranean countries (Mediterranean countries ABT) and Priimetsa (Priimetsa ABT) asphalt plants of residual waste harmless, and the design of works. Priimetsa ABT is located in the town of Valga, Coordinates X: 6406846, Y: 623,396th Mediterranean countries ABT located Valjala field, Coordinates X: 6473386, Y: 438,430th The contract involves the following main tasks: 1. Mediterranean countries ABT - clearing and grubbing of about 14 hectares; - Cleaning of contaminated soil ca 22 000 m3, including the cleaning of polluted soil, Mediterranean countries, existing river and polluted water purification; - Restoration of the natural state (including the amount of soil needed to drive and park). 2. Priimetsa ABT - clearing and grubbing of about 4,5ha; - Infrastructure (shale oil storage facility, a car canal, wood and metal, ancillary buildings and their foundations) winding up; - Cleaning of contaminated soil approximately 10 000 m3, including the cleaning of polluted soil Pedeli river draining into the ditch, and this area of ​​the pond, where appropriate, veetrõje and cleaning; - Restoration of the natural state (including the amount of soil needed to drive and park); - Restoration of the previous situation (the gravel road reconstruction, the necessary amount of soil to transport, landscaping, fencing restoration). As a result of achieving the following objectives: - estimates Controller studied area excavated soil must be cleaned by the Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Instead of backfilling the excavated soil using the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit to the number; - Bodies of water used for backfilling the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number.

The design and construction of the former Dutch and Mediterranean Priimetsa asphalt plants remedied residual pollution

Keskkonnaministeerium - Kristjan Rõivassepp | Published May 12, 2016  -  Deadline May 30, 2016
cpvs
45110000, 90522300, 90523000, 90513500, 45111000, 45112300, 90512000, 90741100, 71310000

The contract of the proposed work is aimed at the former Mediterranean countries (Mediterranean countries ABT) and Priimetsa (Priimetsa ABT) asphalt plants of residual waste harmless, and the design of works. Priimetsa ABT is located in the town of Valga, Coordinates X: 6406846, Y: 623,396th Mediterranean countries ABT located Valjala field, Coordinates X: 6473386, Y: 438,430th The contract involves the following main tasks: 1. Mediterranean countries ABT - clearing and grubbing of about 14 hectares; - Cleaning of contaminated soil ca 22 000 m3, including the cleaning of polluted soil, Mediterranean countries, existing river and polluted water purification; - Restoration of the natural state (including the amount of soil needed to drive and park). 2. Priimetsa ABT - clearing and grubbing of about 4,5ha; - Infrastructure (shale oil storage facility, a car canal, wood and metal, ancillary buildings and their foundations) winding up; - Cleaning of contaminated soil approximately 10 000 m3, including the cleaning of polluted soil Pedeli river draining into the ditch, and this area of ​​the pond, where appropriate, veetrõje and cleaning; - Restoration of the natural state (including the amount of soil needed to drive and park); - Restoration of the previous situation (the gravel road reconstruction, the necessary amount of soil to transport, landscaping, fencing restoration). As a result of achieving the following objectives: - estimates Controller studied area excavated soil must be cleaned by the Minister of Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit on the number; - Instead of backfilling the excavated soil using the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) elumaa set limit to the number; - Bodies of water used for backfilling the soil must meet the Minister of the Environment Regulation No. 38 (hazardous substances concentration limits in soil https://www.riigiteataja.ee/akt/13348997) set the target number.

"Pelguranna tn 31 erihoolekandeasutuse design"

Tallinna Linnavaraamet - Sigrid Vesiallik | Published February 6, 2017  -  Deadline March 3, 2017
cpvs
71240000

The contracting authority is täht¬aegselt goal, and at optimal cost to design and build a special welfare provision building that meets the established requirements, would maintain an as durable and long lasting and maintenance costs which were as low as possible. The building has to be the best possible construction law, energy efficiency and renewable energy technologies, technical solutions sensibly constructed building energy label "A" according to the Economic and taristuministri 06/03/2015 Regulation No. 55 of the "building energy performance requirements" and the indoor environment class II (EVSEN15251).

Welfare services for the handicapped

Sotsiaalkindlustusamet | Published January 27, 2017
Winner
Eesti Hoolekande Selts
cpvs
85311200

Public procurement is a long-term goal of a protected work (PKT), the service, the purpose of providing a protected work to the target group of customers with the opportunity to work on it is protected and customized work environment, a strong development towards social services and assistance in obtaining work in the open labor market.

The target group of the service is a mental disorder, visual impairment, multiple disabilities and / or causing the disease peaaajutraumaga or ahjukahjustust people.

Protected work of the service is provided within the framework of this contract in three stages. Service target groups and service stages is given in Appendix 1 HD (Technical Specifications).

Protected work of the service subscriptions

Sotsiaalkindlustusamet - Merle Salmistu | Published January 24, 2017
cpvs
85311200

Public procurement is a long-term goal of a protected work (PKT), the service, the purpose of providing a protected work to the target group of customers with the opportunity to work on it is protected and customized work environment, a strong development towards social services and assistance in obtaining work in the open labor market. The target group of the service is a mental disorder, visual impairment, multiple disabilities and / or causing the disease peaaajutraumaga or ahjukahjustust people. Protected work of the service is provided within the framework of this contract in three stages. Service target groups and service stages is given in Appendix 1 HD (Technical Specifications).

Iru power jäätmeenergiakatla põlemisrestile curbs Purchase

Eesti Energia Aktsiaselts - Leida Uibo | Published September 5, 2016
cpvs
44912000

HD, Annex 1 Technical description p. 2. The Contractor's responsibility 2.1. Seller is to buy and / or to produce and supply their forces in power (St. Petersburg road 105 74114 Maardu Estonia), and transfer (DDP, Incoterms 2010), the client's representative (see. P.8) new stones (see. Add L1). 2.2. Stones marking: refractory bricks RG1 (BRIQUE DE FORME EN FT AN-63 RG). 2.3. The stones are located in the working environment, which Tmax = 12000C, and must comply with the work under these conditions. 3. The amount of supplied materials: the new supplied amount of stones is 60 pcs (pieces).

Automatic submission and processing of financial information necessary for the development and maintenance of the service with the US FATCA declaration edasiarendus- and maintenance services

Rahandusministeeriumi Infotehnoloogiakeskus - Annika Rokk | Published September 23, 2016
Winner
Nortal AS, 10391131, Lõõtsa 6, Tallinn, 11415 Eesti (EE) Tel.: +372 5120145
cpvs
72262000, 72267000

US FATCA application further development with the creation of functionality that enables the EU Council Directive 2014/107 / EU of 9 December 2014, and the OECD financial accounts concerning the automatic exchange of information standards on the basis of the enforcement of obligations. Development created within the framework of the solution must enable the MTA to adopt the Estonian financial institutions the information necessary to process and transmit to other European Union countries and OECD standards on the basis of information on changing the national competent authority. It also allows the environment to other European Union countries and OECD standards on the basis of that exchange of information from the competent authority for the adoption of similar information and secure processing and storage.