Demolition residential blocks W. Pieck-Str. 63-81, 01983 Großräschen

Kommunale Wohnungsgesellschaft mbH Senftenberg | Published October 17, 2016  -  Deadline November 17, 2016
cpvs
45110000, 45111000, 45111100

Complete demolition residential buildings, incl. Connection Structure (WBS 70/5) Wilhelm Pieck Straße 63-71 and 73-81, 01983 Großräschen 10 inputs, CU100, with about 5.577m² living space, about 29.727,94m³ uR 5 storeys, plus basement. Panel construction (building type WBS 70/5), coring; Demolition and disposal of civil structures; Dismantling of Morinolfugen outdoors; Dismantling of Sokalit (AVV 170605- weakly bound asbestos) in the ventilation shafts, demolition insulating wool (AVV 170603) in Drempelbereich; Dismantling of Kamilit (AVV 170603) in all exterior wall panels (plate separation and fall bed obligatory!); Chiselling for receiving the screed in the floor area (AVV 170106) dismantling of tar paper (AVV 170303) in the roof -and- floor area; Dismantling of Ver -and- disposal facilities; Dismantling of sidewalks, backfilling excavation, terrain straightening, topsoil order, grassing, environment design.

Tree care work in Senftenberg including districts

Stadt Senftenberg, Zentrale Vergabestelle | Published November 25, 2016  -  Deadline December 14, 2016
cpvs
77000000, 77211500

01 cutting actions 01:01 education and construction section 01:02 gauge section 1:03 deadwood removal 1:04 Krone Care 01:05 Kronenauslichtung 1:06 crown regeneration section 1:07 curtailment of Crown Share 1:08 Kroneneinkürzung 1:09 crown backup interface 01:10 pruning in capped crown 01:11 Other section measures 02 crown safeguards 2:01 injury free installable crown fuses 2:02 Not injury free installable crown anchors 02:03 stabilizing torn tribes and branches 2:04 Miscellaneous 03 Baumfällungen 03:01 Baumfällung in Absetztechnik 03:02 Baumfällung remove forestry usual 04 stump 04:01 stump mill out 04:02 stump clearing 05 tree environment improvement 5:01 unsealing 5:02 soil loosening, ventilation, irrigation 05:03 soil replacement 5:04 nutrient 06 Miscellaneous 06:01 treatment of tree damage 6:02 tree protection 06:03 works in the root zone 06:04 Others 07 allowances

Environmental improvement works

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published February 7, 2017  -  Deadline March 10, 2017
cpvs
45262640

For monitoring / professional technical support of "measures to source strength reduction by soil replacement" awarded by the LMBV mbH separate engineering services.

To monitor / accompany times technically Here are the different parallel partial services that are carried out in total for the source strength reduction by soil replacement.

According to the findings soil and groundwater by mono-aromatic hydrocarbons (BTEX), phenols, polycyclic aromatic hydrocarbons (PAH) and petroleum hydrocarbons are (KW) highly contaminated.

To reduce this source of character, it is provided by Bodenaustausch- and -reinigungsmaßnahmen make the Schwarze Pumpe industrial estate a source strength reduction.

The basic restoration goal of source strength reduction by soil replacement (QMBA) consists in the sustainable support and shorten the current on-site groundwater treatment through the elimination of pollutant foci, which are still effective as sources of contamination of groundwater.

The following parallel partial services are performed for the source strength reduction by soil replacement:

- Construction / operation VTRA (vacuum thermal treatment plant) and soil replacement,

- Photo documentation of the construction of VTRA and video surveillance (VÜ) the excavation work in the single sheet pile casings,

- Measures for the permanent measurement Technical Inspection (MT) of the air extraction and cleaning of work areas and the ambient air in the processing of single sheet pile casings,

- External disposal incurred hazardous and non-hazardous waste.

The services to be performed include site supervision (ÖBÜ) / Trade Technical support (FB) of the abovementioned remedial measures.

The contractor is obliged to work in accordance with the mining and water law Apart provisions of the operational plans and to ensure compliance.

forming mountain legal basis for the site supervision / technical Technical support the current operating plans and permits, as well as planning and advice.

Focus of the renovation work to source strength reduction are the services to build and operate a vacuum thermal treatment plant and associated soil replacement works (measure 1,511,400,107).

The already published tender documents to measure 1511400107 - Construction / operation VTRA and soil replacement can be found at the shopping portal https://www.lmbv-einkauf.de/vtsp.htm LMBV.

All documents which are required according to the system "Rating Matrix" are not subsequently requested by the client and have already submitted with the offer.

Environmental improvement works

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published November 2, 2016
cpvs
45262640, 45200000, 45252000, 45262212

Planning, building and operating a vacuum thermal treatment plant (VTRA) and soil replacement for pregelatinized reduction in pollutant 4 main source areas.

Environmental improvement works

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published November 2, 2016  -  Deadline January 19, 2017
cpvs
45262640, 45200000, 45252000, 45262212

Planning, building and operating a vacuum thermal treatment plant (VTRA) and soil replacement for pregelatinized reduction in pollutant 4 main source areas

Environmental engineering consultancy services

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published March 17, 2017  -  Deadline April 18, 2017
cpvs
71313000

As part of the redevelopment of the former lignite mine Schlabendorf and Seese the continuation of the existing hydrogeological Greater model (BGM) is required. For this purpose first a major overhaul and upgrade and recalibration / plausibility of the existing model is the acquisition, required. As a result, model calculations are carried out for scenarios and variants of geohydraulic situation. The HGM is to operate as a process accompanying constantly working model (SAM).

Environmental engineering consultancy services

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published April 14, 2017
Winner
Ingenieurbüro für Grundwasser GmbH
cpvs
71313000

As part of the refurbishment of the rear portions of the former lignite mine Jaenschwalde the continuation of the existing hydrogeological large space model (HGM) is required. For this, the implementation of LMBV model into the existing LEAG model and a model extension to the areas south of the lake Klinger are initially provided. Based on this, done a major overhaul and upgrade and recalibration / plausibility of the model. The model is to operate as a process accompanying constantly working model (SAM).

As part of the refurbishment of the rear portions of the former lignite mine Jaenschwalde the continuation of the existing hydrogeological large space model (HGM) is required. In future only a hydrogeological Large-scale model will be operated jointly between the companies and LEAG LMBV for reasons of consistency and transparency of results for the area Cottbus-Nord / Jänschwalde. For this, the implementation of LMBV model into the existing LEAG model and a model extension to the areas south of the lake Klinger are initially provided. Based on this, done a major overhaul and upgrade and recalibration / plausibility of the model. As a result, calculations are carried out for scenarios and variants of geohydraulic situation. The model is to operate as a process accompanying constantly working model (SAM).

Environmental engineering consultancy services

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published May 26, 2017
Winner
Ingenieurbüro für Grundwasser GmbH
cpvs
71313000

The continuation of the existing hydrogeological large-scale model (HGM) is necessary as part of the refurbishment of the rear areas of the former brown coal mine building Jänschwalde. For this purpose, the implementation of the LMBV model in the existing LEAG model and a modell extension to the areas south of the Klinger Lake are planned. Based on this, a comprehensive revision, updating and re-calibration / plausibility check of the model is carried out. The model is to be operated as a continuous working model (SAM).

The continuation of the existing hydrogeological large-scale model (HGM) is necessary as part of the refurbishment of the rear areas of the former brown coal mine building Jänschwalde. In the future, only a hydrogeological large-scale model is to be shared between the companies LEAG and LMBV for consistency and transparency of the results for the Cottbus-Nord / Jänschwalde area. Firstly, the implementation of the LMBV model in the existing LEAG model and a modeller extension around the areas south of Lake Klinger are planned. This is followed by a comprehensive revision, as well as updating and re-calibrating / plausibilizing the model. As a result, calculations for scenarios and developmental variants of the geohydraulic situation are to be carried out. The model is to be operated as a continuous working model (SAM).

Environmental improvement works

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published January 19, 2016  -  Deadline March 16, 2016
cpvs
45262640, 45200000, 45252000, 45262212

1511400107 construction / operation of a thermal vacuum cleaning system (VTRA) and soil replacement Schwarze Pumpe.

Sewage, refuse, cleaning and environmental services

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published December 1, 2015
Winner
Harbauer GmbH
cpvs
90000000, 90733900

Operating the wells, the groundwater purification system, infiltration wells and groundwater monitoring wells in the area of ​​Abproduktenhalde terpene.

Sewage, refuse, cleaning and environmental services

LMBV Lausitzer und Mitteldeutsche Bergbau-Verwaltungsgesellschaft mbH | Published July 18, 2015  -  Deadline August 19, 2015
cpvs
90000000, 90733900

Operating the wells, the groundwater purification system, infiltration wells and groundwater monitoring wells in the area of ​​Abproduktenhalde terpene.

Delivery of truck tires, including tire replacement, balancing and environmentally friendly disposal of old tires

Stadt Senftenberg, Zentrale Vergabestelle | Published December 16, 2016  -  Deadline January 5, 2017
cpvs
34330000, 34352100

Delivery of truck tires, including tire replacement, balancing and environmentally friendly disposal of old tires

Stadt Senftenberg, Zentrale Vergabestelle | Published December 16, 2016  -  Deadline January 5, 2017
cpvs
34352100, 34330000

It shall be offered tires that comply with the European quality guidelines and have an appropriate balance between safety and durability. The tire change is to take place within one working day at Hauptleistungsort. In the choice of used-added technical means for raising and lowering of the vehicle, the contractor is free. All about changing tires are on steel rims. Tire pressure sensors are not installed. There are only new tires according to the following criteria offer: - Tyre: All season tires with M + S marking; Tire sizes: 305/70 R 22.5; Speed ​​Index least: J; Load Index least: 150/147; Date of manufacture (DOT) from 30 KW / 2016th - Tyre: All season tires with M + S marking; Tire dimensions: 10 R 22.5; Speed ​​Index least: L; Load Index least: 144/142; Date of manufacture (DOT) from 30 KW / 2016th - Tyre: All season tires with M + S marking; Tire dimensions: 195 R 14 C; Speed ​​Index least: L; Load Index least: 106/104; Date of manufacture (DOT) from 30 KW / 2016th - Tyre: All season tires with M + S marking; Tire dimensions: 205 R 14 C; Speed ​​Index least: N; Load Index least: 105/103; Date of manufacture (DOT) from 30 KW / 2016th In addition, to provide the following services for each vehicle: - balancing (including weights); - Installation (without incidentals); - Environmentally friendly disposal of old tires.

Sewage, refuse, cleaning and environmental services

LMBV mbH | Published May 20, 2015
cpvs
90000000

Betreiben, Wartung und Instandhaltung von Anlagen der Grundwassersanierung und -überwachung im Bereich der Abproduktenhalde Terpe.

Apparatus for isothermal titration calorimetry (ITC)

BTU Cottbus - Senftenberg | Published June 28, 2017  -  Deadline August 1, 2017
cpvs
38418000

An apparatus for isothermal titration calorimetry (ITC) is to be used. The device is used to investigate the binding strength of two (bio) molecules or between molecules and nanoparticles. The binding strength is an essential factor in the development of assays and provides information for the determination of optimal reaction environments, temperature profiles, concentrations of biomolecules in our assays. By means of the isothermal titration calorimetry, binding affinity and thermodynamic parameters of biomolecules can be measured directly and without marking. Quantitative information on the interaction of, for example, antigenic antibodies, DNA-DNA and aptamer-receptor, as well as energy release in enzymatic reactions are produced. The method characterizes the interaction of biomolecules thermodynamically in detail. The measurement data thus obtained are comparable to those from surface plasmon resonance (SPR) measurements. The ITC, like the SPR, has its limitations and typical artifacts. If one considers that both methods are completely independent techniques, a comparison of the obtained data is of great importance for their validation. In the literature there are only a few examples for such a validation. In bioanalytical applications, the thermodynamic data of the ITC contribute to the understanding of binding mechanisms and the optimization of bioreceptors for specific analytes. Another possibility is the analysis of energy release in enzymatic catalysis. These studies are important not only for the understanding of the reaction mechanisms, but also for the development of enzymatic biosensors, for the analysis of enzyme or substrate concentrations and for the testing of the integrity of immobilized enzymes.