Public tenders for environment in Niederdorla Germany

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

208 - Software maintenance and software change Intranet Bundeswehr

Bundesamt für Ausrüstung, Informationstechnik und Nutzung der Bundeswehr (BAAINBw) | Published January 20, 2016  -  Deadline February 16, 2016
cpvs

The BAAINBw intends software maintenance and software change services (SWMM services) subcontract. Components in the form of Java portlets, a Bundeswehr specific surface area (Portal Theme) for the implementation of the online style guides of the Bundeswehr as well as various other components in the form of Java Servlets, Web services, and smaller, usually Java based programs. Formation excerpts describes the Rz landscape in which the IntranetBw operated: 2000 managed MIPS; - Backup Jobs: 71 000 per week; - Managed / Used Storage:> 2000 terabytes; - Managed Server:> 3 500 virtualization degree> 85%; 500 000. SAPS; Mails per month. 140 000 PKIBw cards. In the following 4 data center server environments are operated: - Virtualized IBM mainframe server (with z / OS) in Parallel Sysplex cluster; - Virtualized IBM System p servers (AIX) - partially in the high availability cluster; Sinn method fürmittels VMWare virtualized servers; - Cloud computing platform, IBM Pure Systems Aplication - IPAS. In the IT procedures currently IntranetBw following software components are operated among others: - Webshpere (Intranet / Internet portal); - Content Management System Creator (editorial platform Intranet / Internet); - Confluence (Wiki service); - Lucom (Forms Management System); - WebTrends (statistics); - FAST (search engine); - MySQL / DB2 / Oracle (data management). For the portal IntranetBw following figures for March 2015 have been identified: - visits 6 000 000; - Page views 15.7 million; 50 active performances on the platform (clients / sites in virtual portals); - 60,000 content pages; - 620 000 images (including all calculated levels of resolution.); - Of 70 000 other files (PDF, DOC, PPT, etc.); - 175 000 registered users in the portal; - 700-900 active HTTP connections Portal / 300-600 to the private area. For the wiki service of the Bundeswehr following key figures for the October 2015 have been identified: - Global Wiki areas 377; - Personal Wiki areas 842; - Visits 134,600. 130 000 users use the form management system. The following roles are required and are distributed on the basis of the illustrated key on diejährlichen hours volumes of the contractual period: - 10% Project; - 35% Lead developer / architect / analyst; - 45% developer; - 10% quality assurance / Tester.

Broadcast Monitors (DW 16 / 05.02)

Offizielle Bezeichnung: MITTELDEUTSCHER RUNDFUNK | Published June 24, 2016  -  Deadline August 16, 2016
cpvs

The German Wave is planning to conclude a maximum of three framework contracts per lot for retrieval of broadcast monitors with a term of four years (1 November 2016 to 31 October 2020). The retrieval of the framework contracts is carried out both by Deutsche Welle in Bonn than in Berlin or by the participating ARD broadcasters for their corresponding lot. The tender is divided into four lots: • Lot 1: rebate rate on price list (s) Sony broadcast monitors • Lot 2: Off Set on price list (s) JVC broadcast monitors • Lot 3: discount rate on price list (s) NEC broadcast monitors • lot 4: Off set on price list (s) TV LOGIC broadcast monitors offering on one or more lots is allowed. In the case of identical offerings provides that each lot a framework agreement is concluded with a maximum of three economical companies. The calls made in these cases, the "mini competition. The framework agreements must be completed product faithfully to replace existing monitors with new can without making any adjustment to the surrounding systems or their interfaces. In addition, there is a need existing production environments for more monitors to expand. In addition to the monitors already in use at Deutsche Welle, program requirements cause beyond monitor types have to be used that are not covered by the product portfolio of the abovementioned manufacturer. This

Broadcast Monitors

Zentraleinkauf und Logistik | Published August 2, 2016  -  Deadline August 15, 2016
cpvs
32300000

The German Wave is planning to conclude a maximum of three framework contracts per lot for retrieval of broadcast monitors with a term of four years (1 November 2016 to 31 October 2020). The retrieval of the framework contracts is carried out both by Deutsche Welle in Bonn than in Berlin or by the participating ARD broadcasters for their corresponding lot. The tender is divided into four lots: • Lot 1: rebate rate on price list (s) Sony broadcast monitors • Lot 2: Off Set on price list (s) JVC broadcast monitors • Lot 3: discount rate on price list (s) NEC broadcast monitors • lot 4: Off set on price list (s) TV LOGIC broadcast monitors offering on one or more lots is allowed. In the case of identical offerings provides that each lot a framework agreement is concluded with a maximum of three economical companies. The calls made in these cases, the "mini competition. The framework agreements must be completed product faithfully to replace existing monitors with new can without making any adjustment to the surrounding systems or their interfaces. In addition, there is a need existing production environments for more monitors to expand. In addition to the monitors already in use at Deutsche Welle, program requirements cause beyond monitor types have to be used that are not covered by the product portfolio of the abovementioned manufacturer. This

13005_008-09 # 013 office platform industry 4.0

Bundesministerium für Wirtschaft und Energie - Zentrale Vergabestellen IC4 und ZA3 | Published June 17, 2016  -  Deadline July 21, 2016
cpvs
79400000, 75130000, 79951000, 79416200, 79950000, 79400000, 75130000, 79951000, 79416200, 79950000

The platform industry 4.0 is the central Alliance for the coordinated management of the digital structural change in the industry in Germany. As a national and international network node supports German companies, particularly SMEs, to implement industry 4.0. With examples from the nationwide corporate practice, specific recommendations for action and test environments it gives them a decisive impetus. The management of the platform is made by the Minister and the Minister of the ministries responsible BMBF and AG, and representatives of business, trade unions and science. Other bodies of the platform, a strategy group, a steering committee, a scientific advisory committee and five working groups. The operational project management of the platform is supported by an office.

The "office industrial platform 4.0" has been working very successfully since April 2015 and has gained a national and international scope. The originally intended scope of the office has increased significantly and new tasks have been added.
The re-tendering includes the acquisition of the previous work and continuation of the office with extended capabilities. The contract provides in this respect the provision of pre-agreed service modules (standard fee) in combination with the provision of the framework contract blocks.
For further details, see specifications (download e-procurement platform)

Framework agreement to support the project and knowledge management in the development of the employee portal and knowledge management system OfficeNet (ON2).

Beschaffungsamt des Bundesministeriums des Innern | Published July 10, 2015  -  Deadline September 1, 2015
cpvs
72262000, 72267000, 72262000, 72267000

Support in project management and knowledge in the advancement of the employee portal and knowledge management system OfficeNet (ON2) 25 other public administration institutions. OfficeNet was developed on behalf of the Federal Office of Administration and adapted to the present day in various projects in the BVA and expanded. OfficeNet provides the public agencies using a largely finished, preconceived IT solution that can be flexibly adjusted by the on the basis of the underlying open source frameworks to the specific requirements of other authorities and expanded. In all the facilities, however, is largely the same software version configured individually and adjusted to appropriate conditions in use. This includes Software¬entwicklung for the respective system environments of the authorities throughout the country, since in addition to the professional development and continuous modernization of the application system OfficeNet is necessary. Therefore, a framework contract will be awarded with this contract award procedure from which if necessary support services in the areas of consulting and Software¬pflege and -er position to the extent required by the institutions of the German public administration can be found, which are connected to the sector network.

Storage system

Fraun­ho­fer Ge­sell­schaft e.V. | Published October 17, 2014  -  Deadline December 2, 2014
cpvs

Storage system: Fraunhofer Institute for Scientific Technological Trend Analysis (INT) in Euskirchen wants to replace his central storage from 2008 and make fail-safe. That's procuring system should be designed for high availability (two controllers) and for different application servers such as Microsoft SQL, Microsoft Exchange 2010, MS SharePoint, Microsoft Hyper-V, VMware vSphere 5.x and native file services for Windows (CIFS) and UNIX environments ( NFS) be certified. Furthermore, the system is storing (iSCSI, FC) and the Dedupe can provide block-level. The migration of data from existing storage system NetApp FAS3020 (acquisition of projects, applications, project data, and Exchange storage groups) must be made on the fly and be completed within one working week. Important is a unified management of the entire storage infrastructure. A separation between back-end (RAID array) and front-end (NAS / SAN gateway) in management is not desired. It must all aspects (NAS and SAN) incl. Backup through a single management interface can be managed at the remote site. The reliability of the overall system is to be ensured by the operating system as clusters in two fire zones, where the cluster members synchronously mirror / replicate. In addition to supplying the storage system installation, commissioning, migration, training and a four year maintenance contract to be tendered.

Studies in aquatic Biotest with the nematode Caenorhabditis elegans for the review of ecotoxicity and bioaccumulation of environmental samples and chemicals

Bundesanstalt für Gewässerkunde | Published September 19, 2016  -  Deadline October 5, 2016
cpvs
09473483

Studies in aquatic Biotest with the nematode Caenorhabditis elegans for the review of ecotoxicity and bioaccumulation of environmental samples and chemicals

State Department of Environmental Conservation Saxony-Anhalt, FB 4 Conservation, FG 43 species and habitat conservation, StVSW and control tasks of conservation / CITES Reideburger Str. 47 06116 Halle / Saale

Sachsen-Anhalt Landesamt für Umweltschutz | Published April 16, 2015  -  Deadline April 23, 2015
cpvs

Landesamt für Umweltschutz Sachsen-Anhalt, FB 4 Naturschutz, FG 43 Arten- und Biotopschutz, StVSW und Kontrollaufgaben des Artenschutzes/CITES Reideburger Str. 47 06116 Halle/Saale

Grants FKZ 3714 62 200 8 - main phase of the 5th Environmental Survey (5.US) TV 8 "HBM-based analysis-II determination of pollutants in the morning urine of children and adolescents in Germany"

Um­welt­bun­des­amt, Re­fe­rat Z6 | Published December 15, 2014  -  Deadline February 10, 2015
cpvs

Environmental Survey (5.US) TV 8 "HBM-based analysis-II determination of pollutants in the morning urine of children and adolescents in Germany" The German environmental study on the health of children and adolescents, Geres 2014-2017 is in the same test subjects instead, the collected on Child and Adolescent Health Survey of the Robert Koch Institute (KiGGS) 2505 Children and adolescents aged 3 to 17 years old in nationwide total of 167 sentinel surveillance sites The field work is expected to begin in January 2015 and will take about Here are the morning urine samples , aliqoutiert and with the first sample is from the early / mid March 2015 is expected. In this project, the first morning urine samples of the participating children and adolescents to the following substances to be analyzed: creatinine, cotinine, metabolites of polycyclic hydrocarbons (PAHs) including naphthols; and PAHs and 2-MBT are provided only in a For substances that determined in all samples 19 analysis cycles, the subsamples are present quality assured in 100 The results should hold 8 weeks after sample delivery to a Contractor made a first interim report and a final report in a print version, which is the description of the performed analysis and further interim reports in the form of process and survey data tables electronically regularly to the quality and validity of the results is detailed position information is included in the specification. The duration of the project is 34 months. For service provision and a consortium grouping or equivalent may be formed with a responsible project management. For more information on the environmental study are available online at http://www.umweltbundesamt.de/themen/gesundheit/belastung-desmenschen-

Preparation of an environmental report for the Mecklenburg Lake District as part of the update part of the Regional Spatial Development program in the program Theorem 6.5 (5) "suitable areas for wind turbines"

Regionaler Planungsverband Mecklenburgische Seenplatte | Published October 17, 2014  -  Deadline January 31, 2014
cpvs

Erarbeitung eines Umweltberichtes für die Region Mecklenburgische Seenplatte im Rahmen der Teilfortschreibung des Regionalen Raumentwicklungsprogrammes im Programmsatz 6.5(5) "Eignungsgebiete für Windenergieanlagen"

Grants FKZ 3714 62 200 7 - main phase of the 5th Environmental Survey (5.US) TV 7 "HBM-based analysis-I determination of pollutants in the morning urine of children and adolescents in Germany"

Um­welt­bun­des­amt, Re­fe­rat Z6 | Published November 27, 2014  -  Deadline January 31, 2015
cpvs

Environmental Survey (5.US) TV 7 "HBM-based analysis-I determination of pollutants in the morning urine of children and adolescents in Germany", a consortium or grouping with a responsible project management can be formed to service delivery. For more information on the environmental study on the Internet at

Staatliches Baumanagement Braunschweig, Restoration of half-timbered façade - ...

Staatliches Baumanagement Braunschweig | Published May 24, 2016  -  Deadline June 6, 2016
cpvs

HERE: Notice of Participation Contest The tender should follow the same selection of tenderers and after. The tender documents will be provided to the selected bidders exclusively on the award platform http://vergabe.niedersachsen.de available; it is then a separate information. We recommend irrespective of register is already on the platform. planned deadlines: - receipt of applications up 06/06/2016 - selection of tenderers and provision of tender documents to expected 03.08.2016 - the deadline for the request or access the tender documents until approximately 17/08/2016 - opening / closure date (Submission) Expected 18.08.2016 Please fill proving your qualifications the form 124 or tell us your Präqualifikationsnummer (PQ-club) and send it by mail to: vergabe@sb-bs.niedersachsen.de or by fax to: 0531 / 1211-199. Scope: 3 Stk 4-liquid environments dev.. Softwood window, as well as covers of cornices with zinc sheets see specifications texts on Vergabeplattform

Public participation in competition for expressions of interest in advance of the direct award of services for the preparation and implementation of the Strategic Environmental Assessment and Habitats examination and the preparation of the environmental report to update the country's space development program Mecklenburg-Vorpommern in accordance with VOL / A

Ministerium für Energie, Infrastruktur und Landesentwicklung | Published January 19, 2015  -  Deadline May 30, 2014
cpvs

On the basis of the State Planning Act (LPLG) - in the version published on 5 May 1998, as last amended on several occasions by Article 3 of the Law of 20 May 2011 (GVOBl MV p.323.) - Is the country's space development program Mecklenburg-Western Pomerania from 2005 updated. The update process should be completed by the end of 2015 / beginning of 2016.. As part of the update are in accordance with §§ 4, 5 and 7 LPLG -. A Strategic Environmental Assessment and - perform an examination and Habitats - an environmental report and - considering proposals to create eigehenden comments. In addition to this in the investment process design of the country area development program may be included in the test by decision of the contracting principle also important information during the participation process. As part of the investment process statements are available online, delivered by e-mail, in writing or on record. All opinions expressed are entered into a trade database. With this database is to work in collaboration with the DVZ GmbH in Schwerin. By the contractor's environmental review and the Habitats Verträglichkeitsprü¬fung are carried out and documented to develop proposals consideration in connection with the participation process and create a publishable environmental report in design.

Federal Environmental Agency Project 72297 - procurement process: lysimeter Electronic load cells as a replacement for mechanical scale

Umweltbundesamt, Referat Z6 | Published August 30, 2016  -  Deadline September 22, 2016
cpvs

project 72297

Ex-Ante: environmental assessment for the project "Creation of the patency of the barrage Waldensian lake"

Kreis Soest, Zentrale Vergabestelle | Published September 6, 2016
cpvs

Ex-Ante: environmental assessment for the project "Creation of the patency of the barrage Waldensian lake"

Options for developing the network fee system for a safe, environmentally sound and cost-effective energy transition

Bundesministerium für Wirtschaft und Energie - Zentrale Vergabestellen IC4 und ZA3 | Published July 7, 2016  -  Deadline August 8, 2016
cpvs
73000000, 73000000

see attached specifications

Replacement of the two small lock chambers in Holtenau environmental impact study, landscape conservation plan and expert opinions

Wasser- und Schifffahrtsamt Kiel-Holtenau | Published August 3, 2016  -  Deadline September 20, 2016
cpvs
71313000, 71313440, 71313000, 71313440

Replacement of the two small lock chambers in Holtenau environmental impact study, landscape conservation plan and expert opinions

Framework agreement on the elimination of transport and environmentally hazardous contaminants on and off public roads

Vergabemarktplatz Brandenburg | Published August 28, 2015  -  Deadline September 18, 2015
cpvs

Rahmenvertrag über die Beseitigung von verkehrs- und umweltgefährdenden Verunreinigungen auf und neben öffentlichen Verkehrsflächen

Preparation of the master plan climate-friendly mobility of Herne incl. Noise mapping and noise action plan in accordance with EU Environmental Noise Directive.

Stadt Herne-FB Personal und Zentraler Service (12)- Submissionsstelle | Published December 16, 2014  -  Deadline January 19, 2015
cpvs
71300000, 90712100, 90742000

Erstellung des Masterplans klimafreundliche Mobilität der Stadt Herne inkl. Lärmkartierung und Lärmaktionsplanung gemäß EU-Umgebungslärmrichtlinie.

Implementation of the Environmental Noise Directive and the clean air plan Ruhr 2011 R1 - Mobility Management / determination of the modal split in Gelsenkirchen

Stadt Gelsenkirchen - 63/4.1 Zentrale Vergabestelle | Published October 24, 2014  -  Deadline November 18, 2014
cpvs

The survey is intended to ensure that in future there is a current data base for transport planning the city. There are yet no comparative data for Gelsenkirchen. The investigation should result provide a solid data basis for transport planning and the development of concepts in the context of climate change. The award serves to implement the measures - R1 - mobility management as a contribution to air pollution, - GE. 17 - Project "efficient mobile" - GE. 15 - Implementation of the climate protection concept of the clean air plan Ruhr 2011 - part plan Ruhr area - North, because over the measure to be charged an evaluation is possible.