Call +44 800 9755 164

Public tenders for environment in Munich Germany

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Miscellaneous special-purpose machinery

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e.V. über Vergabeportal deutsche eVergabe | Published March 28, 2017
cpvs
42990000

DUV-Exposure tool for 200mm Si-Wafers (notch acc. to SEMI) — Technology node: down to 150nm — to be clustered with a wafertrack (i.e. TEL ACT8 or similar) — capability of front-to-backside-alignment — including all components (i.e. Laser, Chiller, etc.) to operate the system — to be installed in a class 10 environment — Laser to be installed on the same floor, directly behind the tool, — Scanner or stepper, but stepper preferred — tool status can be new or refurbished.

— DUV-Exposure tool for 200mm Si-Wafers (notch acc. to SEMI) — Technology node: down to 150nm — to be clustered with a wafertrack (i.e. TEL ACT8 or similar) — capability of front-to-backside-alignment — including all components (i.e. Laser, Chiller, etc.) to operate the system — to be installed in a class 10 environment — Laser to be installed on the same floor, directly behind the tool, — Scanner or stepper, but stepper preferred — tool status can be new or refurbished.

Machines and apparatus for testing and measuring

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. über Vergabeportal eVergabe | Published March 29, 2017
cpvs
38540000

Fraunhofer IZM want to procure an operating and development environment for hetero-highest integrated power electronics. The following features will provide the facility: - operating environment for highly integrated power electronics. - switching loss measurement of fast switching semiconductors - Thermal Design Power of inductive components at high frequencies. The plant is in consideration of personal protection for the three tasks that provide the necessary materials electrical sources and sinks, metrology and environmental characteristics to operate the power electronics under defined conditions and be able to measure. fast communication, experience in the field of power electronics, in particular the start-up of highly integrated power electronic circuits, switching loss measurement and colorimetric measurement is expected by the contractor.

Variable message signs

Autobahndirektion Südbayern | Published April 14, 2017  -  Deadline May 18, 2017
cpvs
34924000, 32572000, 50230000

A 99 beltway Munich

8-lane expansion AK München-Nord until exit Aschheim / Ismaning

Adaptation of the traffic control system

Gantries, cantilever arms, masts, side pillars, variable message signs, exchange traffic control board, Prismsigns, variable routing cross-section, video cameras, video system, roadside station, power distribution, power distribution with transformer, traffic data and environment data collection, data and power cables.

Miscellaneous special-purpose machinery

Fraunhofer Gesellschaft zur Förderung der angewandten Forschung e. V. über Vergabeportal eVergabe | Published April 5, 2017
cpvs
42990000

SC6-4U complete system high-end FPGA cluster and FPGA PC plug-in modules.

Strategy of the Fraunhofer IIS / EAS is to supplement including the high-end vision SoC with an energy-optimized, yet extremely powerful integrated in the package Compute platform. In particular, in neuronal process (training and recall) in the real-time operating completely new fields of application, such as. For example, in the scene analysis and recognition in the natural environment, or the control of production processes will become apparent by the parallelization of algorithms. These tasks can be modeled in a highly parallel FPGA-based hardware in real time. The tested and optimized systems in a next step to a real chip hardware be ported (<22 n FDX) and integrated together with image sensors or VSoCs in a 3D package. The modeling requires a high-end FPGA cluster, which can image different complex system in several stages.

In addition to the high-end FPGA cluster FPGA PC plug-in modules are still needed, as they can be installed physically in a PC at work / lab space and different interfaces are available locally. Local "Hight-speed / low-latency" -Schnitstellen enable low-latency connectivity from real sensors or actuators to highly parallel components comprising the high-end vision SoC model.

Works for complete or part construction and civil engineering work

GWG Städtische Wohnungsgesellschaft München mbH | Published April 8, 2017  -  Deadline May 8, 2017
cpvs
45200000

With Ramersdorf first component, the rehabilitation of the GWG settlement south of the Bad-Schachener Street begins. The planned building project is located at the western end of the settlement and forms the Vorläuferbau for subsequent Sanierungsschritte.Die existing building on Bath Street Schachener 44-66 in Ramersdorf belong typologically to the buildings north of Bad-Schachener-Str former Maikäfer settlement. and the remaining Haldenseesiedlung south of Bad-Schachener-Str. and originated in the late 1940s.

In the treated here construction projects is the first step in the Haldenseesiedlung south of Bad-Schachener Street.

The environment of the residential complex is determined by the northern road area of ​​the four-lane bathroom Schachener Street and opposite the new building here GWG Munich erdgeschossigem supermarket and pharmacy and overlying apartments. The southern area of ​​the property is dominated by older, loose single-family houses. In the new building 38 supported by EOF units with a total of 2 492 sqm (average of 65.47 m² Wfl./WE) are planned, further 53 freely financed micro flats for singles, possible trainees or urban workers, with an average size of 28.36 m² and a total area of ​​1503 m². The ground floor also to the new Property Management GWG Munich, responsible for the municipalities of Berg am Laim and Ramersdorf arise with about 721 m² of floor space. Temporarily housed in an adjacent existing building doctor's office to get new practice rooms with 130 m² of floor space on the first floor of the privately financed residential part.

Architectural, engineering and planning services

Deutsches Museum von Meisterwerken der Naturwissenschaft und Technik (AdöR) | Published March 31, 2017  -  Deadline April 27, 2017
cpvs
71240000

The German museum has around 66,000 m² of exhibition space, the exhibition building will be modernized during museum operating until probably 2025 comprehensive technical.

For the redesign within the general restoration of all the exhibits in the realization of part 1, the basic performance corresponding to the power image of the fees for architects (HOAI 2013) are part 3 project planning section 1, § 34 are assigned for the indoor environment in connection with conditioning 10th

The contract includes:

Power Phase 6 - Preparation of tender (power level 3);

Power Phase 7 - participation in the allocation (power level 3);

Power Phase 8 object monitoring / supervision and documentation (power level 4);

Power Phase 9 Property Services (power level 5);

Subject of this notice is the renewal of the exhibitions in the subproject exhibitions.

Subject of this notice

Floor and mezzanine of the Southern connecting building. "

2721 m².

It is also intended to entrust the previous exhibition designer with the artistic catenary.

The project is included in the opinion of the AG in fee zone IV.

Scope VII 10.2)

Scope of interiors:

- Start LPH 6 immediately from commissioning - no later than 08/2017 (performance level 3);

- beginning from LPH 7 11/2017 (power level 3);

- beginning from LPH 8 08/2018 (power level 4);

- beginning from LPH 9 09/2019 (power level 5);

Frame Dates Project Construction:

- Begin shell 03/2017;

- completion of expansion 08/2018 (surface handover to Project exhibitions);

- End of raw materials and fine installation of the TGA trades f the sub-project exhibitions 03/2019;.

Frame Dates Project Exhibitions:

- Start Ausstellungsbau 08/2018;

- completion Ausstellungsbau to 04/2019;

- Start / End Object facility (exhibits and demonstrations) 12/2018 - 09/2019;

- Use recording 10/2019;

- the expiry of the warranty period 09/2023;

Individual areas of the exhibitions at the realization Part 3:

1167 m²;

297 m²;

270 m²;

987 m².

From the total cost of operation (3497 652.00 EUR net) attributable to DIN 276 expected following partial costs to the respective cost group:

KG 300 likely 1030 884.00 EUR net;

KG 400 expected 416 973.00 EUR net;

KG 600 likely 2049 795.00 EUR net.

Showcase lighting, etc.) and in the scope of project planning exhibition building are planned.

The scope of the LPH 6-9600 exhibition-related planning services to the graphic production are taken into account with cost group.

See all the information in the enclosed facility, project and task description.

Architectural, engineering and planning services

Deutsches Museum von Meisterwerken der Naturwissenschaft und Technik (AdöR) | Published March 31, 2017  -  Deadline April 26, 2017
cpvs
71240000

The German museum has around 66,000 m² of exhibition space, the exhibition building will be modernized during museum operating until probably 2025 comprehensive technical.

For the redesign within the general restoration of all the exhibits in the realization of part 1, the basic performance corresponding to the power image of the fees for architects (HOAI 2013) are part 3 project planning section 1, § 34 are assigned for the indoor environment in connection with conditioning 10th

The contract includes:

Power Phase 6 - Preparation of tender (power level 3);

Power Phase 7 - participation in the allocation (power level 3);

Power Phase 8 object monitoring / supervision and documentation (power level 4);

Power Phase 9 Property Services (power level 5);

Subject of this notice is the renewal of the exhibitions in the subproject exhibitions.

Upstairs in South and West Wing ".

4040 m².

It is also intended to entrust the previous exhibition designer with the artistic catenary.

The project is included in the opinion of the AG in fee zone IV.

Scope VII 10.2)

Scope of interiors:

- Start LPH 6 immediately from commissioning - no later than 08/2017 (performance level 3);

- beginning from LPH 7 11/2017 (power level 3);

- beginning from LPH 8 08/2018 (power level 4);

- beginning from LPH 9 09/2019 (power level 5);

Frame Dates Project Construction:

- Begin shell 03/2017;

- completion of expansion 08/2018 (surface handover to Project exhibitions);

-. F end raw and fine install the TGA trades the subproject exhibitions 03/2019.

Frame Dates Project Exhibitions:

- Start Ausstellungsbau 08/2018;

- completion Ausstellungsbau to 04/2019;

- Start / End Object facility (exhibits and demonstrations) 12/2018 - 09/2019;

- Use recording 10/2019;

- expiry of the warranty period 09/2023.

Individual areas of the exhibitions at the realization Part 1:

800 m²;

980 m²;

190 m²;

560 m²;

500 m²;

1010 m².

From the total cost of operation (4051 113.00 EUR net) attributable to DIN 276 expected following partial costs to the respective cost group:

KG 300 expected 750 141.00 EUR net;

KG 400 expected 403 026.00 EUR net;

KG 600 likely 2897 946.00 EUR net.

Showcase lighting, etc.) and in the scope of project planning exhibition building are planned.

The scope of the LPH 6-9600 exhibition-related planning services to the graphic production are taken into account with cost group.

See all the information in the enclosed facility, project and task description.

  • 1