Call +44 800 9755 164

Public tenders for environment in Strakonice Czech Republic

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Construction of sewerage and sewage treatment plant in the village Sousedovice

Obec Sousedovice | Published March 5, 2015  -  Deadline September 30, 2016
cpvs
45232400

Construction of a central point of wastewater treatment in the community (WWTP) together with the construction of catchment stem sewers. Reason effectiveness of public contracts pursuant to § 86 par. 2 of the Public Procurement Act: There is no way centralized wastewater treatment, the existing catchment drains into the river outfall is Smiradického stream. There is a considerable burden on the environment, especially the interest outfall sewers in the stream. It is necessary to build tribal sewer, connect the existing sewerage connections, build a wastewater treatment plant with a comprehensive wastewater treatment.

Sewer Řepice - connection to the wastewater treatment plant Strakonice

Obec Řepice | Published July 2, 2015  -  Deadline November 30, 2015
cpvs
45232400

construction of sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 m, 90 * PE 8.2 is 116 m justification effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts achieved: The project aims to build a sewer system that will divert sewage Water Treatment Works Strakonice. Sewer will be connected to the existing sewer system, which is currently at the mouth of the few places open to the terrain Individual outlets are connected via overflows into drains and sewage water discharged into the sewage treatment plant in Strakonice. b) a description of the subject of public contract to build sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 meters, PE 90 * 8,2 116 mc) a description of the relationship between the subject contract and the client's needs: Without implementation of the procurement procedure can not achieve the expected goals of the contracting entity's objective of building a sewer system that will drain gray water treatment plant Strakonice. The project will have a positive impact on the environment. The tender procedure will be chosen by the contractor with the lowest bid price, while maintaining the required quality and work parameters according to project documentation and inventory of works, supplies and services. d) the envisaged deadline for fulfilling the public contract completion by 30. 11. 2015

Sewer Řepice - connection to the WWTP Řepice

Obec Řepice | Published June 2, 2015  -  Deadline November 30, 2015
cpvs
45232400

construction of sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 m, 90 * PE 8.2 is 116 m justification effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts achieved: The project aims to build a sewer system that will divert sewage Water Treatment Works Strakonice. Sewer will be connected to the existing sewer system, which is currently at the mouth of the few places open to the terrain Individual outlets are connected via overflows into drains and sewage water discharged into the sewage treatment plant in Strakonice. b) a description of the subject of public contract to build sewerage (DN 300 - gravitational part and PE 90 - pressure drainage), 43 manholes, overflows, pumping; total length of the proposed new sewerage DN 300 is 1643.5 meters, PE 90 * 8,2 116 mc) a description of the relationship between the subject contract and the client's needs: Without implementation of the procurement procedure can not achieve the expected goals of the contracting entity's objective of building a sewer system that will drain gray water treatment plant Strakonice. The project will have a positive impact on the environment. The tender procedure will be chosen by the contractor with the lowest bid price, while maintaining the required quality and work parameters according to project documentation and inventory of works, supplies and services. d) the envisaged deadline for fulfilling the public contract completion by 30. 11. 2015
  • 1