Call +44 800 9755 164

Public tenders for environment in Rychnov-nad-kneznou Czech Republic

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!
EnvironmentCzech Republicrychnov-nad-kneznou

Upgrading existing environment arrays

Krajská zdravotní, a.s. | Published August 29, 2016
cpvs
32424000

In an environment of two consolidated data centers, we demand solutions for storing block data into two arrays located at two locations to ensure maximum data security and provide high availability of services. The investor's intention is to complement the existing disk capacity data storage, thus ensuring data storage and systems, which are crucial to the running of the company. Implementation of public procurement will be one hundred percent the intent of the contracting authority.

Upgrading existing environment arrays

Krajská zdravotní, a.s. | Published December 23, 2016
cpvs
32424000

Upgrade existing environment arrays

Krajská zdravotní, a.s. | Published April 24, 2017
Winner
C SYSTEM CZ a.s.
cpvs
32424000

Comprehensive landscaping Potštejn

Česká republika-Státní pozemkový úřad, Krajský pozemkový úřad pro Královéhradecký kraj, Pobočka Rychnov nad Kněžnou | Published February 26, 2015
cpvs
71250000

This area is concerned unfinished assignment procedure. Reason effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts fulfilled: a draft comprehensive land is in the public interest spatially and functionally structure the land, consolidate or split them and ensures accessibility and utilization of land and settlement of their boundaries by to create conditions for improving the quality of life, diversification of economic activity and improving the competitiveness of agriculture, improving the environment, protecting and reclaiming land resources, water management, particularly in the field of landscape runoff regime and increase the ecological stability of the landscape, resolving inconsistencies actual state in the landscape map, solve the unclear status of registration of real estate in the area affected by incomplete assignment procedure. 139/2002 Coll., As amended, including demarcation of land ownership boundaries and necessary geodetic work in quality class 3 points for renewal cadastre - a new map DKM

Comprehensive landscaping Hláska

Česká republika-Státní pozemkový úřad, Krajský pozemkový úřad pro Královéhradecký kraj, Pobočka Rychnov nad Kněnou | Published February 26, 2015
cpvs
71250000

This area is concerned unfinished assignment procedure. Reason effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts fulfilled: a draft comprehensive land is in the public interest spatially and functionally structure the land, consolidate or split them and ensures accessibility and utilization of land and settlement of their boundaries by to create conditions for improving the quality of life, diversification of economic activity and improving the competitiveness of agriculture, improving the environment, protecting and reclaiming land resources, water management, particularly in the field of landscape runoff regime and increase the ecological stability of the landscape, resolving inconsistencies actual state in the landscape map, solve the unclear status of registration of real estate in the area affected by incomplete assignment procedure. 139/2002 Coll., As amended, including demarcation of land ownership boundaries and necessary geodetic work in quality class 3 points for renewal cadastre - a new map DKM

Comprehensive landscaping Rájec and simple landscaping Lhota u Potštejna

Česká republika-Státní pozemkový úřad, Krajský pozemkový úřad pro Královéhradecký kraj, Pobočka Rychnov nad Kněžnou | Published February 26, 2015
cpvs
71250000

The contract will be awarded as a single entity to one contractor, not the contract is divided into sections. Reason effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts fulfilled: a land consolidation is in the public interest spatially and functionally structure the land, consolidate or split them and ensures accessibility and utilization of land and settlement of their boundaries so that to create the conditions for improving the quality of life, diversification of economic activity and improving the competitiveness of agriculture, improving the environment, protecting and reclaiming land resources, water management, particularly in the field of landscape runoff regime and increase the ecological stability of the landscape, resolving inconsistencies in the actual state of the landscape map , resolving ambiguous state registration of real estate in the area affected by incomplete assignment procedure. 139/2002 Coll., As amended, including demarcation of land ownership boundaries and necessary geodetic work in quality class 3 points for renewal cadastre - a new map DKM

Warmth colleges and secondary schools, Rychnov nad Kněžnou, U Stadionu 1166 (U resort stadium, cube)

Vyšší odborná škola a Střední průmyslová škola, Rychnov nad Kněžnou, U Stadionu 1166 | Published March 13, 2015
cpvs

The subject of the tender is the selection of a building contractor and publicity for the project co-financed by the Structural Funds through the Operational Programme Environment. The basis for the completion of the works will be construction of project documentation for construction. To build was granted planning permission and consent for the construction notification. The project involves the replacement of windows and doors and insulation of the building with three floors, a basement and a flat roof. It is an extension of the classroom 1982 Higher Vocational School and Secondary School in Rychnov. The ground plan is a square with sides of 16 m. This extension has no separate number, accessible from the street Masaryk and is located on plot no. 799/3 parcel. The project consists in the insulation of exterior walls from ground level contact system with gray EPS in thickness. 160 mm. The replacement MIV and light stair wall lining of aerated concrete blocks in thickness. 200 mm and subsequent insulation contact system with gray EPS in thickness. 160 mm. Then the roof insulation, thermal insulator in thickness. 240 mm, sealed air cavities. The project includes the replacement of all windows incl. basement and stairs with new plastic on the overall heat transfer coefficient Uw = 1.0 W / (m2K). Replace entry doors for new construction (plastic, aluminum) on the overall heat transfer coefficient of the whole door Uw = 1.2 W / (m2K). The contract will also ensure publicity in accordance with the requirements of the grantor.

Warmth colleges and secondary schools, Rychnov nad Kněžnou, U Stadionu 1166 (U resort stadium, cube)

Vyšší odborná škola a Střední průmyslová škola, Rychnov nad Kněžnou, U Stadionu 1166 | Published November 11, 2014
cpvs

The subject of the tender is the selection of a building contractor and publicity for the project co-financed by the Structural Funds through the Operational Programme Environment. The basis for the completion of the works will be construction of project documentation for construction. To build was granted planning permission and consent for the construction notification. The project involves the replacement of windows and doors and insulation of the building with three floors, a basement and a flat roof. It is an extension of the classroom 1982 Higher Vocational School and Secondary School in Rychnov. The ground plan is a square with sides of 16 m. This extension has no separate number, accessible from the street Masaryk and is located on plot no. 799/3 parcel. The project consists in the insulation of exterior walls from ground level contact system with gray EPS in thickness. 160 mm. The replacement MIV and light stair wall lining of aerated concrete blocks in thickness. 200 mm and subsequent insulation contact system with gray EPS in thickness. 160 mm. Then the roof insulation, thermal insulator in thickness. 240 mm, sealed air cavities. The project includes the replacement of all windows incl. basement and stairs with new plastic on the overall heat transfer coefficient Uw = 1.0 W / (m2K). Replace entry doors for new construction (plastic, aluminum) on the overall heat transfer coefficient of the whole door Uw = 1.2 W / (m2K). The contract will also ensure publicity in accordance with the requirements of the grantor.

Construction work for water and sewer main road in Lipovka

Město Rychnov nad Kněžnou | Published March 6, 2015
cpvs

The object of the project is building water supply and sewage treatment in the local area Lipovka u Rychnova over Princess (District Rychnov nad Kněžnou) in the cadastral This is the 684,724th structural modifications to the existing sewerage system, which is conducted under the road III / 3212th Construction work on the sewer system will be carried out due to failures, collapse, roots grow through to the existing sewer pipe, which is currently made of concrete pipes and is in desperate stavu.Vodovodní order PE 100 RC De SDR 11 160 x 9.5 mm (length 627 m) m is connected to the existing water lines LT DN 150 mm in the village Lipovka. On the water mains are equipped with a total of 4 hydrants, two floors and two underground. Pipes will be replaced in the current route mains. Reason Public procurement: a) the needs of cities Rychnov nad Kněžnou is part of the local sewerage Lipovka connected to the wastewater treatment plant, while laying new water mains. Thanks to the building will undergo further development of the city, because the extension of new buildings and industrial zones is dependent on the realization of the planned project. b) The subject of procurement are works comprising the construction of sewerage system and laying new water mains in the city Rychnova nad Kněžnou room no Lipovka. Reconstructions sections of sewer pipes are made of cast iron because of the low saving sewers beneath the ground. On average, a depth of 1.0 m. Sanitation will be adjusted from TLT DN 150, 200, 300, 400 mm. All routes of existing sewers of BET, which leads under the road, will be replaced with piping of TLT in the corresponding dimensions. The total length of construction work on the sewer system is about 1302.5 mA proposed water supply of about 627.0 m. C) successfully implemented public contract is a prerequisite to achieve the planned objectives, which will improve the life of people in the area and designed to improve the environment as such. d) Estimated deadline: April 15, 2015 - May 15, 2016. Scope of the project will be implemented in two stages.

Construction work for water and sewer main road in Lipovka

Město Rychnov nad Kněžnou | Published January 28, 2015  -  Deadline April 30, 2016
cpvs
45231300

The object of the project is building water supply and sewage treatment in the local area Lipovka u Rychnova over Princess (District Rychnov nad Kněžnou) in the cadastral This is the 684,724th structural modifications to the existing sewerage system, which is conducted under the road III / 3212th Construction work on the sewer system will be carried out due to failures, collapse, roots grow through to the existing sewer pipe, which is currently made of concrete pipes and is in desperate stavu.Vodovodní order PE 100 RC De SDR 11 160 x 9.5 mm (length 627 m) m is connected to the existing water lines LT DN 150 mm in the village Lipovka. On the water mains are equipped with a total of 4 hydrants, two floors and two underground. Pipes will be replaced in the current route mains. Reason Public procurement: a) the needs of cities Rychnov nad Kněžnou is part of the local sewerage Lipovka connected to the wastewater treatment plant, while laying new water mains. Thanks to the building will undergo further development of the city, because the extension of new buildings and industrial zones is dependent on the realization of the planned project. b) The subject of procurement are works comprising the construction of sewerage system and laying new water mains in the city Rychnova nad Kněžnou room no Lipovka. Reconstructions sections of sewer pipes are made of cast iron because of the low saving sewers beneath the ground. On average, a depth of 1.0 m. Sanitation will be adjusted from TLT DN 150, 200, 300, 400 mm. All routes of existing sewers of BET, which leads under the road, will be replaced with piping of TLT in the corresponding dimensions. The total length of construction work on the sewer system is about 1302.5 mA proposed water supply of about 627.0 m. C) successfully implemented public contract is a prerequisite to achieve the planned objectives, which will improve the life of people in the area and designed to improve the environment as such. d) Estimated deadline: April 1, 2015 - April 30, 2016. Scope of the project will be implemented in two stages.

Consolidation of ICT resources MěÚ Enduring Freedom

Město Náměšť nad Oslavou | Published February 3, 2015
cpvs

Application virtualization technology and hardware to clients, implementation of DMS into the environment IS MěÚ Enduring Freedom Supply of equipment the server Municipal Authority Enduring Freedom, including the supply of terminal stations and associated software, which will consist of the following items: - server virtualization applications incl. licenses virtualization environment 2 pc - storage system, compatible with the existing architecture of nodes 2 - SW environment for application virtualization incl. licenses and hardware thin clients 40 pieces - office suite in the license for the operation of virtualized applications Commissioning and setup in a network environment MěÚ Enduring Freedom, setting application software for use on thin clients, training administrators DMS Implementation incl. installation, implementation into the IS, operating authority, migration of existing data and necessary training administrator tender dossier is available to suppliers in full on the contracting entity profile.

Videokolonoskopická assembly

Orlickoústecká nemocnice,a.s. | Published October 14, 2014
cpvs
33168000

Implementation of two server centers with virtualized server environment (primary and secondary) with data storage.

Delivery of computer sets and IT equipment in the DNS - 2016/0018

Univerzita Jana Evangelisty Purkyně v Ústí nad Labem | Published March 30, 2016
cpvs

Procured a dynamic purchasing system is the supply of mobile devices, external data storage and notebook, including a docking station for the Faculty of Environment UJEP.

Delivery of computer sets and IT equipment in the DNS - 2016/0018

Univerzita Jana Evangelisty Purkyně v Ústí nad Labem | Published May 24, 2016
cpvs

Procured a dynamic purchasing system is the supply of mobile devices, external data storage and notebook, including a docking station for the Faculty of Environment UJEP.

Servers

Univerzita Jana Evangelisty Purkyně v Ústí nad Labem | Published April 25, 2017
cpvs
48820000

Procured a dynamic purchasing system is delivered including a laptop docking station for the Faculty of Environment UJEP and docking station for Erasmus +.

Reconstruction of the building no. P. 515, ul. Environmental Rychnov nad Kněžnou - additional and new works

Město Rychnov nad Kněžnou | Published October 26, 2015
cpvs

This is an implementation of additional and new construction work within - the first stage: the caretaker's apartment, common areas and building modifications 3.NP

Consolidation of ICT Town Council Enduring Freedom

Město Náměšť nad Oslavou | Published November 18, 2014
cpvs
48820000

Application virtualization technology and hardware to clients, implementation of DMS into the environment IS MěÚ Enduring Freedom Supply of equipment the server Municipal Authority Enduring Freedom, including do-batch terminal stations and associated software, which will be six-vat of the following items: - server application virtualization incl. licenses virtualization environment 2 pc - storage system, compatible with the existing architecture of nodes 2 - SW environment for application virtualization incl. licenses and hardware thin clients 40 pieces - office suite in the license for the operation of virtualized applications Commissioning and setup in a network environment MěÚ Enduring Freedom, setting application software for use on thin clients, training administrators DMS Implementation incl. installation, implementation into the IS, operating authority, migration of existing data and necessary training administrator Justification effectiveness of public procurement: a) description needs to be the fulfillment of public contracts fulfilled: Another objective is to provide technologies for the computerization of internal agendas linked to the implementation of eGovernment. Implementation of the project will complement the existing virtualized infrastructure, acquired in a building with the city, and thereby to fulfill the vision of private cloud public services. b) Description of the procurement: HW for clients and implementation of DMS into the environment IS MěÚ Enduring Freedom. The Contracting Authority intends to implement the award of a public contract for the above performance due to the necessities of modernization of technical devices, incl. high level of security and streamline access and work with electronic documents c) Description of the relationship between the subject contract and the client's needs: CZ.1.06 / 2 Jan. 00 / 22.09443. Public order is in relation to the objectives of the project and granted by decision tool for achieving objectives and conditions subsidies. With regard to the surrender of the feasibility study is required to meet all of the publicly-order (otherwise there would be a reduction in subsidies unfulfilled indicators and sanction the performance of the MoI), as well as the Popi-diate solution set as a transparent setting is in line with Manual, methodological guidelines and the law. d) Expected date of fulfillment of public contracts:

Sylvatica center Jiřetín pod Bukovou

OBEC JIŘETÍN POD BUKOVOU | Published May 21, 2015
cpvs

The subject of the tender is the establishment of an environmental education center intended for young people or even adults in the learning environment and activities associated with maintaining sustainable development of the territory. They will be carried out construction work of the existing building No. 15 (stp.č. 7116), as well as paved areas will be made for access to the building and parking, utilities, landscaping and landscaping exterior surfaces.

Centrum sylvatica Jiřetín pod Bukovou

OBEC JIŘETÍN POD BUKOVOU | Published April 14, 2015
cpvs

The subject of the tender is the establishment of an environmental center designed to educate youth or even adults in the learning environment and activities associated with maintaining the sustainable development of the area. They made structural modifications of the existing building No. 15 (stp.č. 7116), as well as paved areas will be made for access to the building and parking, utilities, landscaping and landscaping external surfaces.

Consolidation of ICT resources MěÚ Enduring Freedom - Part 2

Město Náměšť nad Oslavou | Published April 3, 2015
cpvs

Implementation of DMS into the environment IS MěÚ Enduring Freedom. Suppliers are unfettered and direct remote access to the specification in full as of the date of publication of the notice of open procedure, on the contracting entity profile Cities Enduring Freedom https://www.vhodne-uverejneni.cz/profil/00289965