Public tenders for environment in Liberec Czech Republic

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Reconstruction of the road II / 286 Upper Mountains

Liberecký kraj | Published November 24, 2014
cpvs
45233140

286-031 will be reconstructed existing stone wall. description needs to be the fulfillment of public contracts fulfilled: 286-031 and supplement safety restraint system. The project will also have a positive impact on the environment in the area, because its realization will reduce noise pollution around. b) a description of the subject contract: 286-031 will be reconstructed existing stone wall. c) a description of the relationship between the subject contract and the client's needs: The project will also have a positive impact on the environment, because its implementation will contribute to the reduction of noise and dust emissions in the immediate vicinity. d) the anticipated date of fulfillment of public contract within 180 days of signing the contract

Selected electronic services Statutory City of Liberec and his organization - DP

statutární město Liberec | Published October 22, 2015
cpvs

The subject of the tender is fully functional and satisfying the needs of the contracting authority software tool (software) for transportation planning. Part of a public contract, to supply all the other hardware (HW) and software (SW) for smooth and seamless operation of the offered solutions to transport planning (including the operating system). An integral part of public procurement is the implementation of the proposed solution to the client environment.

Revitalization Rochlice - surfacing Dobiášova - section Vratislavice - Krejčího

statutární město Liberec | Published September 22, 2015
cpvs

The project "Revitalization Rochlice - surfacing Dobiášova - section Vratislavice-Tailor" is part of the projects implemented under the Integrated Plan of the city of Liberec - Regeneration settlement Rochlice. Funds for project implementation are provided, inter alia, the conditions IOP Area of ​​Intervention 5.2 Improving the environment in problematic housing estates (available on http://www.strukturalni-fondy.cz/iop/5-2).2

Revitalization Rochlice - surfacing Dobiášova - stretch Vratislavice - Krejčího

statutární město Liberec | Published July 3, 2015
cpvs

The project "Revitalization Rochlice - surfacing Dobiášova - Tailor-section Vratislavice" is part of the projects implemented under the Integrated Plan of the city of Liberec - Regeneration settlement Rochlice. Funds for project implementation are provided, inter alia, the conditions IOP Area of ​​Intervention 5.2 Improving the environment in problematic housing estates (available on http://www.strukturalni-fondy.cz/iop/5-2).2

"Reconstruction of the road III / 28116 Borek-Troskovice"

Liberecký kraj | Published November 6, 2014
cpvs
45233140

The new bridge is designed as a reinforced concrete frame shaped like an inverted "U" and areal establishment. a) a description needs to be the fulfillment of public contracts fulfilled: The reconstructed road is the main access roads to the state of Trosky Castle and adjacent communities. The aim of the building is a reconstruction of the road this road, which has greatly disturbed bitumen due to their fatigue (are dead). The project will also have a positive impact on the environment in the area, because its realization will reduce noise pollution around. b) a description of the subject contract: The new bridge is designed as a reinforced concrete frame shaped like an inverted "U" and areal establishment. c) a description of the relationship of the public contract and the client's needs: Implementation of the work, ie. road reconstruction class III / 28116 will extend the life of roads, improving driving comfort and transport services in the area and strengthen the availability of downstream transportation axis. Reconstruction and expansion of communication will have a positive impact on increasing the safety and flow of traffic in this area and will also have a positive impact on the environment, because reconstruction will also help to reduce noise and dust emissions in the immediate vicinity. d) the expected due date for procurement construction period of 6 MONTHS

Road II / 290 Roprachtice

Liberecký kraj | Published March 11, 2016
cpvs
45233140

The building includes a large-scale repair roads II. Class 290 Roprachtice. It will be carried out road markings. a) the description needs to be the fulfillment of public contracts fulfilled Fulfilling public contracts will put the road II / 290 to a functional state. b) a description of the subject contract will be carried out road markings. c) a description of the relationship between the subject contract and the client's needs project will also have a positive impact on the environment, because its implementation will contribute to the reduction of noise and dust emissions in the immediate vicinity. d) the anticipated date of the fulfillment of public contracts Construction period: 80 calendar days from delivery and collection site

Complex Land in k. Ú. Andělka and parts k. Ú. Předlánce

Česká republika-Státní pozemkový úřad | Published February 11, 2016
cpvs

The intention is drafting comprehensive land consolidation in the cadastral Andělka and the cadastral territory Předlánce. Requests for initiation of proceedings of land consolidation brought the owners of 47% of agricultural land in k. Ú. Andělka. Estimated acreage perimeter landscaping is 939 hectares. Land-use planning in the public interest spatially and functionally organize the parcels, blended or divide and provide them access to and use of land and settlement boundaries so as to create conditions for rational management of landowners. At the same time the aim is to ensure conditions for improving the environment, water management and improve ecological stability of the landscape. Results landscaping will be used for the renewal of cadastral.

Comprehensive land consolidation in the cadastral Andělka and parts k.ú. Předlánce.

Česká republika – Státní pozemkový úřad | Published February 16, 2016
Winner
Ing. Helena Krausová
cpvs
71250000

The intention is drafting comprehensive land consolidation in the cadastral Andělka and the cadastral territory Předlánce. Requests for initiation of proceedings of land consolidation brought the owners of 47% of agricultural land in the cadastral Andělka. Estimated acreage perimeter landscaping is 939 ha. Land-use planning in the public interest spatially and functionally organize the parcels, blended or divide and provide them access to and use of land and settlement boundaries so as to create conditions for rational management of landowners. At the same time the aim is to ensure conditions for improving the environment, water management and improve ecological stability of the landscape. Results landscaping will be used for the renewal of cadastral.

Architectural, engineering and surveying services

Česká republika – Státní pozemkový úřad | Published October 10, 2015  -  Deadline November 30, 2015
cpvs
71250000

The intention is to elaborate the draft comprehensive land in cadastral Andělka and the cadastral territory Předlánce. Requests for initiation of proceedings of land consolidation owners filed 47% of agricultural land in the cadastral Andělka. Expected acreage perimeter landscaping is 939 ha. Land consolidation is in the public interest arrange themselves spatially and functionally properties, blended or divide and provide them access to and use of land and settlement boundaries in order to create the conditions for rational management of landowners. At the same time the aim is to ensure conditions for improving the environment, water management and improve the ecological stability of the landscape. Results landscaping will be used for renewal of cadastral.

Reconstruction of the road III / 26318 from I / 13 - Polevsko

Liberecký kraj | Published February 10, 2015
cpvs
45233140

Furthermore, there will be a new road markings and replaced or supplemented by existing vertical road signs. a) a description needs to be the fulfillment of public contracts fulfilled: Reconstructed section of the road III / 26318 passes largely extraviálnu, b) a description of the subject contract: In addition there will be a new road markings and replaced or supplemented by existing vertical road signs. c) a description of the relationship between the subject contract and the client's needs: The project will also have a positive impact on the environment, because its implementation will contribute to the reduction of noise and dust emissions in the immediate vicinity. d) the anticipated date of fulfillment of public contract foresees the launching of 06/2015

Road III / 28721 Little Rock - Snow

Liberecký kraj | Published February 18, 2015
cpvs
45233140

Restraint and traffic signs will be restored and supplemented the extent necessary in accordance with the relevant standards. a) a description needs to be the fulfillment of public contracts fulfilled: Fulfilling the procurement will be putting road III / 28721 in the above section to a functional state. b) a description of the subject contract: Restraint and traffic signs will be restored and supplemented the extent necessary in accordance with the relevant standards. c) a description of the relationship between the subject contract and the client's needs: The project will also have a positive impact on the environment, because its implementation will contribute to the reduction of noise and dust emissions in the immediate vicinity. d) the expected due date for the procurement construction period of 115 calendar days from the signing of the Treaty envisages launch: 07/2015

Ensuring social prevention "outreach programs" in the Liberec Region - Liberec

Liberecký kraj | Published November 6, 2014
cpvs

The subject of procurement is to ensure the provision of social services - outreach programs (according to § 69 of Act no. 108/2006 Coll., On social services, as amended, and Decree no. 505/2006 Coll., Implementing certain provisions of the Social Services, as amended) and to ensure their availability to members of socially excluded Roma localities in the form of landscaping in selected locations of the Liberec Region. Especially problematic groups of people, users of addictive or narcotic and psychotropic substances, to the homeless, those living in socially excluded communities and other socially vulnerable groups in the form of landscaping consisting of: • mediating contacts with the social environment; • Assist in the implementation of rights and legitimate interests and personal matters.

Road III / 29053 Haratice

Liberecký kraj | Published December 11, 2015
cpvs
45233140

The length of the section of 2430 m, an average width of 7.88 m. The fulfillment of public contracts will put the road III / 29053 in the above section to a working state. b) a description of the subject of the contract: The length of the section of 2430 m, an average width of 7.88 meters. c) a description of the relationship of the public contract and the client's needs: Implementation of the work, ie. the reconstruction of the road III / 29053 will remove the state of emergency and road to increase the life of the road, improving ride comfort, increasing public transport in the area and enhance the availability of downstream traffic axis. The project will also have a positive impact on the environment, since its implementation will contribute to reducing noise and dust emissions in the immediate vicinity. d) the expected date of fulfillment of the public contract envisages the implementation is between 03/2016 - 12/2016 Construction period of 60 calendar days from delivery and collection site

Reconstruction of roads III. Class v Semilech

Liberecký kraj | Published December 8, 2014
cpvs
45233140

Part 1: Road III / 2892 - Semily - Bítouchov length of this segment is about 940 m. The length of this section is about 510 m. Part 2: Road III / 2923 - Chuchelna I will be here for the demolition of the original bridge construction and existing foundations and abutments will be made new monolithic reinforced concrete bridge on the same field. The length of this section is about 940 m. The length of this section is about 510 m. I will be here for the demolition of the original bridge construction and existing foundations and abutments will be made new monolithic reinforced concrete bridge on the same field. a) a description needs to be the fulfillment of public contracts fulfilled: This is a reconstruction of roads III / III and 2892 / 2923rd Part 1: III / 2892 - Semily - Bítouchov outstanding three sections of the road III / 2892 are subject to this project. Part 2: III / 2923 - Chuchelna aim of the project is the reconstruction of the upper layers of the road pavement structure III. Class III / 2923, including renewal of existing drainage facilities and the addition of new objects - longitudinal drains, unpaved shoulder and others. b) a description of the subject contract: Part 1: III / 2892 - Semily - Bítouchov Jatecká) is about 155 m. The length of this section is ca 940 m. The length of this section is about 510 m. Part 2: III / 2923 - Chuchelna I will be here for the demolition of the original bridge construction and existing foundations and abutments will be made new monolithic reinforced concrete bridge on the same field. The project will also have a positive impact on the environment in the area, because its realization will reduce noise pollution around. c) a description of the relationship between the subject contract and the client's needs: The project will also have a positive impact on the environment, because its implementation will contribute to the reduction of noise and dust emissions in the immediate vicinity. d) the expected due date for a public contract for both parts of the construction period of 150 calendar days from contract signing

Preparation of project documentation - Construction of new flexible space social welfare facilities, technical and catering facilities for 24 to 30 people with disabilities Home Raspenava, after

Liberecký kraj | Published June 6, 2016
cpvs
71242000

The subject of the tender is the preparation of project documentation for the issuance of a joint zoning and building permits and documentation for building construction, including the implementation of all related activities (exploration and preparatory work), the project documentation for the interiors of buildings also perform engineering activities (building permits) and subsequent supervision for the duration of construction work. 169/2016, which comes into force on 1 October 2016 establishing the scope of the project documentation of public works contracts and the inventory of the works, supplies and services with a statement of measurements CZK CZK a) the description needs to be subject to compliance with public procurement goal of the project is the construction fully accessible flexible pavilion object with four groups of bytes (cellular system) for 24-30 persons with disabilities and create an environment close to home, to create conditions to minimize signs of institutional environment, the quality and effectiveness of services, increase privacy and standards for clients, reducing operational costs and improve overall operational - arrangement of the layout. b) a description of the subject contract, subject of the tender is the preparation of project documentation for the issuance of a joint zoning and building permits and documentation for building construction, including the implementation of all related activities (exploration and preparatory work), the project documentation for the interiors of buildings further execution of engineering activities (building permits) and subsequent supervision for the duration of construction work. 169/2016, which comes into force on 1 October 2016 establishing the scope of the project documentation of public works contracts and the inventory of the works, supplies and services with a statement of measurements CZK CZK c) a description of the relationship between the subject contract and the client's needs Based on this fact will authority may implement a public contract - Construction of new flexible space social welfare facilities, technical and catering facilities for 24 to 30 people with disabilities Home Raspenava, contributory organization. The intention is to improve the quality and efficiency of services, increase privacy and standards for clients, reducing operating costs and an overall improvement in operational arrangement of equipment: - social services reflect individual needs and are provided to the extent that it actually needs with emphasis on decent living environment ; - A way of life for users is comparable to a normal life of their peers; - They are created favorable conditions for coeducational group homes and permeability and improved usability of services with regard to the changing needs of individual users; - The service is available to everyone, in a suitable location for the provision of social services with links to a network of public services and the possibility of their use (eg. The proximity of primary school); - Target group are children and youth 3 to 26 years with severe mental and multiple disabilities and a strong need for care and support in all areas of adaptive skills, it is also assumed impaired mobility or immobility full of clients due to a disability. This will improve conditions for staff, which should positively impact on their hard work this type of award procedure the contracting entity provides the highest guarantee of transparency, equal treatment and non-discrimination most respects. d) the anticipated date of the fulfillment of public contracts. The realization is between 11/2016 - 6/2018 documentation for zoning decision - 60 days after signing the contract; Zoning decision - deadlines administrative authorities (assumption of 120 days); Documentation for building permits - 120 days after the final zoning; Issuance of building permits - deadlines administrative authorities (assumption of 180 days); The documentation for the execution of the project and documentation for the interiors of buildings, incl. inventory works supplies and services - 120 days after the final building permit; Author supervision - for the implementation of the project

Road III / 29011 Ludvíkov - New Town below spruce

Liberecký kraj | Published March 8, 2016
cpvs
45233140

29011-6. S. Vaňkova the street. With the reconstruction of housing in the framework of action to take replacement and addition of traffic signs. With regard to the change of the vertical alignment associated with amplification cover about 3 cm will be covered slopes adjacent to the property and take-offs intersecting roads. a) A description needs to be the fulfillment of public contracts achieved: 29011-6 to working condition. b) Description of the public procurement: 29011-6. S. Vaňkova the street. With the reconstruction of housing in the framework of action to take replacement and addition of traffic signs. With regard to the change of the vertical alignment associated with amplification cover about 3 cm will be covered slopes adjacent to the property and take-offs intersecting roads. c) A description of the relationship between the subject contract and the client's needs: 29011-6 will eliminate the emergency condition of these objects and to increase the life of roads, bridges, improved ride comfort, increased public transport in the area and enhance the availability of downstream traffic axis. The project will also have a positive impact on the environment, because its implementation will contribute to the reduction of noise and dust emissions in the immediate vicinity. d) Expected date of fulfillment of the public contract: The realization is between 07/2016 - 12/2016 Construction period: 120 calendar days from the handover and takeover of the site. Sponsor assumes possible to finance the construction of the State Transport Infrastructure Fund.

Road III / 28626 Benecko

Liberecký kraj | Published January 25, 2016
cpvs
50230000

The length of the reconstruction of the existing bitumen road is 2600 meters. Existing ditches will be purged and culverts under the road will be made new. Width configuration corresponds to the current road widths. The route is designed sided steel guardrail with the level of retention N2, road markings and delineators. description needs to be the fulfillment of public contracts achieved: By meeting public contracts will put the road III / 28626 in the above section to a working condition b) a description of the subject contract length reconstruction of the existing bitumen road is 2600 meters. Existing ditches will be purged and culverts under the road will be made new. Width configuration corresponds to the current road widths. The route is designed sided steel guardrail with the level of retention N2, road markings and delineators. c) a description of the relationship of the public contract and the client's needs: Implementation of the work, ie. the reconstruction of the road section III / 28626 Benecko will remove the state of disrepair of roads and increase the life of the road, improving ride comfort, increasing public transport in the area and enhance the availability of downstream transport axis. The project will also have a positive impact on the environment, since its implementation will contribute to reducing noise and dust emissions in the immediate vicinity. d) the expected date of fulfillment of the public contract envisages the implementation is between 04/2016 - 12/2016 Construction period of 120 calendar days from delivery and collection site

"Road III / 29053 Haratice and road III / 29058 Golden Olesnice"

Liberecký kraj | Published December 31, 2015
cpvs
50230000

The pet section will be repaired bitumen cover road and there is very dosypání scraping and cleaning the ditches and roadsides. Width communication is variable with an average value of 5.75 m (repair of retaining the current width parameters). ) Description needs to be the fulfillment of public contracts achieved: By meeting public contracts will put the road III / 29053 and III / 29058 in the above section to a working state. b) a description of the subject of the contract: The pet section will be repaired bitumen cover road and there is very dosypání scraping and cleaning the ditches and roadsides. Width communication is variable with an average value of 5.75 m (repair of retaining the current width parameters). c) a description of the relationship of the public contract and the client's needs: Implementation of the work, ie. the reconstruction of roads III / 29053 and III / 29058 will eliminate the emergency condition of roads and increase the life of the road, improving ride comfort, increasing public transport in the area and enhance the availability on the downstream transport axes. The project will also have a positive impact on the environment, since its implementation will contribute to reducing noise and dust emissions in the immediate vicinity. d) the expected date of fulfillment of public procurement of 85 calendar days from the handover and takeover of the site expected to commence: 04/2016

Road III / 27250 Street in Liberec, Chrastava

Liberecký kraj | Published December 7, 2015
cpvs
50230000

The route of communication is in the length of 1680 m conducted in urban Chrastava, the last stretch of 120 m are located in rural areas and builds on the R35. Communication is conducted in an existing route in designated sections should be modified transverse slopes, will be carried out repair and restoration of drainage facilities, to supplement VDZ and SDE and restraint systems. a) a description needs to be the fulfillment of public contracts achieved: Liberecké street in the above section to a working state. b) a description of the subject contract: communication route is 1680 m in length conducted in urban Chrastava, the last stretch of 120 m are located in rural areas and builds on the R35. c) a description of the relationship of the public contract and the client's needs: Another requirement is to provide construction-state, ie. ensuring a functional drainage communication and ensure appropriate treatment of structural layers according to the diagnosis and unification of durability and strength of communication. The construction must be coordinated with other investment projects, RWE, which will carry out the reconstruction of the pipeline and SVS as that will perform the reconstruction of the water supply. The project will also have a positive impact on the environment, since its implementation will contribute to reducing noise and dust emissions in the immediate vicinity. d) the expected date of fulfillment of public procurement of 270 calendar days from the handover and takeover of the site expected to commence: 06/2015

Road III / 28116 Borek - Troskovice

Librecký kraj | Published December 8, 2015
cpvs
45233140

Communication bridge crosses a stream Libuňka 28116-2. The reconstruction is homogenization width layout. The construction will be a new road markings as well as the complete replacement of traffic signs with new ones. It is designed in the same place, and its brightness based on the dimensions of today's bridge. a) A description needs to be the fulfillment of public contracts achieved: 28116-2 to working condition. b) Description of public procurement: Communication Bridge crosses the creek Libuňka 28116-2. The reconstruction is homogenization width layout. The construction will be a new road markings as well as the complete replacement of traffic signs with new ones. It is designed in the same place, and its brightness based on the dimensions of today's bridge. c) A description of the relationship of the public contract and the client's needs: Implementation of the work, ie. the reconstruction of the road III / 28116 will eliminate the emergency condition of roads and bridges and to increase the service life of roads, bridges, improving ride comfort, increasing public transport in the area and enhance the availability on the downstream transport axes. The project will also have a positive impact on the environment, since its implementation will contribute to reducing noise and dust emissions in the immediate vicinity. d) Expected date of fulfillment of public contracts: 160 calendar days from delivery and collection site Sponsor assumes possible to finance the construction of the State Transport Infrastructure Fund.