Public tenders for environment in Husinec Czech Republic

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Reconstruction of water supply and sanitation in the old part of the village Pěčnov

Obec Pěčnov | Published September 11, 2015  -  Deadline December 31, 2016
cpvs
45231300

new building sewerage and water supply: water mains pipes from PE DN 100 mm in length 323.4 mA DN 80 mm, a length of 186.05 meters and a total length of water mains 509.45 meters, the length of the public water supply connections 112.80 meters, sewer sewerage PVC DN 250 mm with a total length of 646.9 m, public sewage connections of PVC DN 150 mm with a total length of 157.35 meters justification effectiveness of public procurement: a) the description needs to be the fulfillment of public contracts fulfilled: Construction It will be used to complete the removal of sewage and drinking water inhabitants Pěčnov. b) a description of the subject of public procurement: new sewerage and water supply: water mains pipes from PE DN 100 mm in length 323.4 mA DN 80 mm, a length of 186.05 meters and a total length of 509.45 meters of water mains, length of public water supply connections 112.80 meters, sewer sewerage PVC DN 250 mm with a total length of 646.9 m, public sewage connections of PVC DN 150 mm with a total length of 157.35 mc) a description of the relationship of the public contract and the client's needs: None the implementation of the procurement procedure can not achieve the desired objective sponsor of ensuring discharge of sewage and drinking water inhabitants Pěčnov. The construction will have a positive impact on both the environment and improve living standards of citizens and community development. Implementation and optimal operation of the state of the environment in accordance with Czech legislation will protect both existing sources of groundwater and surface water. Tender procedure will be selected by the contractor with the lowest price while maintaining the required quality and scope of work. d) the expected date of fulfillment of public contracts: to 31. 12. 2016

Reconstruction of water and sanitation in the old part of the village Pěčnov

Obec Pěčnov | Published December 22, 2014  -  Deadline December 30, 2015
cpvs
45231300

new building sewerage and water supply: water mains from PE pipes DN 100 mm in length 323.4 mA DN 80 mm in length of 186.05 meters and a total length of 509.45 meters of water mains, the length of the public water supply connections 112.80 meters, sewer sewerage of PVC DN 250 mm total length of 646.9 meters, the public part of sewage connections from PVC DN 150 mm total length of 157.35 meters justification effectiveness of public procurement: a) a description needs to be the fulfillment of public contracts fulfilled: Construction will be used to complete the discharge of sewage and drinking water inhabitants Pěčnov. b) a description of the subject contract: new sewerage and water supply: water mains from PE pipes DN 100 mm in length 323.4 mA DN 80 mm in length of 186.05 meters and a total length of 509.45 meters of water mains, length of public parts of water connections 112.80 meters, sewer sewerage of PVC DN 250 mm total length of 646.9 meters, the public part of sewage connections from PVC DN 150 mm total length of 157.35 mc) a description of the relationship between the subject contract and the client's needs: No implementation of the procurement procedure can not achieve the desired objective sponsor of ensuring the discharge of sewage water and drinking water inhabitants Pěčnov. The building will have a positive impact on both the environment and raising the living standards of citizens and community development. After the implementation and optimal operation of the state of the environment in accordance with the legislation of the Czech Republic, will be protected secondly existing sources of groundwater and surface water. Tender procedure will be selected by the contractor with the lowest price while maintaining the required quality and scope of work. d) the anticipated date of fulfillment of public contracts: 04 - 12/2015

Delivery of neutron shields and components, neutron diffractometer BEER including related research and development

Ústav jaderné fyziky AV ČR, v. v. i. | Published July 22, 2016
cpvs

The subject of this contract is the delivery of the neutron diffraction instrument called "Beamlines for European Engineering Research" (hereinafter "BEER") at the European spalačního source (hereinafter "ESS"), specifically neutron shielding and engineering of the instrument of delivery includes research and development, design, construction and installation currently, there is a scientific design and preliminary technical design of the instrument, which passed the international scientific and technical review process. A more detailed description of this concept can be found on the website of the ESS: https://europeanspallationsource.se/building-europes-next-flagship-engineering-diffractometerfuture- beer on the basis of scientific and technical concept will be brought to the design and implementation phase, part of which is the subject of this contract and which will include: Under construction phase: 1) research and development work for supply, focusing in particular on the following: a) based on the simulation calculations to design and optimize shielding neutronovodu outside the main shielding sources (bunker), total The 128 has a sheltered The optimization of shielding concerned taking into account existing computational models and results in question related components and technology units of the project ESS; b) Create a structural design engineering delivery instrument, namely supporting platform environment sample and neutron detectors and transport and parking platform for simulating the device manufacturing processes or operating conditions of the test material; c) Ensuring adversary and approval of the draft shield design solution by ESS. 2) design, manufacture, testing and assembling supplies (neutronovodu shielding, shielding experimental cells and mechanical parts - carrying, transportation and parking platforms instrument). As part of the implementation phase: 1) installation supply (shielding neutronovodu, shielding experimental cells and mechanical parts) into the instrument BEER in the experimental hall ESS, 2) documentation of actual in the range of standards, ESS, 3) documentation demonstrating that the supply meets the requirements of the ESS properties shielding, 4) performance tests and in a range of standards ESS 5) making the necessary connections to interface with surrounding systems. Detailed description of the subject contract will be stated in the tender documents. 137/2006 Coll., On Public Procurement, as amended. Applications must be made so as to be received no later than the deadline.

Delivery of neutron shields and components, neutron diffractometer BEER including related research and development

Ústav jaderné fyziky AV ČR, v. v. i. | Published May 20, 2016
cpvs
73000000

A more detailed description of this concept can be found on the website of the ESS: https://europeanspallationsource.se/building-europes-next-flagship-engineering-diffractometer-future-beer On the basis of the scientific and technical concept will be brought to the design and implementation phase, part of which is the subject of this contract and which will include: Under Construction phase: 1) research and development work for supply, particularly to the following: The optimization concerned shield into account existing computational models and results in question related components and technology units ESS project. b) Create a structural design engineering delivery instrument, namely supporting platform environment sample and neutron detectors and transport and parking platform for simulating the device manufacturing processes or operating conditions of the materials tested. c) Ensuring adversary and approval of design solutions by the ESS. 2) design, manufacture, testing and assembling supplies (neutronovodu shielding, shielding experimental cells and solutions engineering part of the instrument). within the framework of the implementation phase: 1) installation supply (shielding neutronovodu, shielding experimental cells and solutions engineering part of the instrument) to the instrument BEER, 2) documentation of actual in the range of standards, ESS, 3) documentation demonstrating that the supply meets the shielding properties, 4) performance tests and testing in a range of standards ESS 5) making the necessary connections to interface the system around. The Contractor is not entitled to any additional payments and an extension of the delivery date due to an incorrect interpretation of any documents or information relating to the subject of supplies received from the sponsor. Reason effectiveness of public procurement: The description needs to be the fulfillment of public contracts fulfilled for the implementation of the supply is in addition to professional competencies needed and close coordination between suppliers, foreign partners and the ESS, so that supply meets all standards and requirements for device integration infrastructure ESS, including requirements for radiation safety. Research and development, as well as the design and manufacture of this instrument are funded by the Ministry of Education, Youth and Sports as a project called "European spalační source - the participation of the Czech Republic" in support of large infrastructures for research, experimental development and innovation. A description of the subject contract subject of this procurement is described above under II.4) of this section II.B. Description of the relationship between the subject contract and the client's needs Implementation of the contract will allow the project to move diffraction instrument BEER from the current scientific and technological concepts into the design and implementation phases and thus fulfill part of the in-kind contribution of the Czech Republic in an international research infrastructure ESS. Expected date of fulfillment of public procurement timetable envisages the first stage of labor (construction phase) in the financial year 2016-2019 the above project, the Ministry of Education, the second stage (the implementation phase) should be completed in the financial year 2020-2022.
  • 1