N02, 150004, RHEINTU BS, Rhein tunnel Basel creating GP / engineering services in the field of environment

Bundesamt für Strassen ASTRA Filiale Zofingen | Published August 16, 2016  -  Deadline May 27, 2016
cpvs

N02, 150004, RHEINTU BS, Rhein tunnel Basel creating GP / engineering services in the field of environment

N02, 150004, RHEINTU BS, Rheinallee Basel general development plan (GP) / engineering services in the field of environment

Office fédéral des routes OFROU Succursale de Zofingue | Published August 16, 2016  -  Deadline May 27, 2016
cpvs

N02, 150004, RHEINTU BS, Rheinallee Basel general development plan (GP) / engineering services in the field of the environment.

N02, 150004, RHEINTU BS, Rhein tunnel Basel creating GP / engineering services in the field of environment

Bundesamt für Strassen ASTRA Filiale Zofingen | Published March 18, 2016  -  Deadline May 27, 2016
cpvs
71300000

The Federal Roads Office is responsible for construction, maintenance and operation of the Swiss national road network.

Between Birsfelden and Basel Nordtangente a new tunnel connection between the branch and the branch Hagnau area is to be created (Project title Rhine tunnel) on the discharge of the national road N02. The core consists of two tunnel tubes with one lane and a hard shoulder (variant C), which can also be operated in two-lane. The variant Cmax additionally includes a connection of traffic to and from Germany (including access ramps to connect the Rhine tunnel -. A5).

The present tender mandate includes services for the planning of mitigation and compensation measures, clarifications regarding temporary and permanent landfill sites and the processing of landscape-related topics (landscape, landscape concepts, networking) in exchange with the other project authors and the authors of the environmental impact report (EIS).

Subject of the advertised mandate are services as project authors environment for phases General project and execution project (optional).

For the detailed task details in tender documents.

N02, 160031, 8S HAG AUG Hagnau - Augst, 8-strips Construction / project authors Environment

Bundesamt für Strassen ASTRA Filiale Zofingen | Published March 20, 2017  -  Deadline May 15, 2017
cpvs
71300000

CPV: 71300000 - Engineering services

N02, 160031, 8S HAG AUG, Hagnau - Augst, design 8-way / author of the Environment project

Bundesamt für Strassen ASTRA Filiale Zofingen | Published March 20, 2017  -  Deadline May 15, 2017
cpvs
71300000

Issue of 956,599
The official tender was published in the following publication organ: Information system on public procurement in Switzerland (www.simap.ch), electronic publishing prevail.
Published: 03/20/2017

Engineering services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published April 8, 2017
Winner
Emch+Berger AG Bern
cpvs
71300000

N04, 110016, conservation project Rütihof intersection - Connection Küssnacht, project authors environment.

Engineering services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published December 15, 2016  -  Deadline January 31, 2017
cpvs
71300000

The conservation project N4 Rütihof - Küssnacht provides perform at Trassee and engineering works in the period from 2022 to 2023 repair and reinforcement work and thus to make sure the hands-off operation for the next 15 to 20 years. In addition, subsequent restructuring noise in the project perimeter, the execution (implementation) of an AP noise in the municipality Küssnacht (AP is already available), and the construction of a new SABA and a new wildlife overpass.

The present tender are the benefits of the project author (PV) environment for the phases from design project / action approach to and with permission detailed project / action project. This includes the creation of the necessary environment for the conservation project notes, the noise protection projects, the SABA Fänn and Wildlife transfer based on the technical manuals / checklists and configuration tools of ASTRA.

Optional features of the PV environment for UBB the VOMA on the ...

Engineering services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published March 8, 2017
Winner
Pöyry Schweiz AG
cpvs
71300000

N02 / N14, 100054, total system bypass Lucerne, project authors Environment / acoustic / material management, TP 6 (PV TP 6); Phases AP / MK incl. PGV and DP / MP and cantonal development, approval procedures / Edition project.

N04 110016 conservation project Rütihof intersection - Connection Küssnacht, project author Construction / BSA

Bundesamt für Strassen ASTRA Filiale Zofingen | Published June 24, 2016  -  Deadline August 30, 2016
cpvs
71322500

The conservation project N4 Rütihof - Küssnacht provides perform at Trassee and engineering works in the period from 2022 to 2023 repair and reinforcement work and thus to make sure the hands-off operation for the next 15 to 20 years. In addition, subsequent restructuring noise in the project perimeter, the execution (implementation) of an AP noise in the municipality Küssnacht (AP is already available), and the construction of a new SABA and a new wildlife overpass.
The present tender are the benefits of the project author (PV) and the local construction management (OBL) for the fields Trassee, engineering structures and BSA according to the performance described and technical manuals of ASTRA for all project phases from design project / measure concept up and repair / completion. This includes the rehabilitation of the trackbed and plant management (incl. vorgängiger electronic detection as a basis for planning), the repair of engineering structures (incl. Completion of triage engineering structures and static verification), configuring the SABA Fänn, optimizing SABA Rotkreuz with the reconstruction of the drainage (incl. collection of extraneous water inflow) and the repair of the BSA systems.
The project authors building / BSA accepts the conservation project N4-Rütihof - the technical coordination Küssnacht.
For the following topics separate project authors mandates are advertised: Wildlife corridor / slope safety, the environment, noise / acoustics, traffic planners, landscape planning / Wildlife Biology and fault (see organization chart).

Engineering services

Bundesamt für Straßen ASTRA Filiale Zofingen | Published December 21, 2016  -  Deadline February 15, 2017
cpvs
71300000

The national road section N04 / 24 is part of the Swiss National Road N4, which of

He was in the years 1972 to 1981 as a national road. 2

After an operating time of greater than

30 years, the system has normal to heavy wear and tear.

20 kilometer-long stretch, which

the connection Küssnacht (km 107.000) until the northern portal of Mositunnels (km 127.600)

Under the EP KüBru is the national road N04 incl. All engineering structures, tunnels,

The district connection

Arth (only exit in driving direction Goldau) and the connections Goldau, Schwyz and fountain

are also components of the project.

The environmental construction (UBB) / Soil construction supervision (BBB) ​​is a department of

Building owners in the Environment:

- The UBB / BBB controls the enforcement of environmental measures in the projects on behalf of the

Overall project management of the ASTRA-branch;

- The UBB / BBB acts as a contact point to the official environmental protection agencies of the

Federal, the canton of Schwyz and the communities Küssnacht, Arth, Steinerberg, stones, Schwyz

It brings in Canton in the necessary information for their activities.

Environmental issues are directly agreed with the overall management of the ASTRA

to clarify the relevant departments within the Canton;

- If, in the course of realization of project adjustments with environmental

Consequences, the UBB / BBB informs the overall project management of the ASTRA-store time

and provides for the necessary clarifications;

- The UBB / BBB monitor the implementation planning of entrepreneurs on environmental

Protection, restoration and compensation measures;

- The UBB / BBB controls the proper and full implementation and the effect of

decreed protection, restoration and replacement measures during the implementation phase;

- Information and communication with the local community carried out over the

The UBB / BBB is an expert in environmental technical issues

consulted and supported the building owner concerning publicity,

Orientation meetings, inspections, requests for information, etc .;

- The UBB / BBB created the final report for environmental construction.

Environmental monitoring for construction

Bundesamt für Strassen ASTRA, Filiale Zofingen | Published June 26, 2015  -  Deadline August 3, 2015
cpvs
71313450

The conservation project EP Schänzli includes various maintenance and expansion measures in accordance with the UPlaNS strategy of ASTRA. In addition to the repair work on route N02 / H18 (about 10 km) and to the 90 inventory objects (bridges, retaining walls, overpasses and underpasses) particularly important repair work on the tunnel and the Schänzli Aufweitung- and expansion projects of the tunnel Hagnau are provided. In addition to the tunnel widened another accident black spot is eliminated with the creation of a new Überwerfungsbauwerkes. Further, the realization of a road and a waste water treatment plant stack basin is provided. Within the project also the entire conservation section was investigated noise tests and the necessary noise protection measures defined. While planning the maintenance and expansion projects of the conservation project, the relevant environmental notes for the 7 implementation projects (AP) and for the control scheme (MK) or measures Project (MP) worked, as well as the appropriate project-specific specifications for environmental construction each were created. Contents of this tender are the benefits of environmental construction (UBB) from the Submission phase (partly) and in particular during all implementation phases of the project.

Environmental monitoring for construction

Bundesamt für Straßen ASTRA Filiale Zofingen | Published December 2, 2015
Winner
Ingenieurbureau A. Aegerter & Dr. O. Bosshardt AG
cpvs
71313450

N02, 080126, EP Schänzl, EP Schänzli / suivi environnemental de la phase de réalisation.

N02, 080 126, EP SCHÄNZL, EP Schänzli / environmental construction UBB.

Bundesamt für Strassen ASTRA Filiale Zofingen | Published June 22, 2015  -  Deadline August 3, 2015
cpvs
71313450

The conservation project EP Schänzli includes various maintenance and expansion measures in accordance with the UPlaNS strategy of ASTRA. In addition to the repair work on route N02 / H18 (about 10 km) and to the 90 inventory objects (bridges, retaining walls, overpasses and underpasses) particularly important repair work on the tunnel and the Schänzli Aufweitung- and expansion projects of the tunnel Hagnau are provided. In addition to the tunnel widened another accident black spot is eliminated with the creation of a new Überwerfungsbauwerkes. Further, the realization of a road and a waste water treatment plant stack basin is provided. Within the project also the entire conservation section was investigated noise tests and the necessary noise protection measures defined. While planning the maintenance and expansion projects of the conservation project, the relevant environmental notes for the 7 implementation projects (AP) and for the control scheme (MK) or measures Project (MP) worked, as well as the appropriate project-specific specifications for environmental construction each were created. Contents of this tender are the benefits of environmental construction (UBB) from the Submission phase (partly) and in particular during all implementation phases of the project.

N02, 160031, 8S HAG AUG, Hagnau - Augst, design 8-way / planner Environmental Compatibility Report - engineering services in the fields of environmental compatibility report / NISTRA / ratings

Bundesamt für Strassen ASTRA Filiale Zofingen | Published November 21, 2016  -  Deadline February 3, 2017
cpvs
71300000

Issue of 938,791
The official tender was published in the following publication organ: Information system on public procurement in Switzerland (www.simap.ch), electronic publishing prevail.
Published: 11/21/2016

Hagnau - Augst, 8-way development / planner Environmental compatibility report - engineering services in the fields Environmental compatibility report / NISTRA / evaluations

Office fédéral des routes OFROU Succursale de Zofingue | Published April 27, 2017  -  Deadline February 3, 2017
cpvs

Hagnau - Augst, 8-way development / planner Environmental compatibility report - engineering services in the fields Environmental compatibility report / NISTRA / evaluations

N02, 100027, AS Sempach, remodeling and renovation connection Sempach, planners Trassee / Environmental and BSA for the phases of the project Detail project (DP) / Measures Project (MP) and realization incl. Construction management (SIA phases 41-53)

Bundesamt für Strassen ASTRA Filiale Zofingen | Published August 17, 2015  -  Deadline October 5, 2015
cpvs
71300000

The Sempach connecting the national road N02 was launched in the summer of 1981 in operation. It consists of the entrance and exit ramps, the two nodes Obermühle and Honerich connecting the national road to the subordinate road network (K48 / K56). The node Obermühle was founded in 2004 turned into a makeshift roundabout, otherwise the connection Sempach has not been changed since its commissioning in 1981. The ASTRA (branch Zofingen) intends to ensure the traffic safety and efficiency of the port definitely rebuild both nodes in a roundabout. Simultaneously, the terminal will be fully repaired. For this purpose, an exemplary project (AP) with integrated measures Project (MP) from 11.05.2015 to 09.06.2015 was publicly launched. In addition to the node reshaping the situation is optimized for non-motorized traffic and renewed the road surface. The drainage of the connection to be re-connected via a pumping station on the drainage of the national road. The present procurement are the planning services of ASTRA-Divisions T / U and BSA for the phases of the project Detail project (DP) / Measures Project (MP) and realization incl. Local construction management (SIA phases 41-53) according to separate specifications dat. 17/08/2015 ,

N02, 080,396 AS Dagmersellen, remodeling renovation + connection Dagmersellen, project authors Trassee / Environmental and engineering structures for the project phases detailed project (DP) / Measures Projects (MP) SIA-phase 32 + realization incl. Construction management (SIA phases 41-53)

Bundesamt für Strassen ASTRA Filiale Zofingen | Published October 23, 2015  -  Deadline December 14, 2015
cpvs
71300000

Today freeway access Dagmersellen since the late 1970s in operation and was just over 30 years operated in the same state. In 2009, the then unregulated T-node East & West were rebuilt as an emergency measure in the present provisional centrifugal East & West. This type of node has a greater efficiency and at the same time led to a significant increase in road safety. The terminal buildings and the adjacent street spaces are located partly in a poor condition, which is why the Federal Roads Office is planning the redesign and renovation of the entire motorway junction. The transformation of the node comprises among others the optimization of the node geometry minimum necessary adjustments to the lane widths, additional bypasses, adaptation of hiking and cycling guide and adapting the road drainage. The renovation includes the repair of the superstructure, the replacement of signaling and guidance systems. The engineering structures were examined for their condition and assessed. The UEF connection Dagmersellen is a renewal of the seal, the drainage shafts and the road crossings and bicycle underpass Dagmersellen a renewal of the seal is provided. The present procurement are the planning services of ASTRA-Divisions T / U and K for the phases of the project Detail project (DP) / Measures Projects (MP) SIA-phase 32, and realization incl. Construction management (SIA phases 41-53) according to a separate specification.
  • 1