Call +44 800 9755 164

Public tenders for environment in Hasselt Belgium

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

TERVUREN FPS Health Food Environment / Science Policy: Creation of DWA and RWA sewerage

Regie der Gebouwen - Vlaanderen Regio Oost | Published September 19, 2016  -  Deadline December 19, 2016
TERVUREN FPS Health Food Environment / Science Policy: Creation of DWA and RWA sewerage

Realization of a stimulating learning and working environment for research and education

Hogeschool PXL | Published October 28, 2016  -  Deadline December 6, 2016

Performing renovations.

The command is issued for the following lots:

Lot 1: Architectural section

- demolition

- Structural work

- Concrete structures

- Carpentry

- Aluminum exterior joinery

- roofing

Lot 2: Finish

- Plasterboard and plaster works

- glass walls

- Light partition

- interior

- paintings

- Tile work

- Interior joinery / furniture

Lot 3: Electricity

- Customize and extend existing installation

- lighting

- Fire and intrusion detection including signaling.

- Automatic door systems

- internet

Lot 4: HVAC and plumbing

- Full ventilation

- Heating - expansion

- All kinds of pipes

- Sanitary ware including appliances and accessories.

60/02/14/00474: MST.T0.070 TANGENT: Technical equipment, Road, Finishing & Signs, green construction and Bicycle Infrastructure Mechelen Station Surroundings

NMBS-Stations B-ST.5O | Published November 21, 2016  -  Deadline January 26, 2017

GENERAL

Current adoption includes the work to implement the finishing and technical equipment of the new access road or "tangent" in Mechelen, which runs partly underground.

The tangent runs from the Brusselsesteenweg (near the flyover to Mechelen-South) until the N15 (near the Customs Square).

Current adoption includes the works of construction of a Bike-o-strade located next to the tangent between the Brusselsesteenweg and the N15.

These works include among others the construction of bicycle and pedestrian tunnels under the existing and newly constructed roads and two bicycle bridges (at the N1 and N26 at halt) on the tangent.

Current adoption involves the construction of a very large landscaped park that runs alongside the tangent from the N1 till the N15.

The adoption consists mainly of preparatory works, drainage works, roads, building structures, finishing works and technical equipment roads and tunnels, road signs, parks and green areas, ....

  • 1