Call +44 800 9755 164

Public tenders for environment in Gent Belgium

Find all Environment tenders in the world.
Finding business opportunities has never been easier.

Results for environment. Make a new search!

Renovation and school environment

vzw Impuls Vrije Basisschool | Published November 19, 2014  -  Deadline January 9, 2015
cpvs
45000000

Renovation and school environment

Renovation Edugo campus St. Vincent Oostakker plot 9 work environment

VZW Katholieke Scholen Regio Gent-Oost | Published September 30, 2015  -  Deadline November 5, 2015
cpvs
80000000

Renovation Edugo campus St. Vincent Oostakker plot 9 work environment

1996.3 Sint-Amandsberg - New class wing - Lot 4 Environment Construction

vzw Koga | Published January 13, 2015  -  Deadline February 18, 2015
cpvs
45000000

1996.3 Sint-Amandsberg - New class wing - Lot 4 Environment Construction - execution time 50 working days: Phase 1: Phase 2 and 40 working days to 10 working days

Hamme: PTI - Environment Construction

Provincie Oost-Vlaanderen | Published July 12, 2016  -  Deadline September 6, 2016
cpvs
45222000, 45220000

Performing adjustment work on the exterior of the Provincial Technical Institute in Hamme.

AF 8870-16-001b New sports site Cricket South Izegem: Part environment construction

TMVW servicelijnen | Published November 8, 2016  -  Deadline December 21, 2016
cpvs
45230000

The city Izegem intends to build a football grandstand with changing rooms, sanitary facilities and cafeteria, to build a football field in artificial turf and renew existing athletics track at the site at the height of the sports complex, the Cricket South.

The present sub-project includes the construction of a football field in artificial turf (incl. Illumination 2nd class amateurs), renovation athletics track and equipment (incl. Outdoor lighting), construction stand stand with storage, the environment construction around the football and athletics track and the construction of a Finnish track.

The implementation period is divided into function of the new works in two distinct phases:

- Phase 1: artificial pitch;

- Phase 2: athletics track.

Probable starting date of phase 1 artificial: april 2017. The work is to be completed by the end of July 2017.

Probable starting date Phase 2 athletics track: January 2018. The work is to be completed by the end of May 2018.

The proposed maximum execution times of this contract are set out in the following part steps:

Phase 1a: artificial pitch construction (including field lighting.), Closures and accessories including environment around the football field: 60 calendar days.

Phase 1b: green areas around the football field: 15 calendar days.

Phase 2a: renovation athletics track (including lighting.), Closures and accessories including environment around the athletics track and build new stand stand with storage (including scarifiying existing grandstand.): 165 calendar days.

Phase 2b: green areas around the athletics track: 20 calendar days.

Eeklo: Huysmanhoeve - design contract extension Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the outdoor environment.

Provincie Oost-Vlaanderen | Published March 17, 2016  -  Deadline May 3, 2016
cpvs
71220000, 71221000, 71223000, 71315000, 71320000, 71327000

Eeklo: Huysmanhoeve - design contract extension Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the outdoor environment.

New construction hall Oostbroek to Nevele: Part environment construction

TMVW servicelijnen | Published October 2, 2015  -  Deadline November 10, 2015
cpvs
45230000

The Nevele municipality wishes to erect a new sports hall at the height of Oostbroek - Zeistraat 41 to Nevele. This task is divided into several sub-projects. This sub contract includes construction area (construction of sports fields, pavement, green areas) Probable starting date: February 2016 Period: 80 days

Newly built schoolhouse demolition masonry finishing techniques environment construction

vzw Katholieke Scholen Regio Gent | Published October 6, 2015  -  Deadline November 20, 2015
cpvs
45000000

Newly built school building with demolition of an existing school building. -kelderverdieping with gymnasium and changing rooms -gelijkvloers with one-floor multi-purpose room with four second-floor classes with four classes

Eeklo: Huysmanhoeve - Design Mission for development Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the external environment

Provincie Oost-Vlaanderen | Published October 17, 2016
cpvs
71220000, 71221000, 71223000, 71315000, 71320000, 71327000

Eeklo: Huysmanhoeve - Design Mission for development Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the external environment

Eeklo: Huysmanhoeve - Design Mission for development Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the external environment

Provincie Oost-Vlaanderen | Published March 15, 2016  -  Deadline May 3, 2016
cpvs
71220000, 71221000, 71223000, 71315000, 71320000, 71327000

Eeklo: Huysmanhoeve - Design Mission for development Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the external environment

Call for application to participate - The format of an Exploratory Spatial Research for the Viaduct B401 and environment, through the development of possible scenarios for the transport infrastructure and the development of the environment, and in order to more sustainable mobility, the restoration of the urban fabric and to achieve an improvement in the quality of living and quality of life in the area

Stad Gent | Published July 25, 2016  -  Deadline September 27, 2016
cpvs
71400000, 71300000, 71311210

Overall, this contract includes the preparation of an Exploratory Spatial Research for the Viaduct B401 and environment, through the development of possible scenarios for the transport infrastructure and the development of the environment, and in order to more sustainable mobility, the restoration of the urban fabric and a improve come the quality of living and quality of life in the area.

This request thus concerns the development of a new urban and mobility vision for the project environment, traffic technical review and conduct the necessary capacity calculations (flow, parking, ...) on the proposed interventions with impact on mobility and traffic flow and the coordination and processing the participation and communication process conducted by the city.

The subject of the contract is extended out in the project definition

In this note with the project definition following information available:

1. Description of the contract

1.1. Vision Elements of the contract

1.2. Research at the command

1.3. Available plans / investigations

1.4. project Structure

2. Spatial and historical context

2.1. Spatial location of the study area

2.2. Historical context and urban development

2.3. Mobility and Environment

2.4. Viaduct Project B401: Strategic dialogue: recent history

3. Location of the project Viaduct B401

3.1. Concepts (map)

3.2. policy context

3.3. Developments and projects in the immediate vicinity

3.4. Opportunities in the region

3.5. Problems of the area

Call for applications - Upgrade Dynamics AX for IMOG

IMOG | Published April 16, 2015  -  Deadline June 5, 2015
cpvs
72263000, 48000000, 48219300, 48440000, 48451000, 48480000, 48490000, 72000000, 72212440, 72212451, 72212480, 72212490, 72260000

The project includes providing all services related to upgrading current Dynamics AX4 environment IMOG to AX2012 (or newer). A detailed functional analysis where the resulting environment to meet, will sit included in the specifications. For the realization term, we aim for a production date of 01-01-17.

Call for application to participate - Renovation 3rd Phase Training Complex, appointment consortium for "structural work, finishes, fixed furniture, HVAC, plumbing, electrical installations, lifts and construction environment"

Universiteit Gent | Published June 15, 2016  -  Deadline August 16, 2016
cpvs
45214400

Within the Master of Science Ghent University will carry out a thorough renovation of the Training Complex. To realize these works, the Roadmap Training was developed that maps the successive construction phases. The biggest renovation includes the renovation of the complex Training, especially the renovation rise building, the 2nd phase and 3rd phase. envisaged in the master plan in 2006 to bring the research, lab spaces and leszalen into the low-rise, high-rise and 2nd phase. Is the 3rd phase, with the exception of the ground floor (leszalen), 1st floor (leszalen) and the 5th floor (Bacteria Collection), reserved as a museum block.

The appointment of a contractor for setting up the nursery Tricycle Ostend

TMVW servicelijnen | Published July 1, 2015  -  Deadline August 21, 2015
cpvs
45400000

The appointment of a contractor for setting up the nursery Tricycle Ostend. * Lot 1: Structural works with finishing and techniques. * Lot 2: Working Environment.

IT services: consulting, software development, Internet and support

Universiteit Gent | Published May 10, 2017  -  Deadline July 3, 2017
cpvs
72000000

This assignment concerns the conclusion of a framework agreement or a service agreement on call for the execution of all kinds of ICT tasks for the UGent Association and UZ Gent Associations, such as: the IT support of their employees and their students, management and the Expansion of their IT systems and their networks, management and expansion of the UGent's SAP environment, UZ Gent, leading various IT projects, managing and expanding the UGent Sharepoint environment and the UZ Gent, developing web applications and developing mobile applications.

Architectural, construction, engineering and inspection services

Stadsontwikkeling Gent | Published February 2, 2017  -  Deadline March 20, 2017
cpvs
71000000

Redevelopment of the Holy Hartplein, the Sacred Heart Church and around Sint-Amandsberg, Ghent.

Assignment for architecture, environment construction, stability, technical equipment and EPB reporting.

Architectural design services

Provincie Oost-Vlaanderen | Published October 22, 2016
Winner
TV Zoom architecten + Callebaut architecten
cpvs
71220000, 71221000, 71223000, 71315000, 71320000, 71327000

Eeklo: Huysmanhoeve - design contract extension Streekcentrum Huysmanhoeve as "Gate of the Meetjesland" integrating multipurpose, educational rooms and cafeterias, including layout sketch for organizing the outdoor environment.

Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork

TMVW servicelijnen | Published October 29, 2016  -  Deadline December 22, 2016
cpvs
45230000

The town Diksmuide would sport the site plumes located Pluimstraat 18 Diksmuide organize her. This contract includes the construction environment.

Probable starting date: spring 2017.

AF 8600-16-005 The appointment of a contractor for the construction area at the sports site Plumes Diksmuide

TMVW servicelijnen | Published October 27, 2016  -  Deadline December 22, 2016
cpvs
45230000

The town Diksmuide would sport the site plumes located Pluimstraat 18 Diksmuide organize her. This contract includes the construction environment.

Probable starting date: spring 2017.

B116217-P1

Provincialaat Broeders van Liefde | Published November 3, 2016  -  Deadline November 22, 2016
cpvs
45000000

Provincialaat association of the Brothers of Charity

UPC St. Kamillus

Perimeter Security Division St. Joseph

Lot 1 - Work Environment - Perimeter Security