WVI - Damme: Implement drainage, paving and surrounding works in the newly constructed industrial Moerkerke to Lo, located along the Moerkerke Bridge and opposite the existing industrial area along the Kalker Street in Damme

WVI_EXTERN_Lobelle | Published October 13, 2016  -  Deadline November 21, 2016
WVI - Damme WVI: Infrastructure works in the business "Moerkerke Lo" in Moerkerke

Sewage, refuse, cleaning and environmental services

Mobiliteit en Openbare Werken, Agentschap Wegen en Verkeer, Afdeling West-Vlaanderen | Published September 6, 2016  -  Deadline October 24, 2016

Clean tunnels in District 311 and 315.

The adoption includes mainly:

- The complete cleaning and removal of all drainage systems (drains, manholes, pumping stations, reservoirs, drainage troughs, oil separators, ...), cleaning wall coverings, ceilings, steps, stairways, safety shock absorbers, parapets, bridge decks and various accessories described tunnels / bridges this adoption.

All tunnels for vehicles, if so indicated, the cleaned overnight, all administrative burdens that come here are also a burden adoption. The contractor will not be paid extra for nightly performances.

If the works take more than one night, the contractor must remove all signs back to the dawn and completely clear the tunnel.

The tunnels for pedestrians and cyclists are always cleaned during the day. The users of the tunnels should the contractor must always have transit, if required during the cleaning work discontinue its work to allow passage.

The supply of water for the cleaning work is also an adoption expense.

- The processing of dredged materials. The contractor is responsible for the transport and processing of clearance spoil. Transportation and processing should always be done in accordance with applicable environmental and transportation laws. The contractor is only paid on the basis of its weight vouchers, invoices and processing certificates. This post is only understood the transport and processing of the waste collected. Possible environmental charges for dumping or incineration shall be paid into the separate account provided for this purpose.

- Local / maintenance / removal of yard signs.

- The maintenance of the works during the guarantee period.