Public tenders for watermain in United States

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergywatermainUnited States

Y--Design Build - Replace Watermain

Department of Veterans Affairs, VA Roseburg Healthcare System | Published April 1, 2010  -  Deadline May 12, 2010
cpvs

DESIGN BUILD WATERMAIN REPLACEMENT.Project 653-10-410 Department of Veterans Affairs Roseburg VA Medical CenterNetwork Contracting Office (Bldg.17/ Rm. A117)913 NW Garden Valley BlvdRoseburg, OR 97470-6523 The Veterans Integrated Service Network #20 (VISN20) is preparing a Design Build solicitation as a Veteran Owned Small Business(VOSB) set-aside for replacement of approximately 1100 linear feet of 8"watermain. The contractor shall provide design and construction including all tools, travel, labor, materials, permits, licenses and supervision for Watermain Replacement. The NAICS code for this project is 237110 Size Standard 33.5 million dollars with a Firm Fixed Price contract being anticipated. Questions regarding this solicitation must be in writing to the Contracting Officer, via email: neil.stearns@va.gov. NO TELEPHONE REQUESTS WILL BE ACCEPTED. The solicitation is anticipated to be issued on April 12, 2010, with a proposal response on May 11, 2010. The estimated project dollar amount is expected to be $250,000.00 to $500,000.00. .

Construct Watermain Taxiway

Department of the Air Force, Air Force Materiel Command | Published June 9, 2014
cpvs

Eglin AFB FL has a requirement to construct a new water main at Taxiway H, Main Airfield, Eglin Air Force Base, Florida. The NAICS code for this requirement is 237110 and the size standard of $33.5M. This is a Total Small Business set-aside acquisition. This is a Performance Price Trade Off acquisition and award will be made based upon the Best Value to the Government in accordance with FAR 15.3. The Government reserves the right to award a contract to other than the lowest proposed price. All responsible sources may submit an offer that shall be considered by the agency. This project includes but is not limited to the following: furnishing all plant, labor, equipment and materials and performing all operations required to Construct a Watermain at Taxiway H, Eglin AFB, FL. The intent of this project is to construct a new water main to provide fire protection to Taxiway H in accordance with the Statement of Work dated 9 June 2014 (attached), and the Specifications and Drawings dated August 2012. Estimated performance period is one hundred fifty (150) calendar days after issuance of Notice to Proceed. The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment in accordance with the plans and specifications. The work is located at the main airfield, Eglin AFB FL. Estimated magnitude of construction is between $500,000 and $1,000,000. In accordance with FAR Clause 52.232-18 - Availability of Funds, funds are not currently available for this requirement. No award will be made until funds are available to make payments under a contract. The Government reserves the right to cancel this requirement either before or after the receipt of your proposal with no obligation to the offeror by the Government. This is a paperless acquisition. Paper copies of the solicitation will not be issued. The Request for Proposal (RFP) will be available on the Federal Government Electronic Posting System www.fedbizopps.gov on or about 25 June 2014. The ESTIMATED PROPOSAL DUE DATE is 25 July 2014. No response to this notice is necessary and no Source List will be maintained. Prospective contractors must be registered in the System for Award Management (SAM) database https://www.sam.gov/portal/SAM/ prior to award of a Government contract. Offerors are further advised that failure to register in the SAM database will render your firm ineligible for award. Point of Contact: Rosa Mueller, Contract Specialist, e-mail rosa.mueller@us.af.mil

Z--Replacing Hydrants, Valves, and Watermain at Fort McCoy, WI

Department of the Army, Army Contracting Agency, North Region | Published September 27, 2007
cpvs

Link to FedBizOpps document. lorenzo.lopez2@us.army.mil

RECOVERY--Y--Install new Eastside Watermain at Detroit Arsenal, Warren, MI

Department of the Army, U.S. Army Corps of Engineers | Published March 19, 2012
cpvs

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): Futurenet Group Inc; W912QR10C0059 Modification to remove a rock inside a 20" Casing and to add a concrete sidewalk to Building 250BP to the parking lot.

Lava Lands Visitor Center Water System Upgrades

Department of Agriculture, Forest Service | Published April 8, 2008  -  Deadline May 23, 2008
cpvs

This project consists of general upgrades to the water system at Lava Lands Visitor Center and grounds. It includes demolishing and disposing of: the existing well head and weather structure (doghouse); water and electrical lines to the pumphouse; pumphouse interior water and electrical controls/power equipment; pumphouse double steel access doors; and watermain to the visitor center. New construction under this project includes: a pitless adapter unit for weather proofing the well head; a new 20HP submersible well pump for potable water; new electric power and controls to support the new water system; upgrades to the pressure controls of the existing hydropneumatic tank; miscellaneous lighting and rewiring within the pumphouse; installation of new double steel doors to the pumphouse; a new 4� watermain; reconnection to service laterals; new electrical conduit with control cable for alarm at the Visitor Center; and miscellaneous backflow prevention devices at the RV site area. This work includes excavation, backfill, finish grading, as well as asphalt pavement and concrete curb and sidewalk repairs for utility trenches. Work is expected to commence August 4, 2008 with a completion date 90 days later. All solicitation documents will be available on this site on or around April 24, 2008.

RECOVERY--Z--Oakland County Red Run Construction Project 76281

Department of the Army, U.S. Army Corps of Engineers | Published June 15, 2011
cpvs

RECOVERY - PER FAR 5.7 THIS NOTICE IS PROVIDED FOR INFORMATION PURPOSES ONLY; THEREFORE FAR 5.203 DOES NOT APPLY. THIS OPPORTUNITY WAS AVAILABLE ONLY TO CONTRACTOR(S) UNDER THE CURRENT CONTRACT NUMBER(S): SITE DEVELOPMENT INC. W911XK-C-0026, RED RUN CONSTRUCTION PROJECT 76281 DT001 Slope Repair Area Change The design does not account for the transition from the existing to the proposed top of bank.The transition from existing to proposed top of bank will be tapered to provide a smooth transition into and out of the slope repair areas as shown on sheet no. CG502-1. The service access road shall be constructed/maintained no closer than 5 feet from the edge of the proposed top of bank as shown on sheet no. CG502-2&3. Tree removal may be necessary to properly construct the service access road. DT006 Concrete, Debris and Duct Bank Issues Item 1. Upon excavation, concrete was discovered between the 96" and 114" pipes at the proposed location of Manhole SS11 in Area 5. Some concrete shall be removed to allow for proper excavation down to the required depth and to properly remove the 48" pipe that connects into the 114" pipe. The remaining concrete will be used to help support proposed Manhole SS11. The Contractor shall test the concrete to ensure its structural integrity. If structurally sound, the Contractor shall dowel into the concrete and pour the manhole base around it. Item 2. Miss Dig discovered an electrical duct bank that ran directly through the proposed location of Manhole SD1 and SD2 in Area 1. In order to avoid damaging or rerouting the duct bank the Contractor chose to move the proposed location of Manhole SD1 and SD2 roughly 6 feet east. This location was the only option the Contractor had within the right-of-way. While installing the earth retention system the electrical duct bank shall remain supported at all times. The Contractor shall hand dig around duct bank. Item 3. The unmarked duct bank that was discovered during Miss Digs visit forced the Contractor to relocate Manhole SD1 and SD2 at the location of the 12 inch watermain. The watermain shall be rerouted to avoid the new proposed location of Manhole SD1 and SD2. Item 4. While excavating the Contractor encountered various debris slowing the earth retention installation process down. The Contractor shall provide all documentation of debris encountered along with impact costs associated with the debris encountered in Option 7 areas. DEBRIS DOES NOT INCLUDE SOIL ENCOUNTERED DURING EXCAVATION

*RECOVERY* Water Distribution System & Restroom Bldg Replacement - Pisgah National Forest, NC

Department of Agriculture, Forest Service | Published March 20, 2010
cpvs

*RECOVERY* ***** THIS NOTICE IS FOR INFORMATION PURPOSES ONLY ***** ***** PLEASE DO NOT RESPOND TO THIS NOTICE ***** The USDA - Forest Service intends to award a Firm Fixed price Contract for the following project: Located on the Pisgah National Forest in North Carolina, This project consists of the replacement of the existing extended aeration wastewater treatment plant, water distribution system and restroom building. The new treatment plant is a 15,000 GPD DUAL TRAIN tertiary treatment above ground unit. The new bath-house is an 8-unit block/brick veneered structure w/porches. The new water distribution system will consist of a 3" PVC watermain with HDPE branch lines ranging in size from 2" to 3/4" in dia. Incidental work includes clearing, erosion & sedimentation control and primary/secondary site electrical work. The solicitation for this project will be forthcoming. Please check back in the next few weeks for its release and all applicable requirements and related information. *********************************************************************** NO INFORMATION WILL BE DISCUSSED AT THIS TIME. PLEASE DO NOT CALL ON THIS PROJECT UNTIL THE SOLICITATION HAS BEEN RELEASED.

45--Water main Loop

Department of the Army, FedBid | Published March 27, 2012  -  Deadline April 6, 2012
cpvs

This is a combined synopsis/solicitation for commercial items prepared in accordance with the format in FAR Subpart 12.6, as supplemented with additional information included in this notice.The solicitation number is W9124212SMASE0008 and is issued as an invitation for bids (IFB), unless otherwise indicated herein.The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular FAC 2005-57. The associated North American Industrial Classification System (NAICS) code for this procurement is 326191 with a small business size standard of 500.00 employees.This requirement is a [ Small Business ] set-aside and only qualified offerors may submit bids.The solicitation pricing on www.FedBid.com will start on the date this solicitation is posted and will end on 2012-04-06 11:30:00.0 Eastern Time or as otherwise displayed at www.FedBid.com.FOB Destination shall be Gallup, NM 87301 The AIRNG - North Carolina 145 AW requires the following items, Purchase Description Determined by Line Item, to the following: LI 001, 6" PVC Watermain, 1900, LF; LI 002, 6" X 4" reducer, 1, EA; LI 003, 6" X 4" Tee, 1, EA; LI 004, 6" X 6" Tee, 6, EA; LI 005, 6" 45 Deg bend (Offsets Included), 21, EA; LI 006, 6" 90 Deg bend, 2, EA; LI 007, 6" Backflow, 1, EA; LI 008, 6" 22 Deg bend, 1, EA; LI 009, 4" PVC Watermain, 900, LF; LI 010, 4" 45 Deg Bend for Offsets, all mega, 12, EA; LI 011, 4" Gate valve & Box, 1, EA; LI 012, 6" Gate valve & Box (All Mega Lug), 10, EA; LI 013, 5" X 5'-0" Hydrant W/ Thrust Blocks 1 week L, 3, EA; LI 014, 4" X 4' Tee, 2, EA; LI 015, 4" Sleeve, 1, EA; LI 016, 4" 90 Deg Bend, 2, EA; Solicitation and Buy Attachments ***Question Submission: Interested offerors must submit any questions concerning the solicitation at the earliest time possible to enable the Buyer to respond. Questions must be submitted by using the 'Submit a Question' feature at www.fedbid.com. Questions not received within a reasonable time prior to close of the solicitation may not be considered.*** For this solicitation, AIRNG - North Carolina 145 AW intends to conduct an online competitive reverse auction to be facilitated by the third-party reverse auction provider, FedBid, Inc. FedBid has developed an online, anonymous, browser based application to conduct the reverse auction. An Offeror may submit a series of pricing bids, which descend in price during the specified period of time for the aforementioned reverse auction. AIRNG - North Carolina 145 AW is taking this action in an effort to improve both vendor access and awareness of requests and the agency's ability to gather multiple, competed, real-time bids.All responsible Offerors that respond to this solicitation MUST submit the pricing portion of their bid using the online exchange located at www.FedBid.com. There is no cost to register, review procurement data or make a bid on www.FedBid.com.Offerors that are not currently registered to use www.FedBid.com should proceed to www.FedBid.com to complete their free registration. Offerors that require special considerations or assistance may contact the FedBid Helpdesk at 877-9FEDBID (877-933-3243) or via email at clientservices@fedbid.com. Offerors may not artificially manipulate the price of a transaction on www.FedBid.com by any means. It is unacceptable to place bad faith bids, to use decoys in the www.FedBid.com process or to collude with the intent or effect of hampering the competitive www.FedBid.com process.Should offerors require additional clarification, notify the point of contact or FedBid at 877-9FEDBID (877-933-3243) or clientservices@fedbid.com.Use of FedBid: Buyers and Sellers agree to conduct this transaction through FedBid in compliance with the FedBid Terms of Use. Failure to comply with the below terms and conditions may result in offer being determined as non-responsive. New Equipment ONLY; NO remanufactured or "gray market" items. All items must be covered by the manufacturer's warranty. Bid MUST be good for 30 calendar days after close of Buy. Shipping must be free on board (FOB) destination CONUS (Continental U.S.), which means that the seller must deliver the goods on its conveyance at the destination specified by the buyer, and the seller is responsible for the cost of shipping and risk of loss prior to actual delivery at the specified destination. Offeror must be registered in the Central Contractor Registration (CCR) database before an award can be made to them. If the offeror is not registered in the CCR, it may do so through the CCR website at http://www.ccr.gov. The selected Offeror must comply with the following commercial item terms and conditions, which are incorporated herein by reference: FAR 52.212-1, Instructions to Offerors - Commercial Items, applies to this acquisition; FAR 52.212-3, Offeror Representations and Certifications - Commercial Items - the selected offeror must submit a completed copy of the listed representations and certifications; FAR 52.212-4, Contract Terms and Conditions - Commercial Items; FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes or Executive Orders-Commercial Items, paragraph (a) and the following clauses in paragraph (b): 52.222-21, 52.222-26, 52.222-35, 52.222-36, 52.222-37, 52.225-13, 52.232-34. The full text of the referenced FAR clauses may be accessed electronically at https://www.acquisition.gov/far/. Questions concerning this procurement may be submitted via email to thomas.kurtz.1@ang.af.mil no later than 48 hours prior to the closing date. In accordance with FAR 2.101, responses to this solicitation shall be evaluated based upon Best Value, and thus shall result in issuance of a delivery order to the schedule holder whose offer represents the greatest overall benefit to the Government. When determining Best Value, the Government may consider, but is not limited to, such factors as price, past performance, special features, trade-in considerations, probable life of item, warranty, maintenance, environment and energy efficiency, and delivery terms.
  • 1