Public tenders for watermain in Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergywatermainCzech Republic

WATERMAINS Sobčice

Obec Sobčice | Published May 25, 2015
cpvs

The contract is the construction of water supply system, which includes a built-up part of town Sobčice. Construction sites are located in the urban and undeveloped parts k. Ú. Sobčice and in k. U. Village Ostroměř (in the western part of the built and unbuilt). Sobčice water supply inlet connects with the proposed Rules of PE pipes with a diameter of 110 mm with a length of 1757 m at the end of the existing public water supply system in the village Ostroměř Starohorské street. In the village built Sobčice will range from plumbing pipes PE 90 and 110 mm with a length of 3204 m. The total length of gravitational water mains under Action Water Sobčice will be 4961 m. Designed water supply is gravity, pressure-operated existing natural water reservoir Ostroměř. Routes water ducts in the bituminous roads will be carried out mainly driven by longitudinal extrusions. The applicant shall submit an affidavit pursuant to § 68 par. 3 of the Act. Other conditions are specified in the tender documents.

WATERMAINS Sobčice

Obec Sobčice | Published April 21, 2015  -  Deadline July 31, 2016
cpvs
45200000

Construction vobodovu includes the entire village built Sobčice. The construction site is located in the urban and undeveloped parts of k. Ú. Sobčice and in k. Ú. Ostroměř village (in the western part of the built and unbuilt). Water supply Sobčice connects many of the proposed supply pipe PE of 110 mm diameter with a length of 1757 meters at the end of the existing public water supply in the village Ostroměř Starohorské street. The proposed water supply is gravity, pressure-operated existing natural vodojemem Ostroměř. Routes plumbing in bituminous roads will be carried out mainly driven podélnímý podlaky 1. Description of needs to be met by meeting procurement construction of a new water supply system will meet the needs of residents of the village Sobčice supply quality drinking water. 2. Description of the subject contract Construction vobodovu includes the entire village built Sobčice. The construction site is located in the urban and undeveloped parts of k. Ú. Sobčice and in k. Ú. Ostroměř village (in the western part of the built and unbuilt). Water supply Sobčice connects many of the proposed supply pipe PE of 110 mm diameter with a length of 1757 meters at the end of the existing public water supply in the village Ostroměř Starohorské street. The proposed water supply is gravity, pressure-operated existing natural vodojemem Ostroměř. Routes plumbing in bituminous roads will be carried out mainly driven podélnímý podlaky 3. Description of the relationship between the subject contract and the client's needs using the new water main sponsor will be able to satisfy the need obyvavatel village Sobčice on drinking water quality 4. Expected due date for a public contract Expected start of implementation is 01.08 .2015 and completion is July 31, 2016

Potštát - Lipno WATERMAINS

Město Potštát | Published January 12, 2017
cpvs

Potštát - Lipno WATERMAINS

Město Potštát | Published December 20, 2016
cpvs
45000000

WATERMAINS old saddle

Městys Stádlec | Published January 19, 2017
Winner
Jindřich Lachout
cpvs

WATERMAINS old saddle

Městys Stádlec | Published November 22, 2016
cpvs

Potštát - Lipno WATERMAINS

Město Potštát | Published July 1, 2016
cpvs
45000000

It is a new aqueduct in Lipná binding to water supply Potštát. Supply lines to Lipná will be connected to the existing discharge lines before the reservoir Kyžlířov and is guided along a sewer II / 441 to lipno. Detailed specification governs the construction project documentation and a sample contract, which are part of the tender documentation. 1) Description of requirements to be fulfilled by meeting public procurement: implementation of public procurement will ensure the needed supplies drinking water for the local part of the city Potštát - lipno. 2) A description of the subject contract: This is a new aqueduct in Lipná binding to water supply Potštát. Supply lines to Lipná will be connected to the existing discharge lines before the reservoir Kyžlířov and is guided along a sewer II / 441 to lipno. Detailed specification governs the construction project documentation and a sample contract, which are part of the tender documentation. 3) A description of the relationship between the subject contract and the client's needs: Currently in Lipná no water supply, and citizens solve water supply from private wells, often with poor yields during droughts and poor water quality. From hydrogeological terms in this locality a large incidence of carbonates which form mineral water with problematic use for drinking purposes. Implementation of the project "Potštát - Lipno WATERMAINS" will construct a new water supply and thereby ensure the supply of quality drinking water to households of citizens lipno. 4) Expected date of fulfillment of public contracts: 30. 6. 2017

MORAVANY-WATERMAINS Phase II

Obec Moravany | Published April 22, 2015
cpvs

The subject of the public contract is the construction of reservoirs 2x100 m3, including technological parts, and supply a range of waste LU - infiltration. The building is divided into these structures and technological parts: - SO 01 Supply lines - SO 02 Waste from LU - infiltration - SO 03 LSU Moravians - PS 03.01 LU Moravians - technology - PS 03.02 LU Moravians - Electrical section, internal wiring and transmission Data

WATERMAINS TRHOVÉ SVINY-Třebíčko-beechnuts

Město Trhové Sviny | Published September 30, 2016
cpvs

The contract construction work. It is the construction of a new water supply for settlements Třebíčko and Bukvice that are held as part of the town Trhové Sviny. Both locations have their local water source and water supply. Divorces in municipalities are already in PE (Bukvice DN 50-90, 50-63 Třebíčko DN). In terms of quality and yield but sources do not meet the required parameters (in Třebíčko is only a shallow receiving notch). Repeated water shortages are solved by bringing mobile tankers. To supply both locations there is a connection to central water supply in Trhové Sviny. Divorces cities expire at Borovanský buildings along the road. The pressure at the considered connection is 3,9 bar (according to the statement of the operator).

WATERMAINS Březenice and bustles

Město Choceň | Published April 29, 2016
cpvs

Building contracts will be building water supply, ensuring the supply of drinking water. The village will be built water supply of plastic pipes and will be divided into several water mains. The new water supply system will be connected to group water Mostek in the valve shaft A.Ş. u čp.12 in breznice or on an existing stretch of distribution water mains owned VAK Jablonne nad Orlici, as the čp.12 as U and the Municipal House. Second place will be connected at house no. 18 in the village abounds. Water supply systems are designed in dimensions d 90 / d 50 5.4 / 3.0.

WATERMAINS Březenice and bustles

Město Choceň | Published February 11, 2016
cpvs

Building contracts will be building water supply, ensuring the supply of drinking water. The village will be built water supply of plastic pipes and will be divided into several water mains. The new water supply system will be connected to group water Mostek in the valve shaft A.Ş. u čp.12 in breznice or on an existing stretch of distribution water mains owned VAK Jablonne nad Orlici, as the čp.12 as U and the Municipal House. Second place will be connected at house no. 18 in the village abounds. Water supply systems are designed in dimensions d 90 / d 50 5.4 / 3.0. The applicant shall submit an affidavit pursuant to § 68 par. 3 of the Act. Other conditions are specified in the tender documents.

Bystřička tap connections to the watermains

Obec Bystřička | Published June 12, 2015
cpvs

Due to the low capacity of the existing local water sources is proposed municipal water supply connections to the watermains. Join to enable the development of construction in the area, which is still limited by the existing water supply. The project is located on the northeastern outskirts of built-up area of ​​the village Bystřička on plots number st. 504, 505/1, 752/3 and 504 in the cadastral Bystřička

Hermanova Hut - connection to watermains Silver

Obec Heřmanova Huť | Published July 9, 2014
cpvs

Procured the construction of reservoirs 2 x 150 m3 and the water supply conduit from the connecting point to the reservoirs and ponds to Heřmanova Forges. Construction supply water mains in the length of 0,5 km, stock water pipeline in the length of 3 km, the stock supply system for the settlement of island in the length of 0.6 km.

"GROUP WATERMAINS Trsice - Trsice, VACANOVICE, LIPŇANY, Hostkovice, Přestavlky Zákřov"

Obec Tršice | Published June 26, 2015
cpvs
45000000

The procedure concerns the selection of the general contractor for the purpose of water main drinking water supply. Estimated water demand is about 88.0 m3 / day). The total length of the supply mains is about 7091 meters. The total length of the distribution network in the municipalities is about 5164 meters. The total length of taps in a public space is about 2377 meters. Construction objects: SO SO Series 01 Supply 02 Network Timing municipalities SO 03 ATS Zákřov Reason effectiveness: the need to build the village's water supply system for the purpose of supplying the population with drinking water. It is new. The place of fulfillment is the municipality Tršice, Vacanovice, Lipňany, Hostkovice, Přestavlky, Zákřov. Thanks to the construction of water supply system will improve the quality of housing for the local population as well as the positive impacts on the environment designed site.

TENDER FOR processors of project documentation and ensuring the author's supervision for the project: "GROUP WATERMAINS Hořický"

Vodohospodářská a obchodní společnost, a.s. | Published July 28, 2016
cpvs

Processing of project documentation "group water Hořický, splitting the building A - renovation e modernization of the Central Libonice to the max. Output 15 l / s + comprehensive system management and data transfer, as well as the construction of B - booster pumping station on the premises of the Central Březovice, new connections CC Březovice to the accumulation of silt, a new water supply connections to piped water Boháňka Doubrava, comprehensive system management and data transfer.

TENDER FOR processors of project documentation and ensuring the author's supervision for the project: "GROUP WATERMAINS Hořický"

Vodohospodářská a obchodní společnost, a.s. | Published March 22, 2016
cpvs
71200000

Project documentation for zoning decision including the provision of engineering activities, which will be specified in the tender documents. Documentation for building permit incl. provision of engineering services, leading to a final building permit, engineering activities will be specified in detail in the specifications. Preparation of documentation to enter and carry out the work in accordance with applicable legislation and ensure enforcement supervision during project implementation. Description needs to be the fulfillment of public contracts fulfilled: Location Hořičky is struggling with insufficient drinking water, in some cases with insufficient drinking water quality. The goal is to find solutions Hořice supply of quality drinking water, ie the possibility of linking water supply, leaving small local sources (Jeřice, Doubrava) and simultaneously create conditions for future supplies of other consumption areas (village Podhorní Újezd, Vojice, group water Good Water). Description of the subject of public contract set out in paragraph II.4 of this announcement. Description of the relationship between the subject contract and the client's needs: Subject of public procurement provide the necessary permits for the construction of water supply in the area HOŘICKÉ and will provide documentation for selection of contractor and ensure supervision over the implementation of the contract itself, thereby fulfilling the client's needs. Expected date of fulfillment of public contract will be terminated after the implementation of construction, to completion of the author's supervision, the assumption 12/2018, the term is not dependent on obtaining approval and funding

TENDER FOR processors PROJEKTOKVÉ documentation and author's supervision for the project: GROUP WATERMAINS JIČÍN - SPA BĚLOHRAD

Vodohospodářská a obchodní společnost, a.s. | Published March 22, 2016
cpvs
71200000

Project documentation for zoning decision including the provision of engineering services. Specific requirements of the client on project scope will be defined in the tender documentation. Further development of documentation for building permit incl. provision of engineering services, leading to a final building permit, engineering activities will be specified in the tender conditions. Preparation of documentation to enter and carry out the work in accordance with applicable legislation and ensure enforcement supervision during project implementation. Description needs to be the fulfillment of public contracts fulfilled: Location is faced with the problem of secondary increased iron content of water, which are due to its aggressiveness eroded surfaces, unprotected iron pipes in the distribution network Jicin. The situation is currently solved dosage of inhibitor to decrease the iron concentration in all parts of the network below 0.2 mg / l. However, it is necessary to look for alternative solutions and dosing exit, which wants to sponsor activities, projection and implementation of the work itself to achieve. Description of the subject of public contract set out in paragraph II.4 of this announcement. Description of the relationship between the subject contract and the client's needs: The subject of the tender is the selection of a supplier of design work, which suggests a technical solution to fix the problem of water contamination by iron. Current solutions to reduce the iron content in drinking water is a long unbearable permit hygienist this dosage has been extended several times and it is necessary to look for alternative solutions to decrease or eliminate the concentration of iron in the drinking water. Expected date of fulfillment of public contract will be terminated after the implementation of construction, to completion of the author's supervision, the assumption 12/2018, the term is, however, dependent on the acquisition, approval of the subsidy from OPE.

Improving the quality of drinking water for the watermains High Toll, project number: CZ.1.02/1.2.00/12.14935

Vodovody a kanalizace Vysoké Mýto, s.r.o. | Published May 12, 2014
cpvs

The subject of the public contract is to use a new water source, the collected borehole LO 15/4, for the purpose of improving the quality of drinking water supplied to the water supply system high toll. Transport of water from a new exploration well LO 15/4 water pipe from the well to the cadastral territory of Hell, an object existing pumping station in HRUŠOV. There is calculated with the possible connection of the water pumping station in Hell. Supplementing existing technology and electrical pumping station Hrušová. It is a complementary outfit new pumps, piping and valves for connecting the discharge into the existing system. The subject of the public contract as well as other works and activities such as ancillary and other costs will be specified in the tender documents. The estimated value of procurement: 20100000, - CZK without VAT. Reserve to cover unforeseen events is: 1680845, - CZK without VAT Drawing on the above provision is only possible in cases where it is an objective, correct and unforeseen costs arising on the part of the client, required for execution of work and thus to the objectives and project parameters.

Improving the quality of drinking water for the watermains High Toll, project number: CZ.1.02/1.2.00/12.14935

Vodovody a kanalizace Vysoké Mýto, s.r.o. | Published February 6, 2014
cpvs

The subject of the public contract is to use a new water source, the collected borehole LO 15/4, for the purpose of improving the quality of drinking water supplied to the water supply system high toll. Transport of water from a new exploration well LO 15/4 water pipe from the well in the cadastral territory of Hell, an object existing pumping station in HRUŠOV. There is calculated with the possible connection of the water pumping station in Hell. Supplementing existing technology and electrical pumping station Hrušová. It is a complementary outfit new pumps, piping and valves for connecting the discharge into the existing system. The subject of the public contract as well as other works and activities such as ancillary and other costs will be specified in the tender documents. The estimated value of procurement: 20100000, - CZK without VAT. Reserve to cover unforeseen events is: 1680845, - CZK without VAT Drawing on the above provision is only possible in cases where it is an objective, correct and unforeseen costs arising on the part of the client, required for execution of work and thus to the objectives and project parameters. Time of delivery and acceptance of the site within 5 working days of a written request from the client. Date of commencement of construction work within 10 calendar days from the date of delivery and acceptance of procedurally site between the purchaser and the supplier. The required completion date, not later than 17 months from procedurally delivery and acceptance of site between the contracting authority and the contractor, which will occur within 5 working days of a written request from the client. Tour of the place of performance will be held on December 30, 2013 at 10:00 hours, participants will meet at the future site of the public contract - at a gas station Hrušová (Hrušová pumping station is located next to the village Tisova Hrušová direction). Then all participants will continue to tour together on any other place of performance of the contract. The contractor is bound to be all the time filling insured against damage caused by its activities in the amount of 40 000 000, - CZK. Closer in ZD. Reason of an appeal FORM NOTICE No. 1 was the deadline for submission of proposals - DUE TO ADDITIONAL INFORMATION ADMINISTRATION has changed the submission deadline. ADDITIONAL details download No. 1 is published in full on the profile AUTHORITY. This additional information relates it presupposes the professional qualification of the permissions to perform mining activities pursuant to Act No. 61/1988 Coll. on mining activities, explosives and state mining administration, as amended. Sponsor this additional information number 1 explains its request for permission to perform mining activities subject to action under § 3. a) - i) of Act No. 61/1988 Coll., on mining activities, explosives and state mining administration, as amended. As part of the public contract is necessary to have the above permissions to perform mining activities in accordance with § 3. f) Act No. 61/1988 Coll., on mining activities, explosives and state mining administration, as amended (-drilling wells with a length of over 30 m for purposes other than for activities listed in § 2 and 3). Furthermore, this additional note No 1 is to specify pipe material discharge line. Reason of an appeal FORM NOTICE No. 2 is extending the deadline for submission of tenders - for reasons made after there is a change details download the submission deadline. ADDITIONAL details download No. 3 is published in full on the profile AUTHORITY. That additional information with the inventory of the works, supplies and services with bill of quantities.

Improving the quality of drinking water for the watermains High Toll, project number: CZ.1.02/1.2.00/12.14935

Vodovody a kanalizace Vysoké Mýto, s.r.o. | Published November 18, 2013
cpvs
45232152

The subject of the public contract is to use a new water source, the collected borehole LO 15/4, for the purpose of improving the quality of drinking water supplied to the water supply system high toll. Transport of water from a new exploration well LO 15/4 water pipe from the well in the cadastral territory of Hell, an object existing pumping station in HRUŠOV. There is calculated with the possible connection of the water pumping station in Hell. Supplementing existing technology and electrical pumping station Hrušová. It is a complementary outfit new pumps, piping and valves for connecting the discharge into the existing system. The subject of the public contract as well as other works and activities such as ancillary and other costs will be specified in the tender documents. Estimated value of contracts: 20100000, - CZK without VAT. Reserve to cover unforeseen events is: 1680845, - CZK without VAT Drawing on the above provision is only possible in cases where it is an objective, correct and unforeseen costs arising on the part of the client, required for execution of work and thus to the objectives and project parameters. Justification effectiveness of public contracts for the purposes of the preliminary announcement of the contracting authority under § 1 of the Decree No. 232/2012 Coll. a) Description of requirements to be met by meeting procurement: objectives and needs of the client is to ensure supply of quality drinking water in the given area. Public procurement will ensure good quality drinking water supply needs of group water high toll. New resource, now led by only exploration well (LO 15/4), shows significantly better values ​​of indicators of quality of drinking water (the water with "water babies"). Substantial improvements in the quality of drinking water in water supply network group water ensures high-quality drinking water in spotřebišti, which will primarily benefit the health of citizens. The implementation of public procurement in the future will not be compromised hassle free supply of drinking water residents. b) Description of the subject contract: The subject of the public contract is to use a new water source, the collected borehole LO 15/4, for the purpose of improving the quality of drinking water supplied to the water supply system high toll. Transport of water from a new exploration well LO 15/4 water pipe from the well in the cadastral territory of Hell, an object existing pumping station in HRUŠOV. There is calculated with the possible connection of the water pumping station in Hell. Supplementing existing technology and electrical pumping station Hrušová. It is a complementary outfit new pumps, piping and valves for connecting the discharge into the existing system. c) Description of the relationship between the subject of the contract and the client's needs: Object of the contract is directly linked to the needs of the contracting authority and the duty of ensuring good quality drinking water for residents of group water high toll. Implementation of the public contract fully contribute to the objectives of the contracting authority, will smooth delivery of drinking water to the area solved. The implementation will increase the operational network security and supply of drinking water in this region. d) Expected date of fulfillment of public contracts: time delivery and acceptance of the site within 5 working days of a written request from the client. Date of commencement of construction work within 10 calendar days from the date of delivery and acceptance of procedurally site between the purchaser and the supplier. Sponsor assumes begin work March 1, 2014 and July 31, 2015 to complete the work. Justification effectiveness VZ according to § 86, paragraph 2 of the PPA is contained in Section II.8 of this
  • 1