Call +44 800 9755 164

Public tenders for energy in Gloucester United Kingdom

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Water and Sediment Analysis

Tidal Lagoon (Swansea Bay) PLC | Published December 4, 2015
Winner
Excal Limited
cpvs

Swansea Bay Tidal Lagoon will be a vibrant marine park and energy generating facility. The world’s first man-made energy-generating tidal lagoon, with a 320MW installed capacity and 14 hours of reliable generation every day. Tidal Lagoon Swansea Bay, require information on the quality of the water that will pass through the turbines, specifically information on the water chemistry, water quality and details of the suspended sediments during and after sea-floor scouring has taken place. TLSB have previously carried out some site investigations and have several borehole samples stored. The work required includes analysis of these samples for: • Particle Sieve Analysis • Mineral Composition by Whole-Rock XRD analysis • SEM Examination Additional water sampling will be required as part of the services, followed by analysis of suspended particles as listed above and chemical analysis of these samples including: • conductivity • pH • O2 (dissolved), Ca2+, Mg+, Mg+, HCO3+, Na+, K+, Cl-, NO3-, SO4- Should you wish to be considered for pre-qualification, please ensure that you are registered at http://www.tidallagoonswanseabay.com/edebate/registration/141/. You will also need to register your interest in this particular contract package via the Sell2Wales website and upload capability statements (maximum four sides of A4 paper) in response to the following: • How would you maximise utilizing local employment and supply chain content in your works? • How would you deliver the contract? Would you carry out all of the works yourself directly, sub-contract out elements, or approach as a consortium with partners? • Explain why you believe you would be suitable as a Tier 1 Contractor and what innovations and expertise you could bring to this contract package NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.uk/Search/Search_Switch.aspx?ID=29681. NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.uk/Search/Search_Switch.aspx?ID=29681

Lagoon Infrastructure Maintenance

Tidal Lagoon (Swansea Bay) PLC | Published July 1, 2015
cpvs

Swansea Bay Tidal Lagoon will be a vibrant marine park and energy generating facility. The world’s first man-made energy-generating tidal lagoon, with a 320MW installed capacity and 14 hours of reliable generation every day. The maintenance of the lagoon infrastructure is expected to be delivered by a single principal (Tier 1) contractor with an emphasis on local employment and supply chain. The package includes: • Maintenance of the turbine / sluice structure • Bund wall integrity including repairs • Maintenance of the “mariculture” park • Maintenance of navigational safety equipment • Lagoon monitoring and maintenance dredging • Interface with other contractors, significantly with power generation and turbine maintenance contractor The “Lagoon Infrastructure Maintenance” Contractor will deliver the contract in a way that achieves the goals of the Employer and within environmental statements. The Contractor will also be capable of reacting to operational risks including the ability to provide both planned and unplanned maintenance. The works is anticipated to include strategic input and development of the services under a bespoke form of contract. Procurement will be through a competitive, two-stage (pre-qualification and invitation to tender) process in order to select a preferred bidder prior to final contract negotiation. Should you wish to be considered for pre-qualification, please ensure that you are registered at http://www.tidallagoonswanseabay.com/edebate/registration/141/. You will also need to register your interest in this particular contract package via the Sell2Wales website and upload capability statements (maximum four sides of A4 paper) in response to the following: • How would you maximise utilizing local employment and supply chain content in your works? • How would you deliver the contract? Would you carry out all of the works yourself directly, sub-contract out elements, or approach as a consortium with partners? • Explain why you believe you would be suitable as a Tier 1 Contractor and what innovations and expertise you could bring to this contract package

Water Quality and Sediment Analysis

Tidal Lagoon (Swansea Bay) PLC | Published July 2, 2015
cpvs

Swansea Bay Tidal Lagoon will be a vibrant marine park and energy generating facility. The world’s first man-made energy-generating tidal lagoon, with a 320MW installed capacity and 14 hours of reliable generation every day. Tidal Lagoon Swansea Bay, require information on the quality of the water that will pass through the turbines, specifically information on the water chemistry, water quality and details of the suspended sediments during and after sea-floor scouring has taken place. TLSB have previously carried out some site investigations and have several borehole samples stored. The work required includes analysis of these samples for: • Particle Sieve Analysis • Mineral Composition by Whole-Rock XRD analysis • SEM Examination Additional water sampling will be required as part of the services, followed by analysis of suspended particles as listed above and chemical analysis of these samples including: • conductivity • pH • O2 (dissolved), Ca2+, Mg+, Mg+, HCO3+, Na+, K+, Cl-, NO3-, SO4- Should you wish to be considered for pre-qualification, please ensure that you are registered at http://www.tidallagoonswanseabay.com/edebate/registration/141/. You will also need to register your interest in this particular contract package via the Sell2Wales website and upload capability statements (maximum four sides of A4 paper) in response to the following: • How would you maximise utilizing local employment and supply chain content in your works? • How would you deliver the contract? Would you carry out all of the works yourself directly, sub-contract out elements, or approach as a consortium with partners? • Explain why you believe you would be suitable as a Tier 1 Contractor and what innovations and expertise you could bring to this contract package NOTE: To register your interest in this notice and obtain any additional information please visit the Sell2Wales Web Site at http://www.sell2wales.gov.uk/Search/Search_Switch.aspx?ID=29681.

General Facilities Management Services

Tidal Lagoon (Swansea Bay) PLC | Published July 1, 2015
cpvs

Swansea Bay Tidal Lagoon will be a vibrant marine park and energy generating facility. The world’s first man-made energy-generating tidal lagoon, with a 320MW installed capacity and 14 hours of reliable generation every day. The day to day operation of the non-power generation aspects of the lagoon is expected to be delivered by a single principal (Tier 1) contractor with an emphasis on local employment and supply chain. The lagoon aims to increase community, tourism and opportunities in sports, recreation, education, arts and culture. As a result, a significant proportion of the delivery team will be in contact with the public. The package includes the following facilities services and operational support: • Security • Cleaning • Waste disposal • Transport • Public access control • Interface with other contractors, significantly with power generation operations and maintenance contractor The “General Facilities Management Services” Contractor will deliver the contract in a way that achieves the goals of the Employer. The Contractor will also be capable of reacting to operational risks including the ability to provide both planned and unplanned operational support. The works is anticipated to include strategic input and development of the services under a bespoke form of contract. Procurement will be through a competitive two-stage pre-qualification and formal invitation to tender processes in order to select a preferred bidder prior to final contract negotiation. Should you wish to be considered for pre-qualification, please ensure that you are registered at http://www.tidallagoonswanseabay.com/edebate/registration/141/. You will also need to register your interest in this particular contract package via the Sell2Wales website and upload capability statements (maximum four sides of A4 paper) in response to the following: • How would you maximise utilizing local employment and supply chain content in your works? • How would you deliver the contract? Would you carry out all of the works yourself directly, sub-contract out elements, or approach as a consortium with partners? • Explain why you believe you would be suitable as a Tier 1 Contractor and what innovations and expertise you could bring to this contract package

Public Realm Infrastructure Maintenance

Tidal Lagoon (Swansea Bay) PLC | Published July 1, 2015
cpvs

Swansea Bay Tidal Lagoon will be a vibrant marine park and energy generating facility. The world’s first man-made energy-generating tidal lagoon, with a 320MW installed capacity and 14 hours of reliable generation every day. The maintenance of the public realm infrastructure is expected to be delivered by a single principal (Tier 1) contractor with an emphasis on local employment and supply chain. The lagoon aims to increase community, tourism and opportunities in sports, recreation, education, arts and culture. As a result, a significant proportion of the delivery team will be in contact with the public. The package includes: • Offshore buildings maintenance • Onshore buildings maintenance • HVAC & building services equipment maintenance (not related to the turbine power generating equipment) • Roads, car park, landscaping & lighting maintenance • Potable, foul and surface water system maintenance • Maintenance of 11kV supplies • IT & telecoms maintenance • Access and lifting equipment maintenance and statutory inspection • HSE & emergency equipment maintenance • Research laboratory maintenance • Interface with other contractors, significantly with power generation and turbine maintenance contractor The “Public Realm Infrastructure Maintenance” Contractor will deliver the contract in a way that achieves the goals of the Employer. The Contractor will also be capable of reacting to operational risks including the ability to provide both planned and unplanned maintenance. The works is anticipated to include strategic input and development of the services under a bespoke form of contract. Procurement will be through a competitive two-stage pre-qualification and formal invitation to tender processes in order to select a preferred bidder prior to final contract negotiation. Should you wish to be considered for pre-qualification, please ensure that you are registered at http://www.tidallagoonswanseabay.com/edebate/registration/141/. You will also need to register your interest in this particular contract package via the Sell2Wales website and upload capability statements (maximum four sides of A4 paper) in response to the following: • How would you maximise utilizing local employment and supply chain content in your works? • How would you deliver the contract? Would you carry out all of the works yourself directly, sub-contract out elements, or approach as a consortium with partners? • Explain why you believe you would be suitable as a Tier 1 Contractor and what innovations and expertise you could bring to this contract package
  • 1