Call +44 800 9755 164

Public tenders for energy in Blackpool United Kingdom

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Lancashire Energy Headquarters — Blackpool Enterprise Zone

Blackpool and The Fylde College | Published April 7, 2016
Winner
Bardsley Construction Ltd
cpvs
45214000, 45214500

B&FC is awarding the tender for the Main Contractor role at the new ‘Lancashire Energy Headquarters’, (hereby referred to as the Energy HQ), including the associated site preparation, infrastructure and landscaping.

Lancashire Energy Headquarters — Blackpool Enterprise Zone.

Blackpool and The Fylde College | Published November 21, 2015  -  Deadline December 21, 2015
cpvs
45214000, 45214500

B&FC is conducting a pre-qualification process to select parties to tender for the Main Contractor role at the new ‘Lancashire Energy Headquarters’, (hereby referred to as the Energy HQ), including the associated site preparation, infrastructure and landscaping.

Lancashire Energy Headquarters — Blackpool Enterprise Zone.

Blackpool and The Fylde College | Published November 21, 2015  -  Deadline December 18, 2015
cpvs
45214000, 45214500

B&FC is conducting a pre-qualification process to select parties to tender for the Main Contractor role at the new ‘Lancashire Energy Headquarters’, (hereby referred to as the Energy HQ), including the associated site preparation, infrastructure and landscaping.

Lancashire Energy Headquarters — Energy HQ.

Blackpool and The Fylde College | Published February 25, 2015  -  Deadline March 23, 2015
cpvs
45214300, 45214620, 45214500

Introduction to the works The works are located on a brownfield site (Car Parking), off Yeadon Way, Blackpool, UK. The site is bound by car parking to the North, Yeadon Way public highway to the East, car parking, petrol filling station, restaurant and hotel to the South and Railway Line to the West. The Works will encompass all necessary site preparation, infrastructure and construction of a new build Energy Headquarters (EHQ) including the associated external works, hard and soft landscaping. Construction operations adjacent to a live railway will be subject to strict protocol of approvals from, and liaison with, Network Rail. The new build EHQ building will provide the 1st phase of a state-of-the-art training facility for a comprehensive suite of courses to meet the needs of employers and their supply chains working in the growing energy sector. The building will be formed via a double height space with curved roof to the rear and 2 storey space with flat roof to the front. The building will be of steel frame construction on a piled foundation solution with a ground floor concrete slab. The external envelope will be a combination of blockwork and SFS solution with a composite aluminium rain-screen panel for the external cladding alongside curtain walling/glazing. The curved roof will be aluminium standing seam with the flat roof as a composite single ply roof system. The workshops under the curved roof element will accommodate specialist high skills practical training for the Renewables and Oil/Gas/Wind sectors. The 2 storey element to the front will accommodate teaching classrooms, staff and administration facilities, ancillary spaces, a kitchen + supporting spaces, a double height refectory and a double height atrium. Mechanical and Electrical installations will be in keeping with typical workshop accommodation and specialist extract systems, radiant panels and high bay lighting. Low Zero Carbon Technologies will be required to meet the building performance standards and will include (but are not limited to) Photovoltaics, Solar thermal and a Wind Turbine. The building will be required to achieve BREEAM Excellent under BREEAM 2014, and will require robust permeability details to the façade.

Lancashire Energy Headquarters — Energy HQ.

Blackpool and The Fylde College | Published February 25, 2015  -  Deadline March 20, 2015
cpvs
45214300, 45214620, 45214500

Introduction to the works The works are located on a brownfield site (Car Parking), off Yeadon Way, Blackpool, UK. The site is bound by car parking to the North, Yeadon Way public highway to the East, car parking, petrol filling station, restaurant and hotel to the South and Railway Line to the West. The Works will encompass all necessary site preparation, infrastructure and construction of a new build Energy Headquarters (EHQ) including the associated external works, hard and soft landscaping. Construction operations adjacent to a live railway will be subject to strict protocol of approvals from, and liaison with, Network Rail. The new build EHQ building will provide the 1st phase of a state-of-the-art training facility for a comprehensive suite of courses to meet the needs of employers and their supply chains working in the growing energy sector. The building will be formed via a double height space with curved roof to the rear and 2 storey space with flat roof to the front. The building will be of steel frame construction on a piled foundation solution with a ground floor concrete slab. The external envelope will be a combination of blockwork and SFS solution with a composite aluminium rain-screen panel for the external cladding alongside curtain walling/glazing. The curved roof will be aluminium standing seam with the flat roof as a composite single ply roof system. The workshops under the curved roof element will accommodate specialist high skills practical training for the Renewables and Oil/Gas/Wind sectors. The 2 storey element to the front will accommodate teaching classrooms, staff and administration facilities, ancillary spaces, a kitchen + supporting spaces, a double height refectory and a double height atrium. Mechanical and Electrical installations will be in keeping with typical workshop accommodation and specialist extract systems, radiant panels and high bay lighting. Low Zero Carbon Technologies will be required to meet the building performance standards and will include (but are not limited to) Photovoltaics, Solar thermal and a Wind Turbine. The building will be required to achieve BREEAM Excellent under BREEAM 2014, and will require robust permeability details to the façade.

Industry specific software package

Blackpool and The Fylde College | Published December 16, 2016  -  Deadline January 16, 2017
cpvs
48100000

The College requires a fully Immersive Energy Simulator Suite aiming to cater for curriculum from level 2 up to level 6, allowing for the provision of education, training and assessment in accordance with FD Nuclear Engineering and BEng (hons) Nuclear Engineering requirements. See Additional Information in VI.3 for more details.

The College requires a fully Immersive Energy Simulator Suite aiming to cater for curriculum from level 2 up to level 6, allowing for the provision of education, training and assessment in accordance with FD Nuclear Engineering and BEng (hons) Nuclear Engineering requirements.

Trident Utilities Limited Public Body Procurement Framework

Trident Utilities Ltd / Grand Union Housing Group | Published April 28, 2016
Winner
Wingas
cpvs
71314000, 71314200, 71314300, 09300000, 65400000, 31121300, 38551000, 09000000

This is a framework designed for use by public body organisations to enable them to have fully EU and OJEU regulated process for the procurement of electricity and natural gas and associated energy supplier selection.

It is anticipated that the opportunity to procure electricity and gas through this framework arrangement will be taken up by a wide range of public sector organisations, during the initial term. It is not possible to specify exactly who will participate, due to the nature of the framework and the fluid nature of the potential participants however.

The framework consists of 8 separate lots, with potential energy suppliers having the opportunity to bid for all lots or for each separate lot on an individual basis.

Blackpool and The Fylde College - Nuclear Fission & Fusion Simulator

 | Published June 8, 2016
cpvs
34152000

Blackpool and The Fylde college is currently developing a newly validated nuclear engineering degree programme . This will be located in our new Energy Centre from September 2017. This will be a hardware and software solution. The software programme will be required to incorporate the use of a virtual simulated environment that relates to the nuclear industry. This will need to incorporate a virtual educational environment to demonstrate the processes of nuclear fission and fusion through energy supply to end users. Currently, the College in undertaking early market engagement to help determine the supply market for this specialist equipment and any potential supplier wishing to work with the College prior to formal tender will need to register using the details provided within this notice.

Trident Utilities Limited Public Body Procurement Framework.

Trident Utilities | Published January 29, 2016  -  Deadline February 29, 2016
cpvs
71314000, 71314200, 71314300, 09300000, 65400000, 31121300, 38551000, 09000000, 71314000, 71314200, 71314300, 09300000, 65400000, 31121300, 38551000, 09000000, 71314200, 71314300, 71314000, 09300000, 65400000, 31121300, 38551000, 09000000, 71314000, 71314200, 71314300, 09300000, 65400000, 31121300, 38551000, 09000000, 71314000, 71314200, 71314300, 09300000, 65400000, 31121300, 38551000, 09000000, 71314000, 71314200, 71314300, 65400000, 09000000, 09300000, 31121300, 38551000, 09000000, 09300000, 31121300, 38551000, 65400000, 71314000, 71314200, 71314300, 09000000, 09300000, 31121300, 38551000, 65400000, 71314000, 71314200, 71314300, 09000000, 09300000, 31121300, 38551000, 65400000, 71314200, 71314300, 71314000

This is a framework designed for use by public body organisations to enable them to have fully EU and OJEU regulated process for the procurement of electricity and natural gas and associated energy supplier selection.

It is anticipated that the opportunity to procure electricity and gas through this framework arrangement will be taken up by a wide range of public sector organisations, during the initial term. It is not possible to specify exactly who will participate, due to the nature of the framework and the fluid nature of the potential participants however.

The framework consists of 8 separate lots, with potential energy suppliers having the opportunity to bid for all lots or for each separate lot on an individual basis.

Note: to register your interest in this notice and obtain any additional information please visit the myTenders Web Site at http://www.myTenders.org/Search/Search_Switch.aspx?ID=162642

  • 1