Public tenders for energy in Lypnyazhka Ukraine

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyUkrainelypnyazhka

Gasoline A - 92 ENERGY (of scratch cards)

КУ "Дніпропетровська міська клінічна лікарня № 9 Дніпропетровької обласної ради" | Published September 16, 2016  -  Deadline September 26, 2016
cpvs

Gasoline A - 92 ENERGY (of scratch cards)

Legal Infrastructure for Energy Efficiency

 | Published February 20, 2015  -  Deadline February 20, 2016
cpvs

Legal Infrastructure for Private Sector Energy Efficiency Projects: Dnipropetrovsk
 
Dnipropetrovsk Municipal Energy Management Company (DMEMC) and the City of Dnipropetrovsk has received a loan from the European Bank for Reconstruction and Development (“EBRD”) and a grant from the Eastern Europe Energy Efficiency and Environment Partnership (“E5P”), and intend using the proceeds of the EBRD loan and the E5P grant to finance energy service companies (“ESCOs”) to implement energy efficiency measures in public buildings through energy performance contracts (“EnPC”).
 
The proposed project, which has a total estimated cost of EUR 20 million including VAT, will be implemented in several tranches and will require the procurement of the following works and services for municipal buildings:
 
  • Thermal insulation of external walls
  • Windows replacement
  • Thermal insulation of ceilings, of basement floors
  • Heat exchange stations upgrade/replacement
  • Water treatment plants
  • Expansion and safety devices, measurement and control system
  • Thermal insulation of heat distribution pipes
  • Thermal insulation of internal space heating pipes
  • Measures in space heating systems (e.g. rehabilitation of space heating system to allow individual control of the radiators)
  • Providing contractual guarantee for guaranteed savings achievement for 10 years from energy efficiency measures implementation and handover
  • necessary energy efficiency management.
 
Tendering for the first energy performance contract is ongoing. Tendering for the second pool of 45 buildings is expected to begin in March 2015.
 
With an aim to ensure ESCO guarantee for savings, it is expected that 20% of ESCO price for investments shall be deferred after the first heating season and shall be subject to successful verification of achieved savings.
 
The contract to be financed with the proceeds of the EBRD loan and the E5P grant will be subject to the EBRD Procurement Policies and Rules and will be open to firms from any country. The proceeds of the EBRD loan and the E5P grant will not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.
 
Interested suppliers and contractors should contact:
 
Mr. Alexander Gondar
Director of the Department of Industry, Business and Investment
Dnipropetrovsk City Council
49000, Dnepropetrovsk, Karl Marx lane
Tel/fax: +38 (056) 7450610
 
 
This notice refers to goods, works, services or consultancy services to be procured through open and competitive tendering for projects financed by the EBRD and the E5P. Potential tenderers desiring additional information on the procurement in question or the project in general should, unless indicated otherwise, contact the project agency and not the EBRD or the E5P.
 
 
 
 

Legal Infrastructure for Energy Efficiency Dnepropetrovsk

 | Published September 17, 2015  -  Deadline December 8, 2015
cpvs

Legal Infrastructure for Energy Efficiency in Dnepropetrovsk

THIS IS AN UPDATE OF THE ORIGINAL NOTICE. PLEASE NOTE AN ADDITIONAL EMAIL ADDRESS FOR THE EMPLOYER.

This Invitation for Tenders follows the General Procurement Notice for this project which was published on 18th October, 2013 in Procurement Notices on websites of European Bank for reconstruction and Development (“EBRD” or “Bank”) and updated on 20th February, 2015

(http://www.ebrd.com/work-with-us/procurement/p-pn-150220b.html)

 

Municipal enterprise of Dnipropetrovsk City Council “Dnepropetrovsk Municipal Energy Management Company”  (the “Employer”), has received a loan from EBRD and a grant from the Eastern Europe Energy Efficiency and Environmental Partnership (“E5P grant” or “the grant”), administered by the Bank, towards the cost of the Legal Infrastructure for Energy Efficiency in Dnepropetrovsk Project.

 

The Employer now invites sealed tenders from potential Contractors (“ESCOs”) for the following contract to be funded from the proceeds of the loan and E5P grant:

 

Lot 2:   “Energy Performance Contract on introduction of energy saving activities, thermal modernization of municipal buildings with guaranteed energy savings in the City of Dnipropetrovsk (reconstruction)”; Number of school and kindergarten buildings – 45

 

The objective of the tender is to implement energy efficiency improvement measures in 45 school buildings (LOT 2) in Dnepropetrovsk using the principle of Energy Performance Contracting subject to the following works and services for municipal authorities:

 

  • Thermal insulation of external walls
  • Windows replacement
  • Thermal insulation of ceilings, of basement floors
  • Heat exchange stations upgrade/replacement
  • Installation of flow regulators (hydraulic balancing of space heating system)
  • Installation of heat meters
  • Thermal insulation of internal heating pipes
  • Modernisation of internal heating systems (e.g. installation of individually controlled radiators with pre-setting etc.)
  • Replacement of incandescent indoor lights and adjoining street lights

 

A new model Energy Efficiency Contract (“EnPC”) would be used. The EnPC was developed as part of the preparation of the Bank’s Project.

 

Activities under the proposed EnPC will include:

  1. To design of energy efficiency measures,
  2. To implement energy efficiency measures,
  3. To provide necessary control and verification of savings
  4. To guarantee operational (energy) cost savings for repaying the projects’ works (efficiency investments) and services (operations and maintenance) in the period starting from energy efficiency measures implementation and handover to the end of 2026.

 

Tendering for EnPC(s) to be financed with the proceeds of a loan from the Bank is open to firms from all countries. The proceeds of the Bank’s loan will not be used for the purpose of any payment to persons or entities, or for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations.

 

Tender documents may be obtained electronically free of charge from the office at the address below. Upon request, the documents will be immediately sent electronically in PDF, MS Word or MS Excel formats.

 

A two stage tender procedure will be adopted and will proceed as follows:

 

(a)        the First Stage tender will consist of a technical proposal only, without any reference to prices. Following evaluation by the Employer of the First Stage tenders, the Employer will invite each tenderer who meets the qualification criteria and who has submitted a technically responsive tender to a clarification meeting. The proposals of all such tenderers will be reviewed at the meeting and all required amendments, additions, deletions and other adjustments will be noted and recorded in a Memorandum. Only qualified tenderers submitting a technically responsive and acceptable First Stage tender will be invited to submit a Second Stage tender.

 

(b)        the Second Stage tender will consist of an updated technical tender incorporating all changes required by the Employer as recorded in the Memorandum to the clarification meeting or as necessary to reflect any amendments to the tender documents issued subsequent to submission of the First Stage tender; and the commercial tender.

 

First Stage tenders must be delivered to the address below on or before 08.12.2015 at 14:00 (local time) and at 14:30 they will be opened in the presence of the tenderers’ representatives who wish to attend.

 

All Second Stage tenders must be accompanied by a Tender Security (guarantee of participation in tender) of UAH 260,000 or its equivalent in convertible currency at the exchange rate published by the National Bank of Ukraine on the date is issuance, and must be delivered to the address below on or before the time and date of the submission deadline specified in the Letter of Invitation to submit Second Stage tenders. At indicated time and date they will be opened in the presence of the tenderers’ representatives who wish to attend. Form of the security payment and all other details are specified in the Instructions to Tenderers and the Tender Data.

 

A pre-tender meeting will take place on 12.10.2015 at 12:00 at the below address. The attendance is highly recommended.

 

The Employer will organise the site visits from 13.10.2015 to 23.10.2015.

 

Prospective tenderers may obtain further information from, and inspect and acquire the tender documents at the following office:

 

 

Dnipropetrovsk City Council

75 Karl Marks Avenue

Room 520

49000, Dnipropetrovsk, Ukraine

 

Contact person: Mr Alexander Gondar

Director of the Department of Industry, Business and Investment

 

Tel: +380 506 353 987

 

Email: gondar@miac.dp.ua and gondar@dniprorada.gov.ua

(please send messages to both addresses)

 

 

Fuel scratch cards on Energy Diesel and fuel scratch cards for gasoline A-92 Energy nominal value of 10 liters, 15 liters, 20 liters.

КП "Вільногірський міський центр первинної медико-санітарної допомоги" Вільногірської міської ради Дніпропетровської області" | Published September 19, 2016  -  Deadline September 27, 2016
Winner
Паливні скретч-картки на бензин А-92 Energy номіналом 10 л ,15 л, 20 л
cpvs
09100000, 09100000

Postalnyk should provide customer refuel gasoline A-92 and diesel fuel Energy Energy on scratch cards, network stations located in m.Vilnohirsk Dnipropetrovsk region, refueling point for scratch cards must be located within 5 km of the location of the customer.

District Heating Energy Efficiency - P132741

 | Published March 15, 2016
Winner
FELA PLANUNGS AG
cpvs

Installation Of Individual Heating Stations In The City Of Kamyanets-podilskyi ICB Contract Award Notice Ukraine Project: P132741 - District Heating Energy Efficiency Bid/Contract Reference No: UDHEEP-KAM-ICB-03 Scope of Contract: Installation of Individual Heating Stations in theCity of Kamyanets-Podilskyi Duration of Contract: 18.00Month(s) Contract Signature Date: Evaluation Currency: UAH-Ukraine Hrivnya Awarded Bidder(s): Name: FELA PLANUNGS AG Address: Industriestrasse 4, CH-5432 Country: Switzerland Bid Price at Opening:EUR 1,759,564.80 Evaluated Bid Price: UAH38,064,410.81 Contract Price: UAH42,571,250.15 Evaluated Bidder(s): Name : HERZ Armaturen Ges.m.b.H. Address : Country: Austria Bid Price at Opening:EUR 1,706,729.60 Evaluated Bid Price: UAH40,488,044.26 Evaluated Bidder(s): Name : Brunata OOD Address : Country: Bulgaria Bid Price at Opening:EUR 1,918,855.56 Evaluated Bid Price: UAH48,678,655.73

Improving the energy efficiency of state-financed institutions of the City of Zhytomyr

 | Published May 5, 2015  -  Deadline May 5, 2016
cpvs

Improving the energy efficiency of state-financed institutions of the City of Zhytomyr
The Department of Capital Construction of Zhytomyr City Council is going to announce in the closest time the competitive bidding for the works defined by the Project "Improving the energy efficiency of state-financed institutions of the City of Zhytomyr".
The Department of Capital Construction of Zhytomyr City Council intends to use the proceeds from a loan provided by Nordic Environment Finance Corporation (NEFCO), funding from the city of Zhytomyr and grants funds from E5P[1] for the below works, goods and services, while Swedish International Development Cooperation Agency (Sida)  have provided funding for Technical Assistance support to make the implementation of the Project possible.
The Project which is being implemented is based on the decision No.564 of the Zhytomyr City Council dated 11 July, 2013 "About attraction of loan facility from NEFCO for the funding of investment project" "Improving the energy efficiency of state-financed institutions of the City of Zhytomyr" as revised the decision No.564  of the Zhytomyr City Council dated 4 April 2014 "About introduction of amendments to the decision No.614 of the Zhytomyr City Council" dated 7 February  2014 "About city funds for 2014".
In 2015 within the funds of the projects the contractors will be selected for implementation of works in total for about 109.2 mln. UAH (about 4.5 mln. EUR) for the following directions:
-      thermosanation (insulation of the walls, roofs and basement, replacement of windows and exterior doors with energy efficient ones) which includes equipment and materials;
-    installation of new individual heating substations and modernization of the existing ones, balancing and flushing of heating internal systems, insulation of pipes, installation of heat meter in the public buildings (which includes equipment and materials).
 
For more information please contact
The Department of Capital Construction of Zhytomyr City Council:
Ukraine, 10014, Zhytomyr, Liatoshynskoho str.,  15B.
Tel./fax: +38 (0412) 44-57-16
 


[1] The Eastern Europe Energy Efficiency and Environment Partnership - E5P is a Euro 90 million multi-donor fund managed by the EBRD designed to promote energy efficiency investments in Ukraine and other eastern European countries.
Contributors to E5P are the European Union, Sweden, Ukraine, United States, Denmark,
Norway, Finland, Poland, Estonia, Iceland, Latvia and Lithuania.
 
 

Ukraine Public Sector Energy Efficiency Framework: Project Support Unit - Implementation Consultant

 | Published November 25, 2015  -  Deadline January 5, 2016
cpvs

Assignment Description: The European Bank for Reconstruction and Development ("EBRD" or the "Bank") has made energy efficiency investments in the public building sector a priority. The Bank intends to support the Energy Performance Contracts ("EnPC") market development in Ukraine by testing and establishing the recently improved legislative framework for EnPC by implementing financing framework for energy efficiency in public buildings. The Bank is developing a Public Sector Energy Efficiency Financing Framework in Ukraine (the "Framework"), aiming to provide development support and debt finance to the EnPC projects which meet required commercial, technical and environmental standards, as well as to encourage and support private financing of the energy service companies ("ESCOs") in Ukraine. The EBRD intends to engage a consultancy firm (the "Consultant") to provide support to the Bank in launching an implementing of the Framework, as well as supporting participating cities to prepare and tender EnPCs and for development of guidelines and for application of newly adopted ESCO laws and by-laws (the "Consultancy Services"). The Consultant will be responsible for running the Project Support Unit ("PIU") to support each municipality participating in the Framework. The Consultancy Services will include a comprehensive support covering (i) business development and marketing; (ii) regulatory issues; (iii) capacity building and project support. The EBRD intends to select one Consultant and award to them a framework contract (“Framework Contract”). The Framework Contract will provide for the general scope of work, and will establish, in advance, fee rates for experts, contract terms, agreements and procedures that will govern individual assignments ("Assignments" or "Call-off Notices") to be issued under the Framework Contract each time when specific tasks are required to be undertaken by the Consultant. The Consultant will be required to undertake the following tasks: - Market the Framework and ensure that the widest range of stakeholders are informed about the Framework and its benefits, in order to ensure a prompt uptake of the financing and the related benefits; - Provide capacity building and training support to Ukrainian municipalities, developers, advisory firms, private ESCOs, and banks; - Ensure effective screening of projects to identify and support those that are technically and commercially viable and to screen out those projects which are not; - Support potential borrowers in identifying appropriate investment opportunities and developing proposals for financing under the Framework; - Ensure that borrowers proposing projects are, in all respects, compliant with national and applicable EU, environmental, health, safety and labour standards; - Prepare, support implementation, and provide monitoring and verification for up to ten EnPC projects, or up until the Framework is fully committed; - Establish an efficient tracking, monitoring and reporting system to ensure the availability of accurate data for the utilisation of the Framework. Consultancy Services Start Date and Duration: The Framework Contract is expected to start in May 2016 and has an estimated overall duration of 40 months. Cost Estimate for the Consultancy Services: EUR 4,000,000 (exclusive of VAT). The Consultant must determine whether any VAT would be chargeable on the services and the basis for that determination, without taking into consideration the special status of the Bank as an IFI and state this to the Bank in their response to the Invitation for Expressions of Interest. To the extent that a Consultant incurs input VAT on goods and services purchased in connection with the provision of services (e.g. VAT on airline ticket) which is not otherwise recoverable by the consultant from the local tax authority, the gross cost to the consultant of such expenses shall be treated as a reimbursable expense. Funding Source: It is anticipated that the Consultancy Services will be financed through the EBRD's donor funded Technical Cooperation Funds Programme. However, the Consultant selection and contracting will be subject to availability of funding from an appropriate donor. Eligibility: There are no eligibility restrictions. Consultant Profile: Corporate services are required. The Consultant will be a firm or a group of firms with previous project experience in international EnPC projects procurement and implementation, and in construction and energy modernisation works and services, preferably in the region (Eastern Europe (incl. Belarus, Moldova, Ukraine) and Caucasus). The Consultant’s team should include the following experts: - Project Manager with preferably 10 years of previous experience in municipal energy efficiency and IFI energy efficiency projects in EBRD countries of operation; - EnPC International Experts with preferably 10 years of previous experience in EnPC contracts implementation and ESCO market development; - IFI Procurement and Contract Specialist with preferably 10 years of previous experience in IFI municipal and corporate projects in EBRD countries of operation; - Financial Expert with preferably 10 years of previous experience in municipal finance in EBRD countries of operation; - Local Municipal Budget Expert with preferably 7 years of previous experience in municipal investment projects; - Local Legal Expert with preferably 7 years of previous experience in PPP, municipal finance, and energy efficiency projects; - Marketing and Capacity Building Expert with preferably 7 years of previous experience in marketing and capacity building projects for IFIs; - Local EnPC experts with preferably 5 years of previous experience in energy efficiency projects in buildings; Submission Requirements: In order to determine the capability and experience of consultants seeking to be shortlisted, the information submitted should include the following: - Company/group of firms' profile, organisation and staffing (max. 2-4 pages); - Details of previous project experience or similar assignments undertaken in the previous five years, including information on contract value, contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided (if different from duration) , main activities, objectives; - CVs of key experts who could be available to work on the Assignment detailing qualifications, experience in similar assignments, particularly preferably undertaken in the previous ten years, including information on contracting entity/client, project location/country, duration (mm/yy to mm/yy), experts months provided, assignment budget, main activities, objectives; - Completed Consultant Declaration Form and Contact Sheet, the template for which is available from the following web-link:http://www.ebrd.com/pages/workingwithus/procurement/notices/csu/contact_sheet.doc. The above information should not exceed 20 pages, excluding CVs and the Consultant Declaration Form and Contact Sheet. The complete expression of interest (including CVs and the Consultant Declaration Form and Contact Sheet) shall be one file (PDF or Word), not exceeding 4MB, to be uploaded to eSelection. The EBRD reserves right to reject applications of firms submitting more than one file. Only if the permissible file size is exceeded, the Consultant may split the expression of interest into further files. Expressions of Interest shall be submitted, in English, electronically through e-Selection, to reach the Bank not later than the closing date. Bank Contact Persons: Elena Kolodiy European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN Tel: + 44 20 7338 6765 E-mail: kolodiyo@ebrd.com (submissions should be sent through eSelection and NOT to this email address) Notes: 1. Following this invitation for expressions of interest, a shortlist of qualified firms will be formally invited to submit proposals. Consultant selection and contracting will be subject to the availability of funding. 2. As part of the Investment Framework, energy service companies (ESCOs) are envisaged to be selected by the Ukrainian public authorities for their energy efficiency projects, at the same time the current Consultancy Services require a local expertise that is likely to be provided by the local ESCOs. As participation of a given ESCO in both energy efficiency projects and in these Consultancy Services would constitute a conflict of interest, interested ESCOs should decide in which of the two projects they choose to participate. 3. Also, for reason that there are only a few energy efficiency specialists in the region in the required sector, in order not to restrict competition, the local experts can choose to participate in the proposals as subcontractors (rather than as consortium members). This, in accordance with section 5.5(b) of the EBRD Procurement Policies and Rules would allow the same consultant to participate in more than one tender – but only as subcontractors. 4.The evaluation criteria are as follows: - Consultant’s experience in international EnPC projects procurement and implementation - 30% - Calibre of Experts as listed in the Consultant Profile Section above - 40% - Experience of Consultant in construction and energy modernisation works and services, preferably in the region (Eastern Europe (incl. Belarus, Moldova, Ukraine) and Caucasus) - 30%

Project Consultant - Assistance with the implementation of the Ukraine Residential Energy Efficiency Finance Facility (UREEFF)

 | Published April 13, 2015  -  Deadline May 11, 2015
cpvs

Assignment Description: By consuming 32% of Ukraine’s total energy production, the residential sector is the second largest energy consumer. More than 80% of Ukraine’s multi-family apartment buildings have deteriorated to the extent that they constitute a risk to the lives and well-being of their inhabitants. According to estimates, technical energy saving potential is 50% of the actual baseline. Recent events have already affected the energy prices for industrial and residential consumers with serious implications on businesses’ competitiveness and households’ disposable income. The Ukrainian Government increased natural gas prices for the population by 50% in May 2014 and by a further 3.5 times as of April 2015, as agreed with the International Monetary Fund. With energy prices rising, an increasing number of people face difficulties paying their bills. Despite large potential, many residential energy efficiency ("EE") projects remain unfinanced and unimplemented as they are hampered by a number of market barriers such as inter-alia: inadequate public awareness of the benefits of EE projects and perceived technical and/or financial risk and insufficient capacity for evaluating specific EE projects among banks; significant regulatory barriers preventing commercial financing of residential EE, in particular up until recently the legislation did not provide for establishing of a legally viable homeowner client base; national banking regulations were extremely unfavourable towards home owners associations as borrowers and the secondary regulatory basis was insufficient for introduction of market-based financial instruments for EE; and last but not least, the existing social safety net for low income households still has a number of drawbacks which translates into the homeowners associations not being able to reach consensus among homeowners or having to proceed with some low-income families excluded from the refurbishment, meaning that the poor and vulnerable groups do not have equal opportunity to participate in the comprehensive renovation of their building. Some of the above barriers are being addressed by the EBRD (and by other IFIs) through extensive Policy Dialogue activities that have recently resulted in significant improvement in developing enabling conditions for investments. In particular, it is worthy to note that the Bank’s active engagement with the authorities in Ukraine over the past few years resulted in the adoption of regulations to support Ukraine’s transposition of the EU Directive on Energy Performance of Buildings. Following on the Policy Dialogue engagement, with a view to address the poor condition of the residential building stock and the rapidly increasing energy tariffs, the EBRD is envisaging a residential Sustainable Energy Financing Facility (‘Ukrainian Residential Energy Efficiency Financing Facility, ‘UREEFF’ or ‘the Facility’). By bundling technical assistance, funding and risk participation and financial incentives to end-users into a ‘one-stop-shop’ structure, UREEFF would be the first dedicated instrument to support investments in residential EE in the country. In line with the classic EBRD SEFF model, it is envisaged that the Bank would make available up to USD 100 million to qualifying Participating Financial Institutions (PFIs) in Ukraine (including new and existing clients of the Bank) for on-lending to eligible private sector sub-borrowers for sustainable energy investments in the residential sector. It is intended that the Facility will be structured along the Bulgarian REECL (www.reecl.org) and Moldovan MoREEFF (http://moreeff.info/en/) model to target private housing including multi-storey apartment buildings. Based on the preliminary discussions and understanding of the Ukrainian EE market and financial sector, as well as taking into account EBRD experience in residential sector in other countries, the following indicative incentive mechanisms are anticipated: Technical Assistance, that will facilitate transfer of skills to banks and sub-borrowers, awareness raising among wide group of stakeholders and demonstration of the financial benefits of rational energy utilisation; Investment Incentives, of up to 20% of the related sub-loan amount for individual sub-borrowers and up to 35% of the related sub-loan amount for housing collectives, depending on the nature and performance of sub-projects; Guarantees and risk sharing elements; The final structure, level and mechanism of incentives to be determined are subject to EBRD internal approvals and funding being made available by Donors (various funding applications are currently under consideration by bilateral and multilateral Donors). The EBRD now intends to engage a consulting company or consortium for five years to perform the role of Project Consultant (“PC”, the “Consultant”) to support the implementation and administration of UREEFF (the “Assignment”). The Consultant will maintain an operational base in Kiev and at least one regional front office in one of the oblast centres (to be determined), which will be equipped and staffed to provide all necessary facilities, services (secretarial support, interpretation, translation) throughout the duration of the Assignment. The Consultant is required to demonstrate good knowledge of the local market and the ability to cover wider geographical reach and mobilise experts quickly. The experts should be able to communicate effectively in the English and Ukrainian languages. Long-term experts shall spend minimum 75% of their time in Ukraine. Any home-based activities shall require justification. It is envisaged that at least 50% of expert input shall be provided by local experts who are professionally based and operating in Ukraine. The Consultant’s objective will be to assist in the preparation, successful implementation, and verification of eligible projects under UREEFF by providing the following services: Preparatory phase: to establish the Facility the PC will develop all technical operational tools, templates and forms; maintain and update the dedicated web-site; Implementation phase: further services will include marketing and general awareness raising; support with pipeline development; capacity building for PFIs and housing collectives; sub-projects preparation including energy audits, conceptual design of residential building-level projects, legal advice on housing regulations for Housing Associations/Condominiums and identification of optimal investment plans; administration and monitoring of the Facility and verification (desk-based and spot-checks) of correct implementation and confirmation of the correct level of incentives for which each sub-project qualifies, including general monitoring, reporting and verification activities for climate finance. Involvement of other consultants contracted by EBRD In order to facilitate the preparation of UREEFF, EBRD hired a Project Preparation Consultant who has already defined the technical eligibility criteria and energy performance requirements for types of eligible individual measures and packaged solutions and will list them on a publicly available List of Eligible Materials and Equipment (or "LEME") website expected to be finalised in the second half of 2015. Eligible Measures are envisaged to include: Energy efficient windows and glazing of permanently occupied areas; Additional glazing of balconies and loggias or windows/glazing of common areas in multi-storey apartment buildings (staircases, basements, technical rooms, etc); Thermal insulation of walls and roof - not applicable for individual apartments in multi-storey apartment buildings; Thermal insulation of floor; Energy efficient biomass stoves/boilers with or without associated controls, space heating and domestic hot water (DHW) storage systems; Specific household appliances (e.g. refrigerators, freezers, air conditioners, boilers, heat pumps); Solar water heaters with or without associated space heating and DHW systems; Energy efficient gas boilers with or without associated controls, space heating and DHW storage systems; Electricity-driven heat pumps including air-to-air, ground-to-water or water-to-water installations; Roof-top integrated grid and off-grid application of solar photovoltaic installations up to 2.0 kWp; Balanced mechanical ventilation with heat recovery for permanently occupied premises; Up-grade of building-level central space heating installation including building-level heat exchanger stations with associated controls, pipes, machinery and emitters as well as hydraulic balancing of entire installation. The detailed LEME and the associated list of eligible suppliers and installers will be made available to all shortlisted consultants at the time of the RFP. Contracting Authority: EBRD Status of Selection Process: Interested firms are hereby invited to submit expressions of interest. Assignment Start Date and Duration: The Assignment is expected to start in August 2015 and has an estimated overall duration of 5 years. The contract may be extended subject to satisfactory performance of the consultant, the needs of the Bank and availability of donor funds. Maximum Budget Available for the Assignment: EUR 4,500,000; exclusive of VAT. The consultant must determine whether any VAT would be chargeable on the services and the basis for that determination, without taking into consideration the special status of the Bank as an IFI and state this to the Bank in their response to the Invitation for Expressions of Interest. To the extent that a consultant incurs input VAT on goods and services purchased in connection with the provision of services (e.g. VAT on airline ticket) which is not otherwise recoverable by the consultant from the local tax authority, the gross cost to the consultant of such expenses shall be treated as a reimbursable expense. Funding Source: The source of funding is to be determined. Please note selection and contracting will be subject to the availability of funding. Eligibility: There are no eligibility restrictions. Consultant Profile: Corporate services are required. The Consultant shall be a firm or consortium of firms and shall have relevant previous project experience and staff as follows: 1. Experience of Firm/Consortium: The firm/consortium must have (a) a proven project experience in the previous implementation of similar facilities or assignments related to residential buildings energy management, residential buildings energy efficiency design and standards, knowledge of EU, international and local (Ukrainian) building regulations and relevant standards in relation to energy consumption and performance, as well as marketing skills to promote the Facility; and (b) strong project management, IT and database experience are essential to make the tracking/reporting and control of the monitoring process as efficient as possible. 2. CVs/Experts nominated by Consultant: The Consultant's team will be composed of professionals with relevant technical, marketing and economic background supported by engineers and architects in order to ensure compliance of conceptual designs with Ukraine legislation. The Consultant is expected to nominate a team of experts (good mix of skills, level of experience and language skills) capable of carrying out the Assignment. The key expert positions are: (a) Pool of Chartered Engineers and Architects: At least four experts including chartered civil engineers, chartered architects and chartered mechanical engineers with particular experience in residential buildings energy management, residential buildings energy efficiency design and standards, knowledge of EU, international and local (Ukrainian) building regulations and relevant standards in relation to energy consumption and performance, as well as marketing skills to promote the Facility. (b) Pool of Additional Experts: The key expert team shall further be composed of additional professionals with relevant technical, marketing and economic background and strong project management/administration, IT and database experience. (c) Implementation capacity: The Consultant should be able to assist, monitor, verify and provide specialised assistance to over 75,000 small-size sub-projects; Submission Requirements: In order to determine the capability and experience of Consultants seeking to be shortlisted, the information submitted should include the following: 1. Company profile, organisation and staffing (max. 4 pages); 2. Details of firm's previous experience or similar assignments undertaken in the previous five years, including information on contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided (if different from duration) , main activities, objectives; 3. CVs of key experts who could be available to work on the Assignment; 4. Completed Consultant Declaration and Contact Sheet, the template for which is available from the following web-link: http://www.ebrd.com/pages/workingwithus/procurement/notices/csu/contact_sheet.doc The above information should not exceed 40 pages excluding CVs and contact sheet. The complete expression of interest (including CVs and Contact Sheet) shall be one file (pdf or Word) to be uploaded to eSelection (only if the permissible file size is exceeded, the Consultant may split the expression of interest into further files). Expressions of Interest shall be submitted, in English, electronically through e-Selection, to reach the Bank not later than the closing date. Bank Contact Person: Steve Gillard Head TC Operations, Technical Cooperation European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN Tel: + 44 20 7338 7834 e-mail: GillardS@ebrd.com (submissions should be sent through eSelection and NOT to this email address) Notes: Following this invitation for expressions of interest, a shortlist of qualified firms will be formally invited to submit proposals. Consultant selection and contracting will be subject to availability of funding. The launch and implementation of the Facility may be affected by the political and macroeconomic situation in Ukraine. The EBRD may suspend, postpone, or re-structure the Assignment and the Facility to reflect changing market circumstances.

Development and implementation of the All Ukrainian Public Awareness Campaign on Energy Efficient Lighting (part 2 ‘Social and BTL Events’)

United Nations Development Programme | Published November 4, 2014  -  Deadline November 19, 2014
cpvs

Dear Bidder, The United Nations Development Programme (UNDP) hereby invites you to submit a Proposal to this Request for Proposal (RFP) for development and implementation of the All Ukrainian Public Awareness Campaign on Energy Efficient Lighting (part 2 ‘Social and BTL Events’) within GEF/UNDP project “Transforming the Market for Efficient Lighting”. Please be guided by the form attached hereto as Annex 2, in preparing your Proposal. Proposals may be submitted on or before 23:59 (Kyiv time) Wednesday, November 19, 2014 and via email to the address below: United Nations Development Programme tenders.ua@undp.org Procurement Unit Additional information and questions: procurement.ua@undp.org or by phone +38 044 2539363

ITB UKR / 2015/05 Supply of branded "Scarf and Hat" sets within the All-Ukrainian Public Awareness Campaign on Energy Efficient Lighting (re-advertised) / Ukraine

United Nations Development Programme | Published February 12, 2015  -  Deadline March 12, 2015
cpvs

Dear Bidder, The United Nations Development Programme (UNDP) hereby invites you to submit a Proposal to this Invitation to Bid (ITB) to Supply of branded "Scarf and Hat" sets within the All-Ukrainian Public Awareness Campaign on Energy Efficient Lighting (re -advertised). Please be guided by the form attached hereto as Annex 2, in preparing your Proposal. Proposals may be submitted on or before 23:59 (Kyiv time) Thursday, March 12, 2015 and via email to the address below: United Nations Development Programme tenders.ua@undp.org Procurement Unit Additional information and questions: procurement.ua @ undp.org or by phone +38 044 2539363 _________________________________________________________________ Dear Applicant, UNDP in Ukraine invites you to submit an application for production of branded sets "cap and scarf" as part of an all-Ukrainian company with energy efficient lighting. Please use the form in Appendix №2 tender document in preparing your proposal. Applications must be submitted by 23:59 (local time) on Thursday, March 12, 2015 e-mail: UNDP in Ukraine tenders.ua@undp.org purchasing department Additional Information: procurement.ua@undp.org or by phone + 38 044 2539363

ITB UKR / 2015/028 TV commercials, advertising on transport vehicles and in retail big box hardware stores / hypermarkets within the All-Ukrainian Public Awareness Campaign on Energy Efficient Lighting

United Nations Development Programme | Published May 10, 2015  -  Deadline May 24, 2015
cpvs

Dear Bidder, The United Nations Development Programme (UNDP) hereby invites you to submit a Bid to this Invitation to Bid (ITB) to Placement of TV commercials, advertising on transport vehicles and in retail big box hardware stores / hypermarkets within the All-Ukrainian Public Awareness Campaign on Energy Efficient Lighting (2nd phase). Please be guided by the form attached hereto as Annex 2, in preparing your Proposal. Proposals may be submitted on or before 23:59 (Kyiv time) Sunday May 24, 2015 and via email to the address below: United Nations Development Programme tenders.ua@undp.org Procurement Unit Additional information and questions: procurement.ua@undp .org or by phone +38 044 2,539,363 _______________________________________________________________________________________________________________________ Dear Applicant, UNDP in Ukraine invites you to submit an application for placement on television, in the transport and building supermarkets as part of nationwide information campaign on energy efficient lighting (second stage). Please use the form in Appendix №2 tender document in preparing your proposal. Applications must be submitted by 23:59 (local time) Sunday, May 24, 2015 e-mail: UNDP in Ukraine tenders.ua@undp.org of purchases Additional information: procurement.ua@undp.org or by telephone +38 044 2539363

Photorelay, timers, circuit breakers and electrical energy-saving lamps

М"якохідська сільська рада | Published September 17, 2016  -  Deadline September 23, 2016
cpvs

Photorelay, timers, circuit breakers and electrical energy-saving lamps

Energy-saving fluorescent lamps for use in lamps indoor lighting.

КП "Снігурівський благоустрій" | Published September 19, 2016  -  Deadline September 23, 2016
Winner
Згідно додатку (Технічні умови (лампи енергозберігаючі))
cpvs
31532900

Purchase energy-saving fluorescent lamps for use in lamps indoor lighting. The average duration of combustion - 8 000 - 12 000 hours. Voltage - 220V / 50HZ. Power 55 - 65 W. Type E cap 27. Colour 3900 - 6 400K. Shade light - day. Class energy efficiency - AA type - spiral. Shipping to the address the customer by the seller (performer). Companies on the general form of taxation, not a taxpayer VAT.

Gasoline A95 (scratch cards)

Територіальний центр соціального обслуговування (надання соціальних послуг) Чуднівської РДА | Published September 16, 2016  -  Deadline September 21, 2016
Winner
Бензин A95 (скретч-картки)
cpvs
09132000

Gasoline A-95 Energy in the amount of 300 liters in coupons (scratch cards) in denominations of 10 and 15 liters

Finance and Technology Transfer Centre for Climate Change (FINTECC) - Policy Dialogue

 | Published August 5, 2015  -  Deadline September 11, 2015
cpvs

Project Description: The European Bank for Reconstruction and Development (the "EBRD" or the "Bank") is actively promoting investments and policies focused on climate technology transfer across all of its countries of operations. This activity is a result of the Bank’s Sustainable Resource Initiative ("SRI"), an umbrella initiative which promotes transition, efficiency and innovation enhancing competitiveness in three areas vital for its countries of operations: energy, water and waste. As part of this activity, the EBRD has launched FINTECC in Ukraine ("FINTECC Ukraine"), which aims to develop and demonstrate innovative policy and technical assistance packages and support development of performance-based financing mechanisms to increase investment in climate technologies in Ukraine. Policy dialogue is an important component of the FINTECC Ukraine package. Overall, the policy component aims to improve legislation, policy and standards to strengthen the enabling environment for technology transfer and improved energy self-sufficiency in Ukraine. However, given the limited resources, it is necessary to focus the policy assistance on priority areas requiring immediate attention. The EBRD intends to engage a consultancy firm (the "Consultant") to provide policy support to the Government of Ukraine. The primary aim of the assignment is to support institutional, policy and regulatory policy dialogue to assist the Ukrainian government to design an effective policy framework for climate technology transfer (the "Project"). The main focus of the Project would be to: - evaluate the current status and gaps in Ukraine's implementation of the Eco-Design Directive (2009/125/EC) (the "Directive") and recommend the legislative, regulatory and other actions necessary to complete the implementation of the Directive; - support the State Agency for Energy Efficiency ("SAEE") by drafting the necessary Legislation and Priority Regulations and assisting the State Agency for Energy Efficiency to secure inter-Ministerial approval and subsequent governmental adoption of the Legislation and Priority Regulations; and - assist the State Agency for Energy Efficiency to embed energy efficiency into the public procurement rule books. The EBRD intends to award one Framework Contract to retain one consultancy firm to provide the above named consultancy services. The Framework Contract will establish, in advance, fee rates for experts, contract terms, agreements and procedures that will govern individual assignments ("Assignments" or "Call-off Notices") to be required to implement the Project. The Consultant will be required to propose on request a team of experts for specific assignments to carry out the following envisaged tasks: 1. To help to structure the ongoing policy dialogue with the SAEE and other stakeholders on the essential upgrade of the existing policy framework by: - reviewing and summarising the existing policy, legislative and regulatory framework that impact on the deployment of climate technologies; - recommending the legislative and regulatory actions that the Government of Ukraine needs to take to approximate its legislation; - providing a rationale for the recommended actions and estimate the likely financial, energy and CO2 savings associated with the actions; - reviewing the existing institutional structures and recommending any changes necessary to ensure adequate implementation of the Directive (including monitoring, verification and enforcement regime). 2. To support the SAEE by drafting legislation and the priority regulations, including preparing any necessary technical studies of energy performance of the technologies available on the market in Ukraine and providing comparison against international benchmarks as background information for setting energy efficiency requirements as well as working with relevant government and private-sector stakeholders to: - establish the technical energy efficiency specifications for each of the technologies under the priority regulations; - agree on the important elements of the priority regulations including the applicable conformity assessment procedures, information requirements to facilitate compliance checks, the timeframe for compliance by manufacturers and importers and the review period for the regulation. 3. To develop relevant amendments to Ukrainian public procurement regulations to ensure that energy efficiency characteristics are taken into account for public procurement of goods and services in the built environment for energy using and related equipment. This would include, in accordance with the EU Directives 2006/32/ЄС and 2012/27/ЄС, development of energy efficiency criteria for goods and services, to be used for the purposes of public procurement; definition of the designated governmental agency, and suggesting the process for developing and reviewing such criteria. This task will require identification of the level of necessary amendments (primary or secondary legislation) and drafting relevant legal texts. This task will address high energy inefficiency of public infrastructure and buildings in Ukraine, and will incentivize climate technologies use in public sector. Status of Selection Process: Interested firms or groups of firms are hereby invited to submit expressions of interest. Assignment Start Date and Duration: The Assignment is expected to start in January 2016 and has an estimated overall duration of 26 months. Cost Estimate for the Assignment: EUR 700,000.00 (exclusive of VAT). Subject to availability of funding. The Consultant must determine whether any VAT would be chargeable on the services and the basis for that determination, without taking into consideration the special status of the Bank as an IFI and state this to the Bank in their response to the Invitation for Expressions of Interest. To the extent that a Consultant incurs input VAT on goods and services purchased in connection with the provision of services (e.g. VAT on airline ticket) which is not otherwise recoverable by the consultant from the local tax authority, the gross cost to the consultant of such expenses shall be treated as a reimbursable expense. Funding Source: It is anticipated that the contract will be financed through the EBRD's donor funded Technical Cooperation Funds Programme. However consultant selection and contracting will be subject to availability of funding from an appropriate donor. Eligibility: There are no eligibility restrictions. Consultant Profile: Corporate services are required. The Consultant will be a firm or a group of firms preferably with previous project experience relating to: (i) project advisory works in the field of energy efficiency, preferably in climate technology transfer, preferably in EBRD countries of operations; (ii) supporting public administrations in providing key policy recommendations in the field of energy efficiency, preferably in climate technology transfer, preferably in EBRD countries of operations The Consultant's Experts Team is expected to include Key Experts as follows: Team leader with preferably 10 years of previous policy experience and expertise in leading the implementation of energy efficiency policy projects with demonstrable project management skills and previous professional experience of working in Ukraine or similar EBRD Countries of Operations (COOs). Previous professional experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage; Senior international legal/policy experts with preferably 10 years of previous experience and expertise in energy efficiency policies. Previous professional experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage; Senior international economists with preferably 10 years of previous professional experience with energy efficiency policies. Experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage; Senior international energy efficiency policy expert with preferably 10 years of previous professional experience relating to energy efficiency policy development and implementation. Previous professional experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage; Local technical economist with preferably 5 years of relevant previous professional experience relating to energy efficiency in Ukraine. Previous professional experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage; Local technical energy efficiency experts with preferably 5 years of previous professional experience in the development and implementation of energy efficiency policies in Ukraine and/or other EBRD COOs. Previous professional experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage; Local energy efficiency policy specialist with preferably 5 years of previous professional experience in the development of energy efficiency policies in Ukraine. Previous professional experience with eco-design and/or other standards and labelling (S and L) policies would be an advantage. Submission Requirements: In order to determine the capability and experience of Consultants seeking to be selected for this Assignment, the information submitted should include the following: - Company/group of firms’ profile, organisation and staffing (max. 2-4 pages); - Details of previous project experience or similar assignments undertaken in the previous five years, including information on contract value, contracting entity/client, project location/country, duration (mm/yy to mm/yy), expert months provided (if different from duration) , main activities, objectives; - CVs of key experts who could be available to work on the Assignment detailing qualifications, experience in similar assignments, particularly preferably undertaken in the previous ten years, including information on contracting entity/client, project location/country, duration (mm/yy to mm/yy), experts months provided, assignment budget, main activities, objectives; - Completed Consultant Declaration Form and Contact Sheet, the template for which is available from the following web-link: http://www.ebrd.com/pages/workingwithus/procurement/notices/csu/contact_sheet.doc. The above information should not exceed 20 pages excluding CVs and contact sheet. The complete expression of interest (including CVs and Contact Sheet) shall be one file (pdf or Word), not exceeding 4MB, to be uploaded to eSelection. The EBRD reserves the right to reject applications of firms submitting more than one file. Only if the permissible file size is exceeded, the Consultant may split the expression of interest into further files. Expressions of Interest shall be submitted, in English, electronically through e-Selection, to reach the Bank not later than the closing date. Bank Contact Person: Maria Haugh European Bank for Reconstruction and Development One Exchange Square London EC2A 2JN Tel: + 44 20 7338 7185 e-mail: haughm@ebrd.com (submissions should be sent through eSelection and NOT to this email address) Notes: 1. Following this invitation for expressions of interest, a shortlist of qualified firms will be formally invited to submit proposals. Consultant selection and contracting will be subject to availability of funding. 2. The evaluation criteria are as follows: - Firm's experience in project advisory works in the field energy efficiency, preferably in climate technology transfer, preferably in EBRD countries of operations - 30% - Firm's experience in supporting public administrations in providing key policy recommendations in the field of energy efficiency, preferably in climate technology transfer, preferably in EBRD countries of operations - 20% - Composition and qualifications of Key Experts Team - 50%

Overhaul of the heating system with installation of the device accounting of heating energy at home Olympyyskoy 181 on the street in the city Mariupol.

КОМУНАЛЬНЕ КОМЕРЦІЙНЕ ПІДПРИЄМСТВО МАРІУПОЛЬСЬКОЇ МІСЬКОЇ РАДИ "КЕРУЮЧА КОМПАНІЯ "СХІДНА" | Published September 19, 2016  -  Deadline September 23, 2016
cpvs

Overhaul of the heating system with installation of the device accounting of heating energy at home Olympyyskoy 181 on the street in the city Mariupol. Without predoplatы. Payment will be in proyzvedena techenyy two weeks after Perform activities IZ funds horodskoho budget.

Ternopil District Heating Modernisation Project

 | Published September 4, 2014  -  Deadline September 4, 2015
cpvs

GENERAL PROCUREMENT NOTICE This is an update of the original notice published on 12 August 2012. Communal Enterprise “Ternopilmiskteplokomunenergo” of the Ternopil City Council, a municipal district heating utility, has applied for a loan from the European Bank for Reconstruction and Development [the Bank] and a grant from the Eastern Europe Energy Efficiency and Environment Partnership ("E5P") Fund for a project aimed at improving the energy efficiency, reducing energy losses, gas and electricity consumption and improving the quality of heat and hot water supply services in the City of Ternopil. The proposed project, which has a total estimated cost of approximately EUR 17.5 million equivalent, will require the procurement of the following goods, works and services: · New biomass fuelled boiler with heat pump · Individual heating substations · Rehabilitation and modernisation of boiler houses · Replacement of large distribution pumps · Replacement of obsolete pipes · Solar heating plant · SCADA Tendering for the above contracts is expected to begin in the Q4 2014. Contracts to be financed with the proceeds of a loan from the Bank and E5P grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the loan and the grant will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country. Interested suppliers, contractors and consultants should contact:

Second Urban Infrastructure Proj (UIP2) - P132386

 | Published March 11, 2016
Winner
JV of LLC "IBK EVROTEKHNOLOGIYI" and "GRANIT" LLC
cpvs

Reconstruction Of Iiird Level Wps Of Desnianska Ws, Including Installation Of Energy Efficient Equipment And Frequency Regulation And Reconstruction Of Power Utilities Of Krutohirna Ps ICB Contract Award Notice Ukraine Project: P132386 - Second Urban Infrastructure Project Bid/Contract Reference No: KYV-ICB-01-L2 Scope of Contract: Reconstruction of IIIrd level WPS of Desnianska WS, including installation of energy efficient equipment andfrequency regulation and reconstruction of power utilities of Krutohirna PS Duration of Contract: 12.00Month(s) Contract Signature Date: Evaluation Currency: USD-United States Dollars Awarded Bidder(s): Name: JV of LLC "IBK EVROTEKHNOLOGIYI" and "GRANIT" LLC Address: Moskovsky ave., 21, b.3, off.4, 04073 Country: Ukraine Bid Price at Opening:USD 2,998,013.00 Evaluated Bid Price: USD2,550,181.50 Contract Price: USD2,998,013.00 Evaluated Bidder(s): Name : JV of LLC "IBK EVROTEKHNOLOGIYI" and "GRANIT" LLC" Address :Moskovsky ave., 21, b.3, off.4, 04073, Kyiv, Ukraine Country: Ukraine Bid Price at Opening:USD 2,998,013.00 Evaluated Bid Price: USD2,550,181.50 Evaluated Bidder(s): Name : Vertical Lim Address : Country: Ukraine Bid Price at Opening:USD 4,230,000.00 Evaluated Bid Price: USD3,583,833.30 Rejected Bidder(s): Name: "UTEM ? ENGINEERING" LLC Address: 08292, Kyivs'ka oblast, Bucha, PB 1082 Country: Ukraine Bid Price at Opening:USD 3,910,294.00 Reason for Rejection: Non Responsive Rejected Bidder(s): Name: Construction association "Interbudmontazh" Address: 01013, 1, Promyshlenna str. Country: Ukraine Bid Price at Opening:UAH 27,842,915.00USD 3,778,706.00 Reason for Rejection: Bid Security not Provided Rejected Bidder(s): Name: LLC "Remhidromash" Address: 61128, Ukraine, Kharkiv, 151, 50-years of USSR ave. Country: Ukraine Bid Price at Opening:EUR 4,100,000.00 Reason for Rejection: Bid Security not Provided Rejected Bidder(s): Name: LLC HYDROTECH ENGINEERING Address: 49022, 45-B, Molodogvardyskaya Country: Ukraine Bid Price at Opening:EUR 5,500,000.00 Reason for Rejection: Non Responsive

Lutsk District Heating Project

 | Published January 28, 2016  -  Deadline January 27, 2017
cpvs

Lutsk City State Communal Enterprise "Lutskteplo" intends using the proceeds of a loan from the European Bank for Reconstruction and Development [the Bank] and a grant from the Eastern Europe Energy Efficiency and Environment Partnership ("E5P") Fund for a project aimed at reducing energy losses, reducing gas and electricity consumption and improving the quality of service of the heat and hot-water supply system in the City of Lutsk. The proposed project, which has a total estimated cost of EUR 16 million equivalent will require the procurement of the following goods, works and services:

 

  • Individual heat substations
  • Installation of alternative fuel boiler plant
  • Modernisation of boiler houses and CHS
  • Rehabilitation and replacement of district heating networks
  • Decommissioning of basement boilers
  • Replacement of outdated boilers
  • Monitoring and dispatching system (SCADA)

 

Tendering for the above contracts is expected to begin in the Q1 2016.

 

Contracts to be financed with the proceeds of a loan from the Bank and E5P grant will be subject to the Bank's Procurement Policies and Rules and will be open to firms from any country. The proceeds of the loan and the grant will not be used for the purpose of any payment to persons or entities, of for any import of goods, if such payment or import is prohibited by a decision of the United Nations Security Council taken under Chapter VII of the Charter of the United Nations or under a law of official regulation of the Purchaser's country.

Interested suppliers, contractors and consultants should contact:

 

State Communal Enterprise "Lutskteplo"
Contact: Mr Bogdan Karachevskiy
20 Hulaka-Artemovskoho Str., office 216, Lutsk, 43021 Ukraine
Tel: +380 332 773210
Fax: +380 332 773202
Email address: teplo@mail.lutsk.ua

Overhaul. Implementing measures enerhozberezhuvalnyh kindergarten (preschool pdrozdili Zaliznytskoho educational complex) with hot water from renewable energy sources

ГО "Сприяння" с. Залізниця | Published September 16, 2016  -  Deadline September 24, 2016
Winner
Капітальний ремонт. Впровадження енергозбережувальних заходів у дитячому садку (дошкільному пдрозділі Залізницького навчально-виховного комплексу) із гарячого водопостачання на основі відновлювальних джерел енергії
cpvs
09331100