AB Fortum Värme samägt med Stockholms stad | Published December 2, 2016  -  Deadline December 15, 2016
cpvs
31124100, 31120000

Pre-qualification to participate the tendering process for turbine G1 KVV1:

Turbine and generator data:

Turbine: BBC type D3EYTT2i 250 manufactured by STAL LAVAL at licence 1975.

— Data: 177 bar/ 535oC.

— As district heating turbine 210 MWel/330 MWheat

— As condensing turbine 235 MWel.

Generator: ASEA Type GTH 1650 GK, manufactured 1975.

— Hydrogen cooled.

— 16,5 kV

— 284 MVA.

The scope of supply is a complete overhaul of the steam turbine/generator plant including opening, checking all internal parts, NDT, delivering and replacing of needed spare parts, needed engineering for repair and exchange of damaged or worn parts, needed manufacturing, delivery and erection of all equipment as well as the re-commissioning of the Turbine.

Main parts in scope:

— Operation check before stop.

— Large overhaul of HP, IP and LT turbine including check of connected systems as oil, gland steam, bleeding systems.

— Overhaul of all CV and ESV including servo actuators.

— NDT tests of turbine parts, valves, bearings etc.

— Inspection of DH condensers and sea water condenser.

— Large overhaul of generator.

— Electric tests as DTI and ELCID.

— Safety tests and commissioning.

— Needed tools and consumable spare parts for overhaul.

— Option for turbine insulation.

— Personnel for all works.

— The price shall be fixed for specified scope in the RFQ.

Steam turbine.

Mälarenergi AB | Published July 11, 2015  -  Deadline August 31, 2015
cpvs
42112100, 31124000, 51133000

Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 MWth for combustion of recycled wood fuel; A back-pressure steam turbine of about 55 MWe; A flue gas treatment system including flue gas condensation and combustion air moisturising system with condensate cleaning; A fuel handling system to supply the boiler with fuel. This procurement (Dnr 2015/34) relates to steam turbine.

Steam turbine

Mälarenergi AB | Published October 10, 2016  -  Deadline November 8, 2016
cpvs
31124000, 42112100, 51133000

Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of four main parts: A steam boiler of 150 – 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 – 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the purchase of a district heating condensing steam turbine of about 55 – 65 MWe.

Steam turbine

Mälarenergi AB | Published October 14, 2016  -  Deadline November 8, 2016
cpvs
42112100, 31124000, 51133000

Mälarenergi AB is planning to invest in a new combined heat and power (CHP) plant with auxiliary systems and to modernise the existing plant in Västerås. The Project consists of 4 main parts: A steam boiler of 150 — 180 MWth for combustion of recycled wood fuel, a district heating condensing steam turbine of about 55 — 65 MWe, a flue gas treatment system and a fuel handling system including preparation and storage to supply the boiler with solid fuel. This procurement (Dnr 2016/43) relates to the purchase of a district heating condensing steam turbine of about 55 — 65 MWe.

Steam turbine driven feed water pumps

Renova AB | Published May 4, 2016
cpvs
31124000, 42112100, 42112000, 42122130, 42113100, 09322000, 09320000

Steam turbine driven feed water pumps.

Wind Turbine Generator Package. Horns Rev 3

Vattenfall Vindkraft A/S | Published February 5, 2016
cpvs
31121330, 31121340, 31121320

Wind Turbine Generator Package. Horns Rev 3

Wind Turbine Generator Installation package.

Vattenfall Vindkraft A/S | Published January 23, 2014  -  Deadline February 14, 2014
cpvs
45244100, 45251160, 31121320, 31121330, 76521000, 76522000

Vattenfall intents to participate in the call for bids for the concession of offshore wind farm Horns Rev 3concession, led by the DEA [Danish Energy Agency]. This wind farm will have a capacity of between 390 MW to 410 MW and will consist of foundations, wind turbine generators and inter array cables. The total scope of works of this tender includes the offshore transport of the Wind Turbine Generator's (WTG's) from the port of pre-assembly to the Horns Rev 3 offshore construction site as well as the offshore installation of the Wind Turbine Generator's (WTG's) on the Horns Rev 3 offshore construction site.

NEW TURBINE AND GENERATOR (14/2)

Ljungby Energinät AB | Published February 14, 2014  -  Deadline March 31, 2014
cpvs
65400000

Exchange of turbine and generator in Ljungby Powerhouse

120 Steam Turbine.

Borås Energi och Miljö AB | Published June 4, 2013  -  Deadline July 8, 2013
cpvs
42112000, 42112100, 51133000

Pre-qualification of the steam turbine.

Vertical Axis Wind Turbine.

Uppsala University | Published May 10, 2012
Winner
Vertical Wind AB
cpvs
31120000, 31121300, 42110000

Uppsala University, department of engineering sciences, intends to buy a special concept with vertical turbine and a direct driven generator.

Air Turbine Starter FM-2267-13.

Försvarets materielverk | Published March 29, 2013  -  Deadline April 29, 2013
cpvs
34731000

Air Turbine Starter Hercules C-130. Swedish Defence Materiel Administration (FMV), on behalf of Swedish Armed Forces., invite you to apply for submit tender regarding air turbine starter part number 3505786-1. Directlink to Mercell: http://permalink.mercell.com/38356891.aspx

Steam turbine 120 (14/9)

Borås Energi och Miljö AB | Published January 29, 2014
cpvs
42112100, 45330000, 51900000

Steam turbine to KVV

Air Turbine Starter FM-2267-13

Försvarets materielverk | Published April 4, 2013  -  Deadline April 29, 2013
cpvs
34731500

Air Turbine Starter Hercules C-130. Swedish Defence Materiel Administration (FMV), on behalf of Swedish Armed Forces., invite you to apply for submit tender regarding air turbine starter part number 3505786-1. The purchaser is using Mercell Sourcing Services for this tender. To notify your interest and get access to any documents, you must copy and paste the link below into the address-part on your browser. http://permalink.mercell.com/38413473.aspx. Then choose the relevant tender.

External project KVV 2 - DO 3 Designing Turbine.

Eskilstuna Energi och Miljö AB | Published April 4, 2014  -  Deadline May 5, 2014
cpvs
71000000, 71315200, 71320000, 71500000, 71530000, 71541000

Project Manager - pre-planning turbine.

Sprinklers KV50 and KV61 - Bunker and Turbine (16/39)

Tekniska verken i Linköping AB (publ) | Published March 9, 2016  -  Deadline April 1, 2016
cpvs
45343230

Installation of sprinkler systems in fuel bunkers KV50 and KV61 and KV61 in the turbine on Gärstadverket in Linköping

Platforms to the turbine housing KV62 (15/4)

Tekniska verken i Linköping AB (publ) | Published January 14, 2015  -  Deadline February 2, 2015
cpvs
45262300, 45262400, 45340000

Technical plants in Linköping AB is constructing a new waste-fired combined cycle units on Gärstadverket, KV62, in order to expand production capacity and eventually allow the settlement of power plant KV1 in the city center. Electricity generation takes place by means of a steam turbine with generator and associated systems. Maximum heat production is about 80 MW and maximum power production about 23 MW.I turbine building are three levels, namely ground level (+4.0), turbine plane (+15.2) and in between an auxiliary plane (+11.2). The two former are concrete plan, and the latter performed as platforms, this request omfattar.ADMINISTRATIVA Regulations inquiry includes a performance contract based on AB04.

Used turbine powered airplane (15/17)

Ronneby kommun | Published June 18, 2015  -  Deadline August 25, 2015
cpvs
34711100

1 used civilian registered turbine-powered airplane to be used in the training of future aircraft mechanics / aircraft technicians.

Repair and maintenance services of electrical machinery, apparatus and associated equipment

AB Fortum Värme samägt med Stockholms stad | Published July 5, 2013  -  Deadline August 19, 2013
cpvs
50532000, 31120000, 31124100, 42112000, 42112100, 50532300, 51111000, 51133000

During the summer of 2014 major overhauls of both turbine and generator are planned. ·The G2 steam turbine at Värtan plant is manufactured by ABB Stal, model ETME 56-25, with an electrical output of 120 MW and a district heating output of 205MW. ·The generator model is GTL1530 manufactured by ABB Generation. ·The turboset has been in operation more than 100 000 hours.

External project KVV 2 - DO 3 Designing Turbine (UH 14-10)

Eskilstuna Energi och Miljö AB | Published April 1, 2014
cpvs
71000000, 71315200, 71320000, 71500000, 71530000, 71541000

Project Manager - pre-planning turbine

Steam-turbine generator and related apparatus

Renova Miljö AB | Published July 15, 2016  -  Deadline August 22, 2016
cpvs
31124000, 09322000, 42112000, 42112100, 42113100, 42120000, 42122130, 09320000

Renova Environmental AB will replace two existing turbine-driven feedwater pumps with two new steam turbine-driven feedwater pumps, about 2 x 900 kW.

The contract covers the turnkey in the documents specified limits design, manufacture, install and commission two (2) complete steam turbine-driven feedwater pumps.

Renova will provide two (2) pumps according to the documents attached.

The contract should all work be included and all materials (in addition to the two pumps that provide Renova) required to deploy two (2) complete the facilities.

Renova will provide:

- Dismantling of the existing turbine-driven feedwater pumps.

- Adaptation of concrete foundations, according to the contractor's instructions.

- Connection to existing piping for steam, feed water and sewer steam.

Prior information notice advertised 05/04/2016.

Closing date 08.22.2016.

Submitted questions will be answered gathered during the week 1632nd