Public tenders for turbine in Norway

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Hydraulic turbines

Ramfoss Kraftlag | Published January 31, 2017
Winner
Rainpower Norge AS
cpvs
42112200

Rehabilitation of 3 Franisturbines including 3 new turbine rotors.

Service Agreement (s) for turbines

Oslo kommune, Energigjennvinningsetaten | Published June 21, 2014  -  Deadline August 11, 2014
cpvs
42110000, 42112000, 42112100, 42112200, 42112300, 42112400, 42113000

Energigjennvinningsetaten need to sign up to two service agreements respectively MAN MARC 2 turbine and Siemens V25 turbine. Service Agreement (s) will include scrolling support, annual inspection, minor / major overhaul and repair, as well as delivery of spare parts.

Framework agreement turbine fuel F-35 and F-44.

Forsvarets logistikkorganisasjon (FLO) | Published October 11, 2013  -  Deadline November 20, 2013
cpvs
09134200, 09211300

Framework agreement turbine fuel for Armed Forces aircraft. See tender documents for further information. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=307395

Framework agreement Turbine Fuel F-35 and F-44.

Forsvarets logistikkorganisasjon (FLO) | Published August 9, 2013  -  Deadline September 25, 2013
cpvs
09134200, 09211300

Turbine fuel F-35 and F-44 for the Norwegian Armed Forces' vessels. See tender documents for further information. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at: http://www.doffin.no/Search/Search_Switch.aspx?ID=302358

Turbine Fuel F-35 - RFI

Sted: hele Norge | Published December 13, 2017
cpvs
09131100

This is an RFI for the purchase of a framework agreement for the delivery of Turbine Fuel F-35.

Outside area at the Turbine

Fylke: Hordaland, Kommune: Vaksdal | Published July 2, 2018
Winner
Fylke: Hordaland, Kommune: Osterøy
cpvs
77314100

Vaksdal municipality has built the turbine fleirbrukshallen a few years ago. In connection with the building there is today an area that is not used today. Here the municipality will establish an area to be used by SFO, users of the Turbine and residents of the area. Outside area shall consist of swings and play equipment for the smallest, gathering space for everyone, garden and possibly outdoor exercise area.

Outside area at the Turbine

Fylke: Hordaland, Kommune: Vaksdal | Published April 17, 2018
cpvs
77314100

Vaksdal municipality has built the turbine fleurbrukshallen a few years ago. In connection with the building there is today an area that is not used today. Here the municipality will establish an area to be used by SFO, users of the Turbine and residents of the area. Outside area shall consist of swings and play equipment for the smallest, gathering space for everyone, garden and possibly outdoor exercise area.

Turnkey micro gas turbine

COWI AS Fredrikstad | Published October 10, 2013  -  Deadline November 4, 2013
cpvs
42112300

Northern Following Treatment Authority (NFR) treats wastewater from municipalities Oppegård, Ski and Sciences, and is owned by the same municipalities through an inter-municipal company. Manufactured sludge undergoes a thermophilic anaerobic treatment. The biogas that is produced in this process burnt today in boilers for production of hot water for internal use at the facility. Excess gas is burned in flares. For a better utilization of the energy of biogas, it decided to install micro gas turbine for generation of electricity and hot water. In addition to the supply and installation of the turbine, comprises the turnkey contract also performances of biogas from existing systems, and connectivity to internal electrical and water networks. CPV: 42112300.

Ramfoss power plants - Turbine Rehabilitation

Ramfoss Kraftlag | Published January 30, 2017
cpvs

Rehabilitation of three Francis turbines including 3 new turbine impeller

Monserud treatment plants - M5 Micro Gas Turbine

Ringerike Kommune | Published March 10, 2017  -  Deadline April 21, 2017
cpvs
42112300

In connection with the expansion of Monserud wastewater treatment plants will be installed micro gas turbine (s) that will use biogas produced by the plant as fuel. Electricity and hot water produced by the turbine will be used internally at the treatment plant. Micro gas turbine to be installed in a separate room in the new treatment plant and will use biogas from both existing and new plants. Contract based on NS 8407: 2011 and special contractual provisions.

Monserud treatment plants - M5 Micro Gas Turbine

Ringerike Kommune | Published September 3, 2017
cpvs

Ringerike municipality invites negotiated for contract M5 Micro turbine in connection with the expansion of Monserud plants.

Framework agreement turbine fuel F-35 and F-44

Forsvarets logistikkorganisasjon (FLO) | Published August 7, 2013  -  Deadline September 25, 2013
cpvs
09134200, 09211300

Turbine Fuel F-35 and F-44 for military vessels. See tender documents for further information CPV: 09134200, 09211300.

Framework agreement turbine fuel F-35 and F-44

Forsvarets logistikkorganisasjon (FLO) | Published October 9, 2013  -  Deadline November 20, 2013
cpvs
09134200, 09211300

Turbine Fuel F-35 and F-44 for military vessels. See tender documents for further information CPV: 09134200, 09211300.

Remme Valley RA - Entrprise V3: Micro Gas Turbine

Halden kommune | Published June 29, 2016  -  Deadline September 15, 2016
cpvs
45000000, 45350000

Remme Dalen treatment plant is located in Remme valley west of downtown Halden, and treats wastewater from Halden Municipality. The plant will be expanded and rehabilitated, blah. with the establishment of anaerobic sludge stabilization. For the production of electricity and hot water from produced biogas, install a micro gas turbine plant. This procurement includes a turnkey delivery and installation of micro gas turbine plant.

Turbines and motors

Oslo kommune, Energigjennvinningsetaten | Published June 25, 2014  -  Deadline August 11, 2014
cpvs
42110000, 42112000, 42112100, 42112200, 42112300, 42112400, 42113000

The Norwegian Waste to Energy Agency needs to enter into service contracts for respectively MAN MARC 2 turbine and Siemens V25 turbine. The service contract(s) will include support, annual inspection, minor/major overhaul and repairs, as well as the supply of spare parts.

hydraulic turbines

Valdres Energiverk AS | Published January 7, 2012  -  Deadline January 20, 2012
cpvs
31100000, 31120000, 42112200

:— 1 Kaplan turbine, Q0 = 10,5 m3/s, gross head approx. 15,5 m, — 1 generator, power approx 1,5 MVA, — Transformer, ratio (kV) 0.69/22, — Control and switch gear, — Cooling and drainage facilities, — Cable installations, — Intake cone with connection to pipe, — Electrotechnical equipment by the dam. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=246957.

hydraulic turbines

SISO Energi AS | Published January 26, 2012  -  Deadline February 6, 2012
cpvs
31100000, 31120000, 42112200

:— 1 Pelton turbine, maximum operating flow 1,4 m3/s, gross head approximately 426 m, — 1 Synchronous generator, power approx. 5,5 MVA, — 1 Power transformer, transformation 6,6/22 kV, — High-voltage switch-gear, — 22 kV power cables, — Station supply in the power station, — Low voltage supply at the dam, — Control and protection system, — Cooling water and drainage equipment, — Lifting equipment, — Spare parts. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=248285.

Ramfoss power stations - Turbine Rehabilitation

Ramfoss Kraftlag | Published June 23, 2016  -  Deadline August 19, 2016
cpvs
42112200

Ramfoss power plant is equipped with three Francis turbines from 1960 and 1970 (P = 10 MW, H = 22.5 m, Q = 50 m3 / s and n = 150 rpm). These will be rehabilitated and therefore wishes to purchase services for complete rehabilitation of all three turbines.

Possible installation of new impeller as part of the rehabilitation will be considered during the process, and it will therefore as part of the procurement process will be asked if option prices on new impellers.

Petroleum products, fuel, electricity and other sources of energy

Forsvarets logistikkorganisasjon (FLO) | Published November 24, 2017
cpvs
09000000, 09131100

The Norwegian Defence Logistics Organisation (FLO) is now preparing a new notice regarding a Framework Agreement for the purchase of Turbine Fuel F-35, and via this RFI (Request for Information) invites the supplier market to provide input about how FLO, as the Contracting Authority, can improve the procurement and the contract.

The Contracting Authority wants input from potential tenderers on the last edition of the competition documents.

The Contracting Authority wants input from potential tenderers on the last edition of the competition documents.

The Contracting Authority is open to receiving all types of input that can contribute to improving the new procurement process and the framework agreement for Turbine Fuel F-351, but suggests the following keywords.

— Uncertainties/ incompleteness,

— Competition limiting minimum requirements,

— Competition distortive elements,

— Any suggestions for improving the implementation of the procurement process.

This is an RFI for procurement of a framework agreement about delivery of Turbine Fuel F-35.

turbines and motors

Otra Kraft DA | Published September 28, 2012
Winner
Rainpower Small Hydro AS Instituttveien 8 2007 Kjeller NORWAY
cpvs
31120000, 31124200, 42110000, 51111200, 51133000

:One singel contract covering: Delivery and Installation of Complete Turbine Units(2) with Generators(2) and Control System. The scope of sulpply covers: — Turbines, 2 equal sized hydroelectrical turbines, — Generators, 2 equal sized units, — Common control system for total package, — HV and LV work. The Contractor shall be responsible for the complete delivery: — Management, — Design and Engineering, — Interface with other contractors, — Material supply, — Manufacturing, — Assembly work, work shop, — Delivery to installation site, Bykle, Norway, — Installation work, — Testing, — Trial run supervision, — Documentation. Turbines (2). Type unit: Francis, vertical. No. off: 2. Head-and tail water levels: — Highest regulated head water level: 633 (m.a.s.l), — Lowest regulated head water level: 630 (m.a.s.l), — Highest tail water level: 551 (m.a.s.l), — Lowest tail water level: 495 (m.a.s.l). Water flow: 2 x 16,5 (m3/s). Capacity: 2 x 12 MW. An electronically governor and a high pressure hydraulic unit with an accumulator to be supplied. Cooling water and drain system to be part of the supply. Generators(2). No. off: 2. Capacity: 2x 15 MVA. Requirements: According to IEC 60 034. Control and Management system (1). Management and control of the complete system. The system to be designed and built for manual - as well as for fully automatically operation from a Common Control Centre 30 km away from the Skarg power station. All electrical (HV & LV) work up to connection of the grid line to be in the scope.(Transformer(1) delivered by others).