Public tenders for turbine in Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

K1490 steam turbine mechanical maintenance and repair

Fővárosi Közterület-fenntartó Zártkörűen Működő Nonprofit Részvénytársaság | Published April 15, 2015  -  Deadline April 13, 2015
cpvs
50000000

Context of entrepreneurial framework agreement operated by the non-profit FKF Zrt. Waste Recovery Plant operating 24 MW steam turbine mechanical maintenance and repair.

acquisition of JET-A1 fuel gas turbine aircraft - AF

Készenléti Rendőrség | Published January 11, 2017  -  Deadline February 20, 2017
cpvs
09131000

acquisition of JET-A1 fuel gas turbine aircraft - AF

Contract acquisition of JET-A1 fuel gas turbine aircraft

Készenléti Rendőrség | Published May 4, 2017
Winner
MOL Nyrt.
cpvs
09131100

Contract acquisition of JET-A1 fuel gas turbine aircraft

Transport contract JET A1 aviation turbine fuel vehicle purchase.

Készenléti Rendőrség | Published January 31, 2014  -  Deadline March 14, 2014
cpvs
09131000

Transport contract JET A1 aviation turbine fuel vehicle purchase.

Preparation of reserve gas turbine power plant feasibility study - an invitation to participate

MVM Paks II. Atomerőmű Fejlesztő Zártkörűen Működő Részvénytársaság (MVM Paks II. Zrt.) | Published September 9, 2015  -  Deadline September 22, 2015
cpvs
71241000

Drawing up a contract / reserve gas turbine power plant feasibility study

The FKF K1586 Management Company. Because the premises of 24 MW turbine maintenance planned for the HPA, heating turbine direct connection of the electrical network of HHM HHM meet the total electric needs for the duration of downtime

Fővárosi Közterület-fenntartó Zártkörűen Működő Nonprofit Részvénytársaság | Published December 2, 2015
Winner
INFOWARE Vállalkozási és Kereskedelmi Zártkörű Részvénytársaság
cpvs
45311200

The FKF Nonprofit Zrt.'s Site for 24 MW turbine is designed for maintenance-Waste Recovery Plant, direct connection of heating turbine to meet the electricity network of HHM HHM total electricity demand during the arrest, planning together.

Preparation of reserve gas turbine power plant feasibility study - Contract award on

MVM Paks II. Atomerőmű Fejlesztő Zártkörűen Működő Részvénytársaság (MVM Paks II. Zrt.) | Published December 28, 2015
cpvs
71241000

Subject: Preparation of a feasibility study of reserve gas turbine power plant Volume: The tests determined necessary to fit the blocks in the electric power system and system-level regulatory spare transmission network improvements. However, a significant expansion of capacity is required for the tertiary reserve, as the reserve for tertiary basically be adapted to the area's largest performance machine control unit. The primary purpose of installing gas turbine power plant, the Operating Rules (Mekhi 904/2015) 5.1.9. Directive (B), point (g), and the "Directive 132 kV or connecting higher voltage mains power to establish and connect" 6.8 Chapter provided for in the new nuclear power plant unit for "external voltage-free (so-called. Dark, black-start) Implementation start capabilities "of gas turbine modules help. Additional Responsibilities gas turbine power plant and the nuclear power plant units to ensure an independent, external backup power supply for the system-level and tertiary reserve capacity to ensure control. Therefore, when because of the new nuclear power plant units is required in new facilities and létesítménybővítések presentation of the network, investments related to spare no guarantee can be ignored. In January 2014 the birth of Hungarian-Russian Intergovernmental Agreement (act. II 2014) as a result and due to time occurred during transmission network upgrades became necessary to complete decision-support in 2012 a feasibility study to update aimed at the way the new nuclear power plant units network connection, further clarification of the technical parameters of the transmission network improvements. The tasks to be carried out a feasibility study for the establishment of a gas turbine final version of the aforementioned decision preparing a feasibility study should be arranged. Under the contract with the successful tenderer as contractor must perform the following tasks: documentation needed to prepare a feasibility study on the installation of the gas turbine power plant in identifying, structuring, the need for supply, or the scope of other data definition and their acquisition, as well as carrying out the necessary surveys. Feasibility study of the Contractor for the new units feasibility study should prepare the following main features taken into account regarding the installation of a gas turbine power necessary network connection to the transmission grid improvements include: Insurance Insurance Insurance • Tertiary reserve • Black start capability • Independent tartalékbetáplálás the new nuclear power plant units for • Ensuring selected on the basis of two pieces of network performance testing unit block

Unit 1 No. 2. low-pressure turbine rotors 5 átlapátozása of degree - Invitation to tender

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 6, 2017  -  Deadline April 5, 2017
cpvs
51133000

Unit 1 No. 2. low-pressure turbine rotors 5 átlapátozása of degree - Invitation to tender

Replacement Unit 2 low-pressure turbine rotor blades of degree 5 - Call for participation - Public Services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 30, 2016  -  Deadline April 14, 2016
cpvs
51133000

Replacement Unit 2 low-pressure turbine rotor blades of degree 5 - Call for participation - Public Services

Eljárástmegindító notice - Delivery Bakonyi Power Plant Gas Turbine air filter houses closing speed doors

MVM GTER Gázturbinás Erőmű Zártkörűen Működő Részvénytársaság (MVM GTER Zrt.) | Published September 14, 2015  -  Deadline September 22, 2015
cpvs
42113300, 42961000, 44221300, 45223210, 45311000

Delivery Bakonyi Power Plant Gas Turbine air filter houses closing speed doors

Eljárástmegindító notice - Delivery Bakonyi Power Plant Gas Turbine air filter houses closing speed doors

MVM GTER Gázturbinás Erőmű Zártkörűen Működő Részvénytársaság (MVM GTER Zrt.) | Published August 28, 2015  -  Deadline September 7, 2015
cpvs
42113300, 42961000, 44221300, 45223210, 45311000

Delivery Bakonyi Power Plant Gas Turbine air filter houses closing speed doors

turbine works

Mátrai Erőmű ZRt. | Published August 16, 2012  -  Deadline September 12, 2012
cpvs
45315200, 45321000, 45453000

:Vállalkozási szerződés, Mátrai Erőmű ZRt 1-1 db. IV-V. helyszámú Láng-BBC gyártmányú D3YTT 2G 350 típusú 232 MW névleges teljesítményű gőzturbina ciklikus (7 éves) főjavítása”, az ajánlattételi dokumentációban részletezett és a tárgyalások során véglegesített feltételekkel.

Parts of steam turbines

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published May 4, 2016
cpvs

Steam turbine parts

Reserve gas turbine power plant in the framework of the preparation of the feasibility study work contract - Contract award procedure

MVM Paks II. Atomerőmű Fejlesztő Zártkörűen Működő Részvénytársaság (MVM Paks II. Zrt.) | Published March 16, 2017
cpvs
71241000

Reserve gas turbine power plant in the framework of the preparation of the feasibility study work contract - Contract award procedure

Unit 1 No. 2 low-pressure turbine rotor blades 5. Gradation deliveries - a notice for preliminary transparency Volunteer

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published March 31, 2017
Winner
PAO Turboatom
cpvs
42113100

Unit 1 No. 2 low-pressure turbine rotor blades 5. Gradation deliveries - a notice for preliminary transparency Volunteer

Replacement Unit 2 low-pressure turbine rotor blades of degree 5 - Contract award notice - Public Services

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published October 17, 2016
Winner
General Turbo S.A.
cpvs
51133000

Replacement Unit 2 low-pressure turbine rotor blades of degree 5 - Contract award notice - Public Services

Unit 2 low-pressure turbine rotor blades and reserves rank fifth in the manufacture of blades - Information on the amendment of the contract

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published May 4, 2016
Winner
PAO Turboatom
cpvs
42113100

Unit 2 low-pressure turbine rotor blades and reserves rank fifth in the manufacture of blades - Information on the amendment of the contract

Unit 1 No. 2 low-pressure turbine rotor blades Delivery stage 5 - Results of the procedure

MVM Paksi Atomerőmű Zártkörűen Működő Részvénytársaság | Published May 3, 2017
Winner
PAO Turboatom
cpvs
42113100

Unit 1 No. 2 low-pressure turbine rotor blades Delivery stage 5 - Results of the procedure

HHM operating in the territory of 24mW K1490-inch steam turbine mechanical maintenance, repair

Fővárosi Közterület-fenntartó Zártkörűen Működő Nonprofit Részvénytársaság | Published August 10, 2015
Winner
Siemens, s.r.o., Siemens, s.r.o., odštěpný závod Industrial Turbomachinery
cpvs
50000000

Entrepreneurship within the framework of the framework agreement operated by the non-profit FKF Zrt. Waste Recovery Plant operating 24 MW steam turbine mechanical maintenance and repair.

wind turbine generators

Óbudai Egyetem | Published August 10, 2012
Winner
NT-INVEST Kft. Szent István utca 32. 4244 Újfehértó HUNGARY E-mail: gabor.nyilas@iparivezerles.hu Telephone: +36 704547974
cpvs
31121330

Szállítási szerződés az alábbi berendezésekre: 50 kW-os szélgenerátorok mérésére alkalmas, variálható mérőpad szállítása, 3 fázisú (3 x 20 kVA-os) vezérelhető RLC műterhelés szállítása, 55 kW/400V-os, speciális, kalickás forgórészű aszinkron meghajtó motor szállítása és fékpadra szerelése, Szélerőmű generátor 1. (Háromfázisú, 50 kVA-os, csúszógyűrűs, 500 V forgórész feszültségű aszinkron generátor rotor és hálózat oldali 4/4 negyedes áramirányítókkal) szállítása és illesztése a fékpadhoz, Szélerőmű generátor 2. (Háromfázisú, 40 kW-os, állandó mágnes gerjesztésű szinkron generátor szállítása és illesztése a fékpadhoz, Négynegyedes, kisfeszültségű hálózatba visszatápláló, 55 kW-os hajtás, Háztartási méretű kiserőmű generátor 3. (HMKE, 50 kVA-es háromfázisú gerjesztett szinkron generátor feszültségszabályozóval) szállítása és illesztése a fékpadhoz, A napcella mező (PV) szimulációt végző szabályozható, 600 V-os DC tápegység szállítása, Négynegyedes, kisfeszültségű hálózatba visszatápláló, 45 kW-os hajtás szállítása, 600 V-os intelligens akkumulátortöltő szállítása, Akkumulátorok (12 V, 55 Ah) szállítása, Kapcsolódó szolgáltatás, terepi mérések.