Parts of steam turbines

EDF | Published July 30, 2016
cpvs
42113100

Supply of 2 sets of BP diaphragms N4 main turbine.

Design and implementation of a power of 12 mw gas turbine combined with a recovery boiler for EMU in Metz

uem | Published July 13, 2015  -  Deadline July 30, 2015
cpvs
42112300

design and construction of a 12 MW gas turbine combined with a recovery boiler.

Removing material turbine Martigues 1 parts

EDF | Published May 17, 2014
cpvs
45315200

Dépose de matériels turbine Martigues 1 pour pièces de rechange

Turbine supply installation and operation and maintenance agreement.

EDF EN France | Published November 19, 2013
cpvs
31121320

Turbine supply installation and operation and maintenance agreement.

16S0029 | Market for the acquisition and delivery of a professional front mower with rear grass catcher, centralized turbine, diesel version, and with mulching kit

MAIRIE D'HENNEBONT | Published November 17, 2016  -  Deadline December 5, 2016
cpvs

Market for the acquisition and delivery of a professional front mower with rear grass catcher, centralized turbine, diesel version, and with mulching kit

Work to set up a Rankine Organic Cycle turbine on the incineration furnace of the Béziers wastewater treatment plant

Cte d'agglo beziers mediterranee | Published November 27, 2017  -  Deadline December 21, 2017
cpvs
42112000

Number of the consultation: 2017044 Work for the installation of a Rankine Organic Cycle turbine on the incineration furnace of the Béziers wastewater treatment plant

Gas turbines

UEM | Published July 16, 2015  -  Deadline July 30, 2015
cpvs
42112300

Design and construction of a 12 MW gas turbine combined with a recovery boiler.

Opening & closing OA turbine GTA-Chine 1.

EDF | Published October 4, 2013
cpvs
45315200

Ouverture & fermeture OA turbine GTA-Bouchain 1.

Turbine works

EDF | Published February 11, 2015
cpvs
45315200

Rénovation des corps BP (turbine à vapeur 250 MW Rateau Schneider) ex MAR2 pour CCG MAR5&6.

MATERIALS PROGRAM 2017 - ROAD EQUIPMENT SUPPLY NEW AND OPPORTUNITIES: VANS 2 SHEETS 2 TRACTOPELLE AND TURBINE SIDE 1. DEPARTMENT OF CANTAL

Conseil departemental du cantal | Published February 15, 2017  -  Deadline March 8, 2017
cpvs

MATERIALS PROGRAM 2017 - ROAD EQUIPMENT SUPPLY NEW AND OPPORTUNITIES: VANS 2 SHEETS 2 TRACTOPELLE AND TURBINE 1 SIDE

Work to install a Rankine organic cycle turbine on the incineration furnace at the Béziers wastewater treatment plant

Cte d'agglo beziers mediterranee | Published July 28, 2017  -  Deadline September 14, 2017
cpvs
42112000

Number of the consultation: 2017024 Work for the installation of a turbine at Rankine's Organic Cycle on the incineration furnace of the Béziers wastewater treatment plant

Expertise turbine components MAR2, Loire3 / 4, and TPA COR1 COR1

EDF | Published November 22, 2013
cpvs
45315200

Expertise composants turbine MAR2, Loire3/4, COR1 et TPA COR1

Turbine works

EDF AAI Val-de-Loire | Published September 29, 2017
cpvs
45315200, 31130000

This qualification system covers the following areas:

- design studies,

- factory repairs,

- on-site operations (including non-destructive testing),

- manufacture of spare parts for turbines and generators of EDF's thermal power plants in France with a capacity greater than or equal to 250 MW as well as turbine turbine pumps.

It concerns the following materials or activities:

- the turbine bodies,

- turbo-fuel pumps,

- the bearings,

- the admission organs,

- auxiliaries (lubrication pump, regulation, lifting, ...),

- the control of the fins,

- non-destructive examinations,

- alternators,

- the exciter.

The technologies concerned are:

For the turbines: 250 MW EMC, 250 MW Alstom, 250 MW rake, 600 MW rake, 600 MW Alstom, Q 600 Alstom, 700 MW EMC.

For the alternators: 250 MW Jeumont, 250 MW EMC, 250 MW Alstom, 600 MW Jeumont, 600 MW Alstom, Q600 Alstom, 700 MW EMC.

Repair and maintenance services of electrical machinery, apparatus and associated equipment

SHEM | Published December 12, 2015  -  Deadline December 22, 2015
cpvs
50532000

SHEM is calling for applications to achieve the partial renovation of the Francis type turbine of St. Peter Marèges in order to correct the disorders that represent a risk to the sustainability of the operation of short or medium-term group.

Hydraulic turbines

GRET — professionnels du développement solidaire | Published March 9, 2017
cpvs
42112200

This is to ensure the design, manufacture, delivery to site, erection, testing and commissioning of the first (1) turbine-generator (350 kW) and production equipment hydroelectric project Sahatona . It is expected from the supplier to make the project benefit the acquisition of production equipment (turbine-generator group, related and ancillary services) most cost effective and best quality / price ratio.

Specifically, there is supply, deliver, install and commission:

1. The automatic safety valve.

2. The connecting pipe with turbine.

3. The turbine (350 kW).

4. The generator.

5. The instrument control and command and control.

6. Options: flywheel, ... suction duct.

Hydraulic turbines

Gret — Professionnels du développement solidaire | Published May 19, 2017  -  Deadline July 17, 2017
cpvs
42112200

This is to ensure the design, manufacture, delivery, assembly, testing and commissioning of the turbine generator and production equipment of the Sahatona hydroelectric project in accordance with the market clauses.

The project involves supplying, delivering, installing and commissioning the Sahatona hydroelectric site, Sahatona Rural Commune - Upper Matsiatra / Madagascar Region:

1: the automatic safety valve;

2: the connecting pipe with turbine;

3: the turbine (350 kW);

4: the generator;

5: the control-command and control panel;

6: options: flywheel, suction line ...

The supplier is expected to provide the client with the most cost-effective and cost-effective production equipment (turbine generator, related and ancillary equipment).

Hydraulic turbines

Gret — professionnels du développement solidaire | Published October 6, 2017
Winner
Hydro Power Plant
cpvs
42112200

The aim is to ensure the design, manufacture, delivery, assembly, testing and commissioning of the turbine generator (350 kW) and the production equipment of the project in accordance with the market clauses Sahatona hydroelectric power station.

The supplier is expected to provide the owner with the most cost-effective and cost-effective acquisition of production equipment (turbine generator, related and ancillary equipment).

Specifically, it is to supply, deliver, install and commission:

1: the automatic safety valve.

2: the connecting pipe with turbine.

3: the turbine.

4: the generator.

5: the control-command and control panel.

6: Options: flywheel, suction line ....

Turbine works

EDF | Published June 16, 2015
cpvs
45315200

Projet Charbon 2035 lot 3: Expertise et remise en état en usine des éléments de la ligne d’arbre issus de la turbine de Cordemais 5.

Turbine works

EDF | Published February 11, 2015
cpvs
45315200

Rénovation de deux rotors basse pression BP12 et BP34 (hors ailettes 6 et 6 bis) déposés de la turbine 250MW Rateau Schneider de Martigues 2.

Market for maintenance turbine Unit 3 of the NPP CRUAS.

EDF | Published October 11, 2014
cpvs
09300000

Marché pour la maintenance turbine tranche 3 du CNPE de CRUAS.