Public tenders for turbine in Finland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Kouvola B Fuel Governor upgrade for PGT10DLN Gas Turbine

Gasum Oy | Published February 23, 2017  -  Deadline March 15, 2017
cpvs
42960000

Limited company (Ltd. or Plc.) Or equal in KOMPA project the automation systems of the Kouvola B will be upgraded. The present Unit Control System (UCS) of the gas turbine (type PGT10DLN) driven compressor unit will be Replaced with a new FG system and major part of the unit level auxiliary and valve control functions residing now in the UCS will be Transferred to the existing Station Control System (SCS), Which will be extended. The new FG will be integrated with the SCS and to the existing compressor Antisurge System and site Load Sharing System for Tendering The subject is Gasum Oy Kouvola Compressor Station B (Kouvola B) Gas Turbine Fuel Governor (FG). In KOMPA project the automation systems of the Kouvola B will be upgraded. The present Unit Control System (UCS) of the gas turbine (type PGT10DLN) driven compressor unit will be Replaced with a new FG system and major part of the unit level auxiliary and valve control functions residing now in the UCS will be Transferred to the existing Station Control System (SCS), Which will be extended and the maximum: 5 requirements in the contract documents specified in accordance with the Limited company (Ltd. or Plc.) or equal

Steam turbines

Lahti Energia Oy | Published December 6, 2016  -  Deadline December 21, 2016
cpvs
42112100, 42112000

KYVO3 project will be executed in two phases. In the first phase a circulated fluidized bed (CFB) boiler and flue gas condensing plant will be built for heat production. The boiler fuel input is approximately 170 MJ/s and the primary fuels will be forest residue, milled peat and coal. The first phase of the project will be in commercial operation in 2019.

In the second phase in accordance of electricity market development the plant will be supplemented with a 55 MWe CHP steam turbine plant. The new turbine is planned to be in commercial operation in 2021.

This procurement concerns a steam turbine plant described in more detailed in the Inquiry and its appendices.

This procurement concerns a 55MWe Steam Turbine Plant of KYVO3 project. The Steam Turbine Plant concept is based on district heating with two DH exchangers. The turbine shall have provision for a condensing tail (option). The Steam Turbine Plant will be installed in the existing turbine hall, where it will replace Kymijärvi I turbine. It is planned to be in commercial operation in 2021. Inquiry and its appendices specifies the procurement of the Steam Turbine Plant in more detail.

PROJECT IP TURBINE FOR RETORFIT NAANTALI 3

Turun Seudun Energiantuotanto Oy | Published December 3, 2014
Winner
Doosan Skoda Power
cpvs
50532300

This Agreement is in the case of Naantali power plant unit number three on the improvement of the steam turbine.

Turbine equipment

Fingrid Oyj | Published October 1, 2016
Winner
HPI Energy Service Ltd
cpvs
42112400, 42122180, 45351000

Contract consists of twelve (12) Rolls-Royce Avon 1533-75L fuel system retrofits, safety related systems and spare parts. Supply covers all designs, official approvals, equipment and devices, installations, testing, inspections and any other performance, required to carry out a complete Supply.

KYVO3 Steam Turbine Plant

Lahti Energia Oy | Published December 5, 2016  -  Deadline December 21, 2016
cpvs
42112100

Is defined in inquiry/contract This procurement concerns a 55MWe Steam Turbine Plant of KYVO3 project. The Steam Turbine Plant concept is based on district heating with two DH exchangers. The turbine shall have provision for a condensing tail (option). The Steam Turbine Plant will be installed in the existing turbine hall, where it will replace Kymijärvi I turbine. It is planned to be in commercial operation in 2021. Inquiry and its appendices specifies the procurement of the Steam Turbine Plant in more detail. KYVO3 project will be executed in two phases. In the first phase a circulated fluidized bed (CFB) boiler and flue gas condensing plant will be built for heat production. The boiler fuel input is approximately 170 MJ/s and the primary fuels will be forest residue, milled peat and coal. The first phase of the project will be in commercial operation in 2019. In the second phase in accordance of electricity market development the plant will be supplemented with a 55 MWe CHP steam turbine plant. The new turbine is planned to be in commercial operation in 2021. This procurement concerns a steam turbine plant described in more detailed in the Inquiry and its appendices. tai suunniteltu vähimmäismäärä:3ja enimmäismäärä:3 Vaatimukset hankintaa koskevissa asiakirjoissa määritetyn mukaisesti Is defined in inquiry/contract

KYVO3 Steam Turbine Plant

Lahti Energia Oy | Published September 13, 2017
cpvs
42112100

KYVO3 project will be executed in two phases. In the first phase a circulated fluidized bed (CFB) boiler and flue gas condensing plant will be built for heat production. The boiler fuel input is approximately 170 MJ/s and the primary fuels will be forest residue, milled peat and coal. The first phase of the project will be in commercial operation in 2019. In the second phase in accordance of electricity market development the plant will be supplemented with CHP steam turbine plant. The new turbine is planned to be in commercial operation in 2021. Procurement consist of the Steam Turbine Plant with auxiliary equipment. The Steam Turbine Plant will be installed in the existing turbine hall, where it will replace Kymijärvi I turbine. KYVO3 project will be executed in two phases. In the first phase a circulated fluidized bed (CFB) boiler and flue gas condensing plant will be built for heat production. The boiler fuel input is approximately 170 MJ/s and the primary fuels will be forest residue, milled peat and coal. The first phase of the project will be in commercial operation in 2019. In the second phase in accordance of electricity market development the plant will be supplemented with CHP steam turbine plant. The new turbine is planned to be in commercial operation in 2021.

IP-Turbine repair at Naantali Power Plant Unit 3 (315 MW).

Turun Seudun Energiantuotanto Oy | Published December 3, 2013  -  Deadline December 16, 2013
cpvs
50532300

Turun Seudun Energiantuotanto Oy will carry out an IP-turbine repair to Naantali Power Plant Unit 3Turbine for its intermediate pressure segments. Turbine is originally manufactured by Kraft Werk Union AG, it has three chambers, it is equipped with reheat superheater and modified for district heating production. It's type is: KW Naantali, Ma 3 KIII/125021 a/ ZU. Repair will be done in Power Plant's summer revision in 2015 and Turbine shutdown has preliminary been planned to be carried out between 1.5.2015 and 30.9.2015. Prepare for repair will be done before it. If you are interested to participate to tendering, please leave your application by 13.12.2013 at 12:00 Finnish time to email address: sakari.mikkola@tset.fi In the application please inform the following: 1. Participating company's official name and ID number. 2. Main references from Turbine overhauls > 50 MW in EU-countries from recent years. 3. Company Financial Statements from the last 3 fiscal years. 4. Contact information (contact person and e-mail address) where to deliver the offer request. Offer request will be delivered to accepted applicants by the end of December. From 2 to 3 Suppliers which have given competitive offer will be asked for further negotiations.

Turbine major overhaul

Fortum Power and Heat Oy | Published July 1, 2013  -  Deadline August 5, 2013
cpvs
50532300

Fortum Power and Heat Oy, operating and maintaining its jointly owned TSE-Naantali Oy's Power Plant in Naantali, will carry out a major overhaul to Power Plant's 3rd production unit's Turbine for its high pressure and low pressure segments. Turbine is originally manufactured by Kraft Werk Union AG, it has three chambers, its equipped with intermediate superheater and modified for district heating use. It's type is: KW Naantali, Ma 3 KIII/125021 a/ ZU. Turbine overhaul will be done in Power Plant's summer revision in 2014 which has preliminary been planned to be carried out in 10 weeks between 12.5.2014 and 21.7.2014 If you are interested to participate to tendering, please leave your application by 5th of August 2013 at 12:00 Finnish time to petteri.malinen@fortum.com and marika.aaltonen@fortum.com In the application please inform the following: 1. Participating company's official name and ID number 2. Main references from Turbine overhauls from recent years 3. Contact information (contact person and e-mail address) where to deliver the offer request. Offer request will be delivered to accepted applicants at 12th of August and dead line for the offers will be 15th of September. Suppliers which have given competitive offer will be asked for further negotiations.

Adour engines, the turbine guide vanes

Puolustusvoimien logistiikkalaitoksen esikunta | Published May 11, 2016
Winner
Rolls-Royce plc
cpvs
35610000

supply the Adour engine turbine guide vanes.

Repair and maintenance services of generators

Fortum Power and Heat Oy | Published July 4, 2013  -  Deadline August 5, 2013
cpvs
50532300

Fortum Power and Heat Oy, operating and maintaining its jointly owned TSE-Naantali Oy's Power Plant in Naantali, will carry out a major overhaul to Power Plant's 3rd production unit's Turbine for its high pressure and low pressure segments. Turbine is originally manufactured by Kraft Werk Union AG, it has three chambers, its equipped with intermediate superheater and modified for district heating use. It's type is: KW Naantali, Ma 3 KIII/125021 a/ ZU. Turbine overhaul will be done in Power Plant's summer revision in 2014 which has preliminary been planned to be carried out in 10 weeks between 12.5.2014 and 21.7.2014 If you are interested to participate to tendering, please leave your application by 5th of August 2013 at 12:00 Finnish time to petteri.malinen@fortum.com and marika.aaltonen@fortum.com In the application please inform the following: 1. Participating company's official name and ID number 2. Main references from Turbine overhauls from recent years 3. Contact information (contact person and e-mail address) where to deliver the offer request. Offer request will be delivered to accepted applicants at 12th of August and dead line for the offers will be 15th of September. Suppliers which have given competitive offer will be asked for further negotiations.

Adour engines, the turbine guide vanes

Puolustusvoimien logistiikkalaitoksen esikunta | Published May 11, 2016
cpvs

supply the Adour engine turbine guide vanes.

Martinlaakso the gas turbine start-up device Reform

Vantaan Energia Oy | Published July 28, 2014
cpvs
51000000

Existing gas turbine start-up device Modernization

Martinlaakso the gas turbine start-up the machine reform.

Vantaan Energia Oy | Published November 26, 2013  -  Deadline December 9, 2013
cpvs
51000000

Existing gas turbine modernization of the boot device.

Olkiluoto gas turbine plant operation and maintenance services

Fingrid Oyj | Published May 21, 2017
Winner
TVO Nuclear Services Oy
cpvs
65410000

the subject of the contract is the Olkiluoto gas turbine plant required for the operation and maintenance services, installation and maintenance of infrastructure services, as well as now 24/7 monitoring and security. the subject of the contract is the Olkiluoto gas turbine plant required for the operation and maintenance services, installation and maintenance of infrastructure services, as well as now 24/7 monitoring and security. the subject of the contract is the Olkiluoto gas turbine plant required for the operation and maintenance services, installation and maintenance of infrastructure services, as well as now 24/7 monitoring and security.

Kouvola B Fuel Governor upgrade for PGT10DLN Gas Turbine

Gasum Oy | Published August 10, 2017
cpvs
42960000

Gasum oy Kouvola Compressor Station B (Kouvola B) Gas Turbine Fuel Governor (FG). In Kompa project the Automation systems of the Kouvola B will be upgraded. The present Unit Control System (UCS) of the gas turbine (type PGT10DLN) driven compressor unit will be replaced with a new FG system and major part of the unit level auxiliary and valve control functions residing now in the UCS will be transferred to the existing Station Control System (SCS), which will be extended. The new FG will be integrated with the SCS and to the existing compressor Antisurge System and site Load Sharing System. Gasum oy Kouvola Compressor Station B (Kouvola B) Gas Turbine Fuel Governor (FG).

Repair and maintenance services of generators

Turun Seudun Energiantuotanto Oy | Published December 6, 2014
Winner
Doosan Skoda PowerCZ49193864Tylova 1/57Plzeň 301 28 doosanskodapower@doosan.com +420 378185000 www.doosan.com
cpvs
50532300

This Agreement is in the case of Naantali power plant unit number three on the improvement of the steam turbine.

Helsinki Energy's Vuosaari B power plant gas turbines and a steam turbine protection and synchronization system with auxiliary equipment, steam turbine generator magnetized medium voltage switchgear as well as protection systems.

Helsingin Energia | Published November 9, 2013
Winner
Siemens Osakeyhtiö01 13901-2Majurinkatu 6Espoo 02600 +358 105115151 www.siemens.fi
cpvs
31000000

Vuosaari B power plant, gas turbine and steam turbine protection and synchronization system with auxiliary equipment, steam turbine generator magnetized medium voltage switchgear and protection systems.

The turbine generator shaft rotation Hardware Update Forssa reserve power plant

Fingrid Oyj | Published June 1, 2017
Winner
Siemens AG
cpvs
42112410

the subject of the contract is the Forssa reserve power plant, a gas turbine generator to the axis of rotation of the hardware upgrade. the subject of the contract is the Forssa reserve power plant, a gas turbine generator to the axis of rotation of the hardware upgrade. The delivery includes updated equipment and systems engineering, supply, installation, commissioning and final documentation and related materials procurement, transport and installation of the necessary supplies and aputöineen complete, as checked, the deployed and their receipt. the subject of the contract is the Forssa reserve power plant, a gas turbine generator to the axis of rotation of the hardware upgrade.

OsCommerce Voima Oy, commercial power plant steam turbine plant.

Tammervoima Oy | Published September 17, 2013
Winner
MAN Diesel & Turbo SE
cpvs
42112000

This acquisition is the case of commercial power plant steam turbine purchase.

HN fighter fleet Air turbine test bench purchase.

Puolustusvoimat / Ilmavoimien Materiaalilaitos | Published December 12, 2013
Winner
Patria Aviation OyLentokonetehtaantie 335600 Halli
cpvs
35600000

HN fighter fleet air turbine test bench purchase.