Spare Titan 130 Solonox Gas turbine.

Maersk Olie og Gas A/S | Published September 23, 2014
Winner
Solar Turbines EuropeAvenue Des Etats Unis 1 GosseliesGosselies 6041 minaud_jean-baptiste@solarturbines.com +32 71253077 +32 71253055
cpvs
42112300

Titan 130 -20502S Gas Turbine Engine including GP, PT and AGB.

Turbine installations

Maersk Olie og Gas A/S | Published November 28, 2017
Winner
Nuovo Pignone Intl. S.R.L
cpvs
42112000, 42112300

The Specification sets forth requirements for the design, manufacture, testing, documentation and certification of gas turbine driven main power generator units (package).(3 off).

The PACKAGE shall be dry low NOx dual-fuel Gas Turbine driven generators with minimum 60MW electrical power at ISO conditions as 100 % load.

Configuration/Duty will be:

3 x 50 % (2 running/1 stand-by) with minimum 30MWe per Power Generation package COMPANY will install a Power Management System capable of sharing both the active and reactive effect between the running generators including the emergency generators.

The power management will handle all synchronisation of the generator circuit breakers as well as de-loading and disconnection.

The PACKAGE will supply main power to the platform complex through connection to main 11KV switchgear.

Emergency Generators/power will be delivered separately and is not part of this technical specification.

Key figures for the three (3) identical generators are:

— Generator. 11kV, 50Hz

— Fuel. Natural gas and/or marine diesel.

Lot M4: Steam turbine, Generator and District Heating Systems

Hofor Energiproduktion A/S | Published August 12, 2016
cpvs
42110000, 42112000

Lot M4: Steam turbine, Generator and District Heating Systems.

Overhaul of 5 EA Power Unit, Gas turbine Engine

Forsvaret og Forsvarsministeriets Styrelser | Published June 14, 2016  -  Deadline June 27, 2016
cpvs
34710000

Overhaul of 5 EA Power Unit, Gas turbine Engine

Turbine equipment

Dong Energy Thermal Power A/S | Published September 21, 2013  -  Deadline October 9, 2013
cpvs
42112400, 42112410, 42113100, 42112100

Turbine equipment

Turbine installations

AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune | Published January 11, 2014  -  Deadline January 16, 2014
cpvs
42112000, 42112100, 42112400, 31124100, 42511100, 42912300

Turbine installations

16/11141 - Tender conditions for tender procedure concerning procurement of Turbine Meters

Energinet.dk | Published September 1, 2016  -  Deadline September 16, 2016
cpvs
09211300, 42123100

Tender conditions for tender procedure concerning procurement of Turbine Meters.

The Contracting Entity wants to purchase one frame work agreement of new Turbine Meters and renovation hereof.

HIA steam turbine major overhaul to Skaerbaek Power Plant.

Dong Energy Thermal Power A/S | Published September 12, 2013  -  Deadline October 9, 2013
cpvs
42112400, 42112410, 42113100, 42112100

The contract will cover the complete overhaul of the high pressure and (assymetric) intermediate pressure turbine cylinders, see below in Section II.2.1 re Scope of the Contract. The 416 MW GEC Alstom 5-cylinder steam turbine was commissioned in 1998 with ca 100000 operationg hours. It is a double re-heat system operating a live steam pressure of 290 bar and 580 ° C. The live steam flow is 270 kg / s

Tender conditions for tender procedure concerning procurement of Turbine Meters

Energinet.dk | Published September 1, 2016  -  Deadline September 16, 2016
cpvs
09211300

The Contracting Entity wants to purchase one frame work agreement of new Turbine Meters and renovation hereof. The deadline for submission of tenders will be: 16 September 2016 hours 12:00.

Execution of borescope inspection and replacement of number 2 main bearing on gas turbine

Energi Viborg Kraftvarme A/S | Published February 27, 2017  -  Deadline March 27, 2017
cpvs
51133100, 71335000, 42113300

In connection with the examination of Energi Viborg Kraftvarme A/S' ("Energi Viborg") gas turbine in June 2017, Energi Viborg wishes to receive tenders for the execution of 1) a borescope inspection and 2) replacement of number 2 main bearing on a gas turbine.

The contract is in force for the period 7 June 2017 until 21 June 2017.

The contract comprises an option for alignment of the gas turbine unit in continuation of the replacement of number two bearing. After bearing number two has been replaced, Energi Viborg will inform the Supplier in writing of whether Energi Viborg chooses to exercise the option. In this case, the Suppplier must perform the option within the period June 22 2017 to June 25 2017.

Negotiated procedure of Wind Turbine Blade Testing for DTU Wind Energy

Danmarks Tekniske Universitet - DTU | Published July 11, 2016  -  Deadline August 8, 2016
cpvs
42100000

Technical University of Denmark (DTU) is establishing a completely new test facility for testing large structures with focus on wind turbine blades. The Danish Building and Property Agency (Bygningsstyrelsen) is building owner and finances the new building that will house the new test facili-ties, including reaction blocks and strong floor. The project includes a new 1600 m2 hall with three test stands capable of testing 45m, 25m and 15m blades. Inside the test hall a staff building will be constructed. The staff building will be two stories high and will contain control room, workshop, depots, visitor center and various service facilities. The new test facilities will focus on static and fatigue tests of wind turbine blades. The vision is to establish a unique facility of the highest international standard for research in strength and fatigue of wind turbine blades exposed to complex loading. New advanced test methods will be developed and the research will aim at establishing a better understanding of failure in these large structures. For this new facility DTU is in need of advanced static and fatigue testing solutions for 15 and 45 m wind turbine blades. The total contract value is fixed at 13.000.000 DKK, VAT not included. The con-tract value is inclusive of customs, duties, and all expenses on the part of the contractor. The contract value also comprises the Tenderers fixed price products and services until the static and fatigue testing solutions are delivered, installed, tested and put into operation.

Biomass-fired CHP plant in Lisbjerg, Steam turbine and generator plant

AffaldVarme Aarhus, Teknik og Miljø, Aarhus Kommune | Published December 14, 2013  -  Deadline January 16, 2014
cpvs
42112000, 42112100, 42112400, 31124100, 42511100, 42912300

The Purchase includes a steam turbine and generator plant including auxiliary equipment, feed water and condensate preaheaters, feed water tank, districtictheat exchangers, bypass district heat exchanger and water treatment plant. Steam conditions will be 540 C / 110 Bar. Capacity approx. 33 MWe. The Purchase includes design, manufacturing, supply, installation, testing and commissioning.

Contract for Major Overhaul of Steam Turbine.

Vordingborg Kraftvarme A/S | Published April 18, 2015
cpvs
50500000, 45315200, 42113000

Contract for Major Overhaul of Steam Turbine.

HEV Steam Turbine and Generator Overhaul.

Dong Energy Thermal Power A/S | Published August 10, 2013
Winner
TMS Turbomaschinenservice GmbHBruchstrasse 79aBad Dürkheim 67098
cpvs
42110000, 42112400, 42112410

The scope of work comprises a complete steam turbine and generator overhaul including inspection of turbine and generator stationary and rotating parts, NDT. Refurbishment of used components depending on findings and supply of new components may be required unless the parts are already in plant owner's stock.

Control equipment for turbine generator 2014 / S 023-037040

I/S Vestforbrænding | Published February 1, 2014
cpvs
31124200, 42113000, 31121331

Control equipment for turbine generator Rep. the main component of the turbine. As well as the new operating system.

Framework agreement for Gas Flow Meters (Turbine Meters)

Dong Energy Sales & Distribution A/S | Published August 20, 2013
cpvs
38551000

Framework agreement for Gas Flow Meters (Turbine Meters)

Steam turbines

Helsingør Kraftvarmeværk A/S | Published December 23, 2016  -  Deadline January 27, 2017
cpvs
42112100, 42112000

Helsingør Kraftvarmeværk A/S is operating a gas-fired combined cycle plant at the site of Energivej 19 in

Helsingør. A decision has been made to renew the existing plant by establishing a biomass-fired boiler at the

site.

The existing turbine condensers (district heating) to the existing steam turbine (combined cycle) will be utilised

for the new steam turbine. Only one steam turbine will be in operation at a time. It will not be possible to run

combined cycle plant and bio boiler plant in parallel. The combined cycle plant will mainly be used as a back-up.

The new biomass fired plant will consist of a boiler unit with flue gas cleaning and flue gas condensation. There

will be a power output of 62 MW (steam flow 20,8 kg/s). Nominal design data will be 500°C/64 bar(g).

The scope of the inquiry will cover a steam turbine, generator and gearbox within the specified battery limits.

The procurement consists of a complete steam turbine with necessary auxiliary systems. The steam turbine will be located in a new building adjacent to the existing combined cycle building.

The scope includes design, engineering, manufacturing, delivery and erection of all equipment and systems as well as the commissioning and final testing of the steam turbine. The scope also includes training of the Purchaser's staff as well as operation and maintenance instructions for the plant.

Wind Turbine Service for offshore wind farms in Denmark and Germany.

DONG Energy Wind Power A/S | Published January 22, 2016  -  Deadline February 8, 2016
cpvs
50530000, 31121330

DONG Energy has three offshore windfarms in Denmark with a total of 274 turbines. The three offshore windfarms are Anholt located off coast of Grenå, Horns Rev 2 located off coats of Esbjerg and Nysted located off coast of Gedser. DONG Energy is the O&M provider of the turbines but due to lack of internal resources there is a need for a third party service provider for ad hoc wind turbine service including bolt tensioning and replacement of major components.

One contract will be entered.

In the contract period Horns Rev 2 expects to require the service from approximately 1 April to 30 September. Other wind farms (some still under warranty and therefore operated by the turbine supplier) will require the service on ad-hoc basis.

Provision of services for DONG Energy windfarms in Germany (which are all still under construction or under warranty) will be included in the contract as as option which shall be mutual for both DONG Energy and the supplier. This option will not be included in the evaluation of the tenders.

In Denmark DONG Energy has the following turbines:

Siemens 2,3 MW VS turbines, 2,3 CS turbines and 3,6 MW turbines.

More information about DONG Energy Wind Power can be found here: http://www.dongenergy.com/en/business-activities/wind-power

turbine installations

Dong Energy Thermal Power A/S | Published September 1, 2012  -  Deadline October 4, 2012
cpvs
42112000, 42112400, 42112410

:The 89 MW BBC single cylinder steam turbine was commissioned in 1982. It operates at a live steam pressure of 115 bar at 525°C. The steam flow is 120 kg/s. It’s at back pressure turbine supplying district heating to the city of Herning. The generator is an air/water cooled BBC type wx18L-083LLT of 111 MVA/50Hz.

turbine installations

DONG Energy Thermal Power A/S | Published September 12, 2012
Winner
Turbocare Sp.zo.o ul Paprotna 12a 51-117 Wroclaw POLAND Internet address: www.turbocare.com
cpvs
42112000, 42112400, 42112410

:Major overhaul of AVV unit 1 steam turbine section MP2 and LP. Unit 1 was commissioned in 1990 and is a 262 MW BBC turbine with a steam pressure of 240 bar and steam temperature of 540 C running at 3000 RPM. It consist of a high pressure section, 2 medium pressure sections and a low pressure section. The work concerns the second medium pressure (IP2) section and the low pressure section (LP), both of which are with dual outlet with asymmetrical outlet pressures. The condenser pressure after the LP-section is 0,037 bar. There is only one radial bearing between each section of the turbine, and also between the LP and the generator.