Public tenders for turbine in Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Grosse Revision der Turbine 1

EGK Entsorgungsgesellschaft Krefeld GmbH & Co. KG | Published October 5, 2017
cpvs

Grosse Revision der Turbine 1

Renewal of the excitation device of the turbine 3

EGK Entsorgungsgesellschaft Krefeld GmbH & Co. KG | Published October 18, 2016
cpvs

Renewal of the excitation device of the turbine 3

Renewal of the excitation means of the turbine 4

EGK Entsorgungsgesellschaft Krefeld GmbH & Co. KG | Published October 18, 2016
cpvs

Renewal of the excitation means of the turbine 4

Sandbank TETRA Wind Turbine Tower Repeaters

Sandbank Offshore Wind GmbH | Published June 11, 2016
cpvs
76521000

Sandbank TETRA Wind Turbine Tower Repeaters.

Renewal of the rotor assembly to the turbine as

AWG Abfallwirtschaftsgesellschaft mbH Wuppertal | Published December 17, 2013
Winner
TMS Turbomaschinenservice GmbHBruchstraße 79aBad Dürkheim 67095
cpvs
42113000

Renewal of the rotor assembly of the existing turbine B, Brand AEG Kanis, built in 1975 (essentially: the turbine rotor, stator blade carrier with mounting, nozzle segment) with unchanged performance by maintaining the existing generator (20 MW) and transmission due to an increase of steam parameters at 35 bar ( g) and 385 ° C.

Prosthetics - Turbine

Handwerkskammer Ostwestfalen-Lippe zu Bielefeld | Published June 18, 2015  -  Deadline July 3, 2015
cpvs

Zahntechnik - Turbine

Sandbank TETRA Wind Turbine Tower Repeaters.

Sandbank Offshore Wind GmbH | Published November 24, 2015  -  Deadline December 22, 2015
cpvs
76521000

The Contractor(s) shall engineer, supply, install, configure, commission and service one TETRA repeater system in each of the 72 wind turbine towers at the Sandbank offshore wind-farm.

Overhaul of the engine 1 from the hydroelectric plant Eddersheim - turbine and generator

Wasser- und Schifffahrtsamt Aschaffenburg | Published May 18, 2016  -  Deadline June 21, 2016
cpvs

Overhaul of the engine 1 from the hydroelectric plant Eddersheim - turbine and generator

Wind turbine generators

RWE Innogy Nordsee 1 GmbH | Published April 12, 2014
cpvs
31121330, 31121320, 42112000, 51133000, 50000000

Wind turbine generators

New steam turbine, Los M1: turbine generator, gearbox, lubrication oil module, hydraulic station, control cabinets

AVG Abfallentsorgungs- und Verwertungsgesellschaft Köln mbH | Published September 12, 2014  -  Deadline October 15, 2014
cpvs
42112100

In the AVG Cologne produced in the waste steam boilers for the generation of electricity and district heating is used. In this case, the system was redundant systems used to maintain the operation of the system upright and on a scheduled or unscheduled failure of individual system components for large parts. Excluded from redundant construction are turbine, Luko and the subsequent water-vapor-section (incl. Ancillary facilities) to the feedwater tanks. To ensure the disposal and public service mission of the AVG event of a failure of one of the mentioned systems, a new power house to accommodate a new turbo set consisting of turbine and generator. and an additional air-cooled system with the necessary ancillary facilities built. The Luko is used to condense the exhaust steam from the steam turbine and is situated on the new engine house. The steam turbine has an electric power of approximately 30 MW. Commissioning and trial operation are scheduled for August 2016. The entire construction project is divided into the following lots: mechanical engineering, consisting of: - Los M1: turbine generator, gearbox, lubrication oil module, hydraulic station, control cabinets - Los M2: Luko and cooling tower including condensate system - Los M3: water-steam cycle and other Pipelines - Los M4: nacelle crane electrical engineering, consisting of: - Los E1: Electricity - Los E2: control construction consisting of: - Lot B1: Frame - Los B2: Construction - Los B3: Technical building equipment to M1: The turbo kit is for a steam flow rate of approximately 130 Mg / h. The steam parameters are 40 bar (a) and 400 ° C. The Abdampfparameter be 0.07 to 0.19 bar (a) and 39-59 ° C. In the one published here is solely for the qualification competition for Los M1, turbine generator, gearbox, lubrication oil module, hydraulic station, control cabinets.

Wasserkraftanlage Brombach: Turbine/ Generator

AggerEnergie GmbH, Alexander-Fleming-Str. 2, 51643 Gummersbach | Published July 15, 2014  -  Deadline August 20, 2014
cpvs

Wasserkraftanlage Brombach: Turbine/ Generator

Provision of Client Representatives and Quality Inspectors for wind turbine pre-assembly, installation and commissioning for the offshore windfarm Sandbank.

Sandbank Offshore Wind GmbH | Published October 23, 2015  -  Deadline November 19, 2015
cpvs
76520000, 98360000

The contract shall comprise the provision of specialists for quality control and site representation on behalf of the Client (SBOW) for wind turbine pre-assembly (Lot 1), for wind turbine installation (Lot 2) and for wind turbine completion and commissioning works (Lot 3). The specialists shall be required to act as Client Representatives (Reps.) and quality inspectors and ensure that the wind turbine contractor fulfils its obligations with respect to the applicable standards, contractual requirements as well as agreed work procedures and method statements, and to report back to the Client.

Wind Turbine Generator Quality Surveillance Services — Nacelle and Hub components

Vattenfall Europe Windkraft GmbH | Published January 27, 2017  -  Deadline February 24, 2017
cpvs
71631000

This ‘Wind Turbine Generator Quality Surveillance Services — Nacelle and Hub components’ tender concerns the provision of qualified Quality Surveillance services on site at WTG Nacelle, Hub, transformer-converter unit manufacturing/assembly facilities, or any facility where components making up such assemblies are manufactured (e.g. generators, gearboxes and bearings), including:

— Monitoring and reporting any HSE issues,

— Reviewing and monitoring Manufacturer's documentation, staff qualifications and competency, processes, quality control activities and the end product,

— Using Employer's tracking system to report any deficiencies with respect to compliance with the Turbine Supply Contract and other relevant requirements.

— Using the Employer's component tracking system to report the status/progress of each component.

Quality Control at the manufacturer is not required, but rather the manufacturer's own QA/QM/QC shall be inspected and assessed.

The manufacturing facilities will be located within Europe, mostly northern Europe. On occasion, travel further afield may also be required. In exceptional cases inspections may also take place at other points in the execution process of the WTG supplier, e.g. pre-assembly, installation, completion, commissioning.

Wind Turbine Generator Quality Surveillance Services — Foundations and Towers

Vattenfall Europe Windkraft GmbH | Published January 27, 2017  -  Deadline February 24, 2017
cpvs
71631000

This ‘Wind Turbine Generator Quality Surveillance Services — Foundations and Towers’ tender concerns the provision of qualified Quality Surveillance services on site at WTG tower and/or foundation fabrication, coating and outfitting facilities including:

— Monitoring and reporting any HSE issues,

— Reviewing and monitoring Manufacturer's documentation, staff qualifications and competency, processes, quality control activities and the end product,

— Using Employer's tracking system to report any deficiencies with respect to compliance with the Turbine Supply Contract and other relevant requirements.

— Using the Employer's component tracking system to report the status/progress of each component.

Quality Control at the manufacturer is not required, but rather the manufacturer's own QA/QM/QC shall be inspected and assessed.

The manufacturing facilities will be located within Europe, mostly northern Europe. On occasion, travel further afield may also be required. In exceptional cases inspections may also take place at other points in the execution process of the WTG supplier, e.g. pre-assembly, installation, completion, commissioning.

Turbine supply agreement for Duben.

Vattenfall Europe Windkraft GmbH | Published November 12, 2013  -  Deadline December 13, 2013
cpvs
31121320

The whole project consists of 9 to 11 Wind Turbine Generators (WTGs) incl. foundations, the necessary roads and hardstands, the cables incl. design, manufacturing and installation, as well as the substation, the fiber design, manufacturing and installation. Nine Wind Turbines will be located on a field, two Wind Turbines in a small forest area. The wind farm is located 93 km away from Berlin. The whole site area is 420 ha. This contract includes all required work for the supply of 9 to 11 Wind Turbine Generators, including foundations. This scope of work consists of the design, engineering, manufacturing, procurement, construction, setting out (according to locations provided by the Employer), delivery, installation, testing, commissioning, initial operation until Take Over and performance testing of the Wind Turbine Generator Units, their towers, foundations and the SCADA system. This contract notice includes also a Long Term Service Agreement (LTSA) for 15 years. Even though the (combined) contractual objects are divided into “supplies“ and “LTSA“ it is common practice in the industry sector to consider the economic efficiency as a whole. Therefore, the decision about the economically most advantageous solution in the tendering procedure will be based on the overall economic efficiency of a tender on both “supplies” and “LTSA”. Thus, a division into single lots would make no economic sense. Tender documents will provide further details on this. In order to display the accountability for each contractual part clearly, each contractual part, “supplies” on the one hand and “LTSA” on the other, shall be subject to one separate agreement as is common practice in the industry sector. It is possible to enter into two separate agreements with one company who offers both contractual parts in one. Likewise, it is possible, that in case of a respondent consortium, one or more members of the consortium assume the “supplies” whereas one or more members of the consortium assume the “LTSA”. The offering of both contractual parts in one agreement by one respondent shall be excluded. Likewise, the offering of merely one contractual part (e.g. “supplies”) while using a subcontractor for the other part (e.g. “LTSA”) shall also be excluded. The employer desires to select the responsible party directly and to enter into an agreement with such party by himself. The technical parameters for the requested WTGs are as follows: - Rotor Diameter min. 110 m and max. 130 m; - Capacity/WTG: (min.) 2 to (max.) 4 MW; - Height: 135 m to 165 m hub height; - Noise level max. 106,5 dB(A). Further details will be provided with the Invitation to Tender.

Lifting Supervisor services during wind turbine loading and installation.

EnBW Systeme Infrastruktur Support GmbH | Published November 22, 2013
cpvs
71700000

Lifting Supervisor services during wind turbine loading and installation

Subject of the contract(s) is the engineering, manufacturing, supply, on- and offshore logistics, and installation of wind turbine generator foundations (monopiles), transition pieces and scour protection

Trianel Windkraftwerk Borkum II GmbH & Co. KG | Published November 25, 2016
cpvs
45262426, 45240000, 45244000

Subject of the contract(s) is the engineering, manufacturing, supply, on- and offshore logistics, and installation of wind turbine generator foundations (monopiles), transition pieces and scour protection.

Steam turbines

AVG Abfallentsorgungs- und Verwertungsgesellschaft Köln mbH | Published February 11, 2015
Winner
TGM Kanis Turbinen GmbH
cpvs
42112100

In the AVG Cologne produced in the waste boilers steam to generate electricity and district heating is used. In this case, the system was redundant systems used to maintain the operation of the plant upright even with a planned or unplanned failure of individual system components for large parts. Excluded from the redundant configuration are turbine, Luko and the subsequent water-vapor-section (incl. Utilities and facilities) to the feedwater tanks. To ensure the disposal and supply contract AVG event of a failure of one of the systems mentioned, a new power house to accommodate a new turbo set consisting of turbine and generator. and an additional air-cooled system with the necessary ancillary facilities built. The Luko is used to condense the exhaust steam from the steam turbine and is situated on the new engine house. The steam turbine has an electric power of approximately 30 MW. Commissioning and trial operation are scheduled for August 2016. The entire construction project is divided into the following lots: mechanical engineering, consisting of: - Los M1: turbine with generator, gear, lubricating oil module, hydraulic station, control cabinets - Los M2: Luko and cooling tower including condensate system - Los M3: water-steam cycle and other pipelines - Los M4: nacelle crane. Electrical engineering, consisting of: - Los E1: Electrical - Los E2: control technology. Construction consisting of: - Lot B1: Frame - Los B2: Structural steel - Los B3: technical building equipment. For M1: The turbo kit is designed for a steam flow rate of approximately 130 mg / h. The steam parameters are 40 bar (a) and 400 ° C. The Abdampfparameter read 0.07 to 0.19 bar (a) and 39-59 ° C. In the notice published here are exclusively for the qualification competition for Los M1, turbine generator, gear, lubricating oil module, hydraulic station, control cabinets.

Turbine works

Konzernservicestelle Beschaffung – Submissionsstelle | Published July 4, 2015  -  Deadline August 25, 2015
cpvs
45315200, 42112100

Large turbine overhaul, consisting of the on-site audit of the entire turbine plant and the factory overhaul of the turbine rotor and other turbine components of the steam turbine 1 (DT 1).

Wind Turbine Generator Quality Surveillance Services — Pre-assembly, Installation and Completion

Vattenfall Europe Windkraft GmbH | Published January 27, 2017  -  Deadline February 24, 2017
cpvs
71631000

This ‘Wind Turbine Generator Quality Surveillance Services — Pre-assembly, Installation and Completion’ tender concerns the provision of qualified Client Representation and WTG Quality Surveillance services on site during WTG Pre-Assembly (base harbour), WTG Installation (Technical Offshore Representative) and/or Completion and Commissioning (offshore).

A. Scope of works for the client representation and quality control:

— Inspection and evaluation of site, storage, tools and lifting equipment used (e.g. verification of required certificates),

— Monitoring of transportation/ lifting activities,

— Monitoring of the mechanical and electrical assembly activities including pre-commissioning,

— Monitoring and evaluation of (manufacturer's) quality documentation (e.g. non-conformance reports, completion of checklist),

— Monitoring of repair activities and the associated reporting / documents,

— Monitor HSE on Site,

— Evaluation/reporting of the project progress on site/offshore,

— Own and maintain Employer's or own (at Employer's discretion) list of open points or similar,

— Liaise with Contractor's personnel and Contractor's project management team,

— Liaise with Certification Body / Marine Warranty Surveyor on Site,

— Hold and participate in Site meetings,

— Use the Employer's document control system,

— Be familiar with the Contract, the accompanying Employer's Requirements, design and Workshop Drawings and Specifications as well as with relevant Turbine Manufacturer's Manuals and Checklists,

— Using the Employer's component tracking system to report the status/progress of each component.

1. In addition to A. above, at the Pre-Assembly site:

— Inspection of incoming components,

— Final inspection of assembled components before load-out,

— Support the Employer in issuing Quay Side Certificates (or similar) to the Turbine Manufacturer on time.

2. In addition to A. above, during WTG Installation (Technical Offshore Representative):

— Inspection of TP systems,

— Evaluation and reporting of the project progress,

— Liaise with the Employer's Vessel Representative (EVR).

3. In addition to A. above, during Offshore Completion and Commissioning:

— Final inspection of mechanically completed WTGs,

— Final inspection of the commissioned WTGs and support the Employer in issuing Commissioning Completion Certificates (or similar),

— Liaise with Employer's Vessel Representative (EVR).

On occasion inspectors may also be required to carry out the following:

— Inspection and commissioning of electrical systems on the foundation,

— Support the Employer with switching operations,

— Support the Employer with setting up emergency power supplies for the WTGs.

The inspection team shall consist of personnel with a high degree of competence and experience as well as knowledge of wind turbine technology (incl. mechanical, electrical and coating works), and be proficient in relevant standards and regulations. In addition, the members of the inspection team shall be fluent in English (verbal and in writing) and shall have a high degree of personal motivation, communication and interpersonal skills.

Categories
  Germany - Show all countries
Schwerin (27)Rostock (19)Munich (13)Stuttgart (9)Hamburg (7)Arcisstr. 21 (5)Berlin (5)Hamburg (5)Oldenburg (5)Bochum (4)Cologne (4)Cologne (4)Heidelberg (4)Münster nordrhein-westfalen (4)Stuttgart baden-württemberg (4)Augsburg (3)Bochum (3)Flensburg (3)Regensburg (3)Stuttgart (3)06406 bernburg (saale) (2)Berlin (2)Chemnitz (2)Darmstadt (2)Dillenburg (2)Düsseldorf nordrhein-westfalen (2)Eschborn (2)Essen (2)Frankfurt-on-main (2)Göttingen (2)Göttingen (2)Göttingen niedersachsen (2)Hagen (2)Hünfelden (2)Leipzig sachsen (2)Neumünster (2)Potsdam (2)Siehe verzeichnis der empfängeranschriften (2) aachen nordrhein-westfalen (1)Aachen (1)Augsburg (1)Augsburg bayern (1)Bamberg (1)Bietigheim-bissingen (1)Bad kissingen (1)Bad mergentheim (1)Bamberg (1)Berlin-mitte (1)Bielefeld (1)Bielefeld nordrhein-westfalen (1)Bocholt (1)Bremen (1)Bremerhaven bremen (1)Cottbus (1)Coblenz (1)Cottbus (1)Cottbus brandenburg (1)Dessau-roßlau sachsen-anhalt (1)Erlangen (1)Essen (1)Eggenstein-leopoldshafen (1)Eschborn (1)Essen nordrhein-westfalen (1)Fraunhofer iwes, bremerhaven bremen (1)Halle (saale) (1)Hildesheim (1)Halle (saale) (1)Hanover (1)Heidenrod (1)Herten (1)Hürth (1)Karlsruhe (1)Kaiserslautern (1)Kassel hessen (1)Korbach (1)Krefeld (1)Kö (1)Landshut (1)Lubmin mecklenburg-vorpommern (1)Mainz (1)Mannheim (1)Münster (1)Münster (1)Neumarkt in der oberpfalz (1)Ober-ramstadt (1)Olching (1)Töging am inn (1)Tübingen (1)Ulm (1)Wuppertal (1)Wilhelmshaven (1)Winsen (luhe) (1)Wuppertal (1)Würzburg (1)