Public tenders for turbine in Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyturbineCzech Republic

Knitted fabrics

Moravec Kvalitní Ponožky, s.r.o. | Published September 29, 2017  -  Deadline November 6, 2017
cpvs
19251000

The subject of the tender for the selection procedure is one set of central suction of knitting machines in the range of 500 m piping with a turbine, including fasteners (couplings, sockets, fittings).

The subject of the tender for the selection procedure is one set of central suction of knitting machines in the range of 500 m piping with a turbine, including fasteners (couplings, sockets, fittings).

Turbine gas meters 2017-2019

GasNet, s.r.o. | Published February 17, 2017
cpvs
38420000

Instruments for measuring flow, level and pressure of liquids and gases

GasNet, s.r.o. | Published February 18, 2017
cpvs
38420000

The deliverable is a supply of turbine gas meters.

This is a supply of about 958 pieces of turbine gas meters.

Increased performance of the combustion turbine

TAMERO INVEST s.r.o. | Published February 13, 2017
cpvs
42112300

Increased performance of the combustion turbine

TAMERO INVEST s.r.o. | Published December 12, 2016  -  Deadline January 30, 2017
cpvs
42112300

Gas turbines

Tamero Invest s.r.o. | Published February 14, 2017  -  Deadline March 28, 2017
cpvs
42112300, 42113300, 42113390, 31140000, 42510000, 42513200

The contract is the implementation of the action - "Improving the performance of combustion turbine - GT Increasing power" in particular includes:

- Technical solution of the whole project - basic design,

- Preparation of documentation at all levels,

- Construction work,

- Supply of equipment,

- Installation of the equipment,

- Comprehensive testing of the entire plant

- Putting into operation.

Overhaul of turbine and generator TG 15

Veolia Enerie ČR, a.s. | Published December 29, 2016
Winner
Doosan Škoda Power s.r.o.
cpvs
31128000

Water brake for experimental steam turbine T10MW

Doosan Škoda Power s.r.o. | Published April 4, 2017  -  Deadline April 28, 2017
cpvs
31121110

Electrical dynamometer experimental steam turbine T10MW

Doosan Škoda Power s.r.o. | Published March 29, 2017  -  Deadline May 10, 2017
cpvs
31100000

Gas turbines

Tamero Invest s.r.o. | Published January 31, 2017  -  Deadline February 10, 2017
cpvs
42112300, 42113300, 42113390, 31140000, 42510000, 42513200

The contract is the implementation of the action - "Improving the performance of combustion turbine - GT Increasing power" in particular includes:

- Technical solution of the whole project - basic design,

- Preparation of documentation at all levels,

- Construction work,

- Supply of equipment,

- Installation of the equipment,

- Comprehensive testing of the entire plant

- Putting into operation.

Increased performance of the combustion turbine

TAMERO INVEST s.r.o. | Published January 30, 2017
cpvs
42112300

Turbine rotors

Sev. en EC, a.s. | Published November 29, 2016
Winner
Doosan Škoda Power s.r.o.
cpvs
31121331

The subject of this contract entitled "Restoration of NT rotor" is to ensure the supply of all necessary spare parts, repairs themselves NT rotor repairs transport rack, preparation of documentation and other activities associated with renovating NT rotor.

Implementation of the public contract primarily consist of:

- Delivery of spare parts;

- Transportation dismantled NT rotor;

- Dismantling the blades, indications shafts, shaft alignment, naválečkování bearing journals;

- Delivery and assembly of stainless steel foil on the shaft;

- Cleaning and visual inspection of rotor bore;

- Stretched around the rotor;

- Machine work - machined coupling holes;

- Dimensional control axis position housings;

- Preparation for dynamic balancing of the rotor;

- Copies of the documentation of repairs;

- Repair of transport rack (sandblasting, replacing bolts and nuts, protective coating, ...).

The subject of this contract entitled "Restoration of NT rotor" is to ensure the supply of all necessary spare parts, repairs themselves NT rotor repairs transport rack, preparation of documentation and other activities associated with renovating NT rotor.

Implementation of the public contract primarily consist of:

- Delivery of spare parts;

- Transportation dismantled NT rotor;

- Dismantling the blades, indications shafts, shaft alignment, naválečkování bearing journals;

- Delivery and assembly of stainless steel foil on the shaft;

- Cleaning and visual inspection of rotor bore;

- Stretched around the rotor;

- Machine work-machined coupling holes;

- Dimensional control axis position housings;

- Preparation for dynamic balancing of the rotor;

- Copies of the documentation of repairs;

- Repair of transport rack (sandblasting, replacing bolts and nuts, protective coating, ...).

Overhaul of turbine TG3

Elektrárny Opatovice, a.s | Published December 5, 2016
Winner
Siemens s.r.o.
cpvs
31128000

Revision of turbine flow TG8

ČEZ, a. s. | Published December 12, 2016
Winner
SIEMENS, s.r.o, odštěpný závod Industrial Turbomachinery
cpvs
31128000

Water wheels

ČEZ, a.s. | Published October 5, 2016  -  Deadline November 10, 2016
cpvs
42112210

Overhaul of TG1 and TG2 ESL complete range Refitting, design, manufacture and supply of new runner, distributor, turbine cover, shaft, motors, bearings, lubrication and cooling system, hydraulic control system. Further repairs other related parts. Execution model tests, tests on the work, commissioning and guarantee measurements.

Parts of steam turbines

Elektrárna Dětmarovice, a.s. | Published October 1, 2016
cpvs
42113100

Parts of steam turbines

Service and technical work on the turbines in the power of the ŠKODA Počerady, Inc.

Elektrárna Počerady, a.s. | Published August 19, 2016
cpvs

The deliverable is service work on steam turbines of the ŠKODA plant in Počerady Comprehensive security service implementation activities by implementation of preparation, management and evaluation of the activities incl. provision of the necessary materials and spare parts.

Service and technical work on the turbines of the ŠKODA in the ETU, EME, EPR, ELE, EPO, EHO and PPC Počerady

ČEZ, a. s. | Published August 19, 2016
cpvs

The deliverable is service work on steam turbines of the ŠKODA plant in Tušimice, Melnik, Prunéřov, Ledvice, Porici, Hodonin and Combined Cycle Power Počerady Comprehensive security service implementation activities by implementation of preparation, management and evaluation of the activities incl. provision of the necessary materials and spare parts.

Service and technical work on the turbines of the ŠKODA in Tisová, Inc.

Elektrárna Tisová, a.s. | Published August 19, 2016
cpvs

The deliverable is service work on steam turbines of the ŠKODA in the ETI, further implementation of the comprehensive security service activities by implementation of preparation, management and evaluation of the activities incl. provision of the necessary materials and spare parts.

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published August 29, 2016
cpvs

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. The energy potential of the tank VD Genoa will be used for generating electricity. To this end, the object in the current second bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part flow. According to CSN 75 2601, according to an installed capacity of HPP is a II. Category turbine with a rated output of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer el. energy from MVE, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. power from HPP. Production technology is irrelevant