Public tenders for turbine in Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyturbineCzech Republic

MVE Chase - reconstruction technology

Povodí Vltavy, státní podnik | Published July 1, 2016
cpvs

It is the modernization and repair of technological equipment MVE. Existing parameters MVE: 3x direct current Kaplan turbine directly connected to a synchronous generator, the mesh of 3500 mm, Q = 3 x 55 m3 / s, Hn = about 4m, Pi = 3 x 1.89 MW. The subject of work will include: modernization of the turbines without breaking the embedded portion (exchange axial distributor for diagonal, new impeller, new chamber impeller replacement accessory sets), inspection and repair of existing generators, the new control system, repair of quick inflow, modernization of electrical nn incl. the new control system, related works (new thrust blocks in the engine room, redevelopment of leaks, repair of paving, repairing manhole covers, repairing walls, paint, painting, etc.). The work will be carried out after each operation MVE soustrojích. Place of performance will be held on 20. 07. 2016 at 10:00. Collide before MVE Chase, Chase island, Praha 7. II.3) Sponsor lists the minimum duration of the contract within 700 days of the handover of the site to start work on 1 . sets.

ALITACE rotor blades first degree and second-stage turbine TV3-117 ENGINE IN COOPERATION

LOM PRAHA s.p. | Published April 12, 2016
cpvs

The subject of the tender is the implementation: alitace rotor blades 1st grade - basic drawing no. 7841.9001 and / or rotor blades alitace 2nd grade - basic drawing no. 7841.9002.

Provision of spare parts, overhaul and operation of the gas turbine Siemens SGT-1000 (V64.3A) - additional deliveries

Teplárny Brno, a.s. | Published May 4, 2016
cpvs

Additional supplies of spare parts for turbine overhaul in 2016

ELI I & C modernization

ČEZ, a. s. | Published April 25, 2016
cpvs

Modernization (supply and replacement) control system, turbine controllers, electrical protection and excitation sets of hydro plant Lipno I.

MVE Veletov, modernization and reconstruction

Povodí Labe, státní podnik | Published June 6, 2016
cpvs

Modernization and reconstruction of existing MVE in the area of ​​the weir VD Veletov - optimizing the utilization of hydropower potential water project for generating electricity. The technical solution of reconstruction will consist in replacing the existing two horizontal shaft Kaplan turbine type 3-KP-10A of the impeller diameter 1500 mm per one new Kaplan horizontal turbine including the necessary relevant technological equipment MVE (synchronous generators, transformers, control systems, etc.), And delivery of the interim barrier inlet and outlet slam inflow, cleaning machines and fine grating and coarse screens. The work of construction of the necessary demolition of the existing building parts of the building MVE and the entire new building construction of the MVE own and necessary adjustments water intake and waste from MVE. More specifications - see tender documents. Tender documents published by the sponsor on the contracting entity profile in full from the date of publication of the notice of open procedure: https://zakazky.eagri.cz/profile_display_1804.html In accordance with § 44 para. 6 of the Act defines the contracting authority following a substantive part of the work, which may not be filled with the subcontractor: This is one item listed in Annex D. 1 part 3 of the tender dossier: the technological part, PS 01 machine technological part, DPS 01.1 Kaplan turbine visit to the site of the future performance will be held on May 26, 2016 from 10:00 pm. Meeting participants is at 10:00 am at the construction site - water works Veletov, on the Elbe River, river km 201.736, Central Bohemia, k. Ú Veletov - parking on site VD.

MVE Chase - reconstruction technology

Povodí Vltavy, státní podnik | Published May 23, 2016
cpvs
42112210

It is the modernization and repair of technological equipment MVE. Existing parameters MVE: 3x direct current Kaplan turbine directly connected to a synchronous generator, the mesh of 3500 mm, Q = 3 x 55 m3 / s, Hn = about 4m, Pi = 3 x 1.89 MW. The subject of work will include: modernization of the turbines without breaking the embedded portion (exchange axial distributor for diagonal, new impeller, new chamber impeller replacement accessory sets), inspection and repair of existing generators, the new control system, repair of quick inflow, modernization of electrical nn incl. the new control system, related works (new thrust blocks in the engine room, redevelopment of leaks, repair of paving, repairing manhole covers, repairing walls, paint, painting, etc.). The work will be carried out after each operation MVE soustrojích. ad A) Description of needs: providing an operationally reliable technical state of technological equipment MVE, ensure better regulation sets and the higher electricity generation ad B) Course Description: The objective of the work will include: modernization of the turbines without pulling the embedded components, inspection and repair of existing generators, new control system, quick-fix inflow, modernization of electrical LV incl. a new control system related works. C d) A description of the relationship between subject and needs: Modernization and repair of ensuring reliable technical condition of MVE and better regulation sets. d D) Date of implementation: start of works: After signing SoD - 10/2016 assumption, the first shutdown sets and commencement of assembly work on the assumption MVE- 5/2017, completing work: a presumption 4/2019.

ALITACE rotor blades first degree and second-stage turbine TV3-117 ENGINE IN COOPERATION II

LOM PRAHA s.p. | Published June 1, 2016
cpvs

The subject of the tender is the implementation: alitace rotor blades 1st grade - basic drawing no. 7841.9001 and / or rotor blades alitace 2nd grade - basic drawing no. 7841.9002.

MVE Klecany - reconstruction technology

Povodí Vltavy, státní podnik | Published June 16, 2016
cpvs

Additional works according to § 23 para. 7 fonts. a) of the Act. These are the following: PS 01 Technological part machine: repair corrosion protection bypass the gutter and on dam sheet steel construction bridge corner sinks, steel cover frame to control šachtičce pressure grommets, grommet for the cable penetration, supply bearings, turbine draft belt gear 4 pieces , supply bearings generating patterns of the belt drive 4 pieces, shaft coupling for TG1 1 piece, delivery of new parts (cone rear cover labyrinth, housing) 2 pcs deflector manhole covers into the inlet part 2 pieces, repair tools and mechanism of the impeller 2 pcs supply and installation of backflow valves in the discharge seepage water 2 pieces, steel doors of wells pumping up suckers 2 units, assistance divers at repacked paying suckers. PS 02 Technological electrical part: editing operator workplace VD, new pressure level sensor incl. 3 pieces of equipment, increased exchange of cable routes, replacing external wiring outside the machinery MVE (originally not considering), adding lighting, editing control cabinets MS and dampers, editing PD disconnect high voltage lines. SO 01 Construction work MVE - larger scope of work (setting up the cable route on the pillar, paving repair, modification lid on dam member).

MVE Nýrsko - reconstruction of turbines

Povodí Vltavy, státní podnik | Published April 15, 2016
cpvs

Additional works according to § 23 par. 7 point. a) of the Act. These are the following: Supply of manual hoist 2.5 tons and 1.0 tons, their installation on existing crane groove in the engine room incl. perform tests and inspections of lifting equipment, editing drive slide valve DN 700, New RH1 switchboard (main switchboard dam in the engine room) - it was not possible to adjust and move according to the specifications provided PD, supply and installation of new electro inc. equipping cable routes in the engine to existing facilities bottom outlet and water supply demand, supply and installation of lighting into the access corridor, greater range of works in the engine room and sewage tunnel (namely: core drilling, floor leveling machinery, repairing walls and bet. constructions platform under compressor footbridge over the water pipe, sheet metal walkway hydraulic piping modifications railing around the shafts scuff DN 700th

Delivery of spare parts dosimeters Algade

Diamo, státní podnik odštěpný závod GEAM | Published February 23, 2016
cpvs

200 Pcs Turbine for Personal Alpha Sampler P-512-101 60 Pcs Personal dosimeter P-510-131 32 Pcs Filters 1,2μm (x100) 570-100 P-32 Pcs Films LR115 for alpha detection (x100) P-510-120 6 Pcs Ekrans (x250) P-510-119 1 Pcs Measuring Aplliance (CDEB) P-1 550-104 Shipment DAP

Újezd ​​MVE - MVE reconstruction

Povodí Ohře, státní podnik | Published January 8, 2016
cpvs

The subject of the tender is the reconstruction of MVE Újezd ​​technology, which has been technically and morally obsolete. MVE to VD Újezd ​​was put into operation in 2000. It is a vertical Kaplan turbine with asynchronous generator with max. Output of 90 kW. In the last period there were a large number of failures (accidents bearing defects on the impeller, the increased levels of vibration of the impeller shaft) and MVE outages. One of the main causes of failures is ingestion of foreign objects, suspended sediments beneath the surface of the tank VD Újezd, into the chamber of the impeller, which then causes frequent breakdowns and outages of electricity generation, which have a negative impact on the economy of operation, higher demands on the operator while influencing Handling lying on the waterworks. Reconstruction and modernization of HPP keeps increasing life and reliability of the new turbo machinery that will better suit the local conditions.

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published January 12, 2016
cpvs
45251120

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. Energy potential VD Genoa tanks will be used for electricity production. For this purpose the second object in the current bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part of the flow. According to CSN 75 2601, according to the total installed capacity is about HPP II. Category turbines with a rated power of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer of power. MVE energy, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. energy from MVE. Production technology is not relevant.

MVE Křižanovice, modernization and reconstruction

Povodí Labe, státní podnik | Published February 2, 2016
cpvs

Replacing the existing turbine set BK 30/18 Bánki designed for energy recovery of residual flow of 160 l / s under storage dams VD Křižanovice Francis turbine sets for F30H with all accessories designed to use the increased residual flow 290 l / s. F30H Francis turbine sets will be dismantled from MVE VD Bedřichov and moved to VD Křižanovice. Francis turbine set F30H horizontal configuration, including accessories, air intake and exhaust pipework will be installed in a newly constructed building MVE engine room. New MVE machine room will be built in an existing stilling basin bottom outlet DN600 and DN2000. Part of the investment will be complete reconstruction of the existing bottom outlet DN600 in the area of ​​the shaft pillar of the current MVE consisting in replacing existing dosluhujícího and unsatisfactory operating cap (the spray cap DN500) upstream cap (valve DN600 with rising stem controlled actuator), the pipework DN600 and rehabilitation of pipe distribution DN100 . Part of the subject of the preparation of project documentation for the application for a building permit (DSP), providing issuing the relevant permits to implement including a clause coming into force of this permit and project documentation for the execution of the project (DPS), including shop drawings and technological procedures. More and more conditions and specifications - see the technical specifications and draft contract for work

Works and services associated with the overhaul of gas turbine SGT-1000 (V64.3A) and generator TLRI 86/29

Teplárny Brno, a.s. | Published February 3, 2016
cpvs

Execution of works and provision of all support services related to the overhaul of gas turbine SGT-1000 (V64.3A) generator and gas turbine TLRI 86/29 (output 70 MW).

Replacing OK TG2 EDS

ČEZ, a. s. | Published March 23, 2016
cpvs

Design, production, delivery and installation of a new impeller (incl. Assembly and disassembly of the associated components and removal of the old impeller) sestružení with insert turbine shaft and the assembly, then repair other parts of the turbine which are related to the exchange of the impeller (fasteners, lower vane ring, labyrinths, seal, etc.), design work, model tests, pre comprehensive test and measurement guarantee. Date, place and conditions for the opening of the tenders will be set out in the invitation to tender. According to paragraph 5) § 84 of Act no. 137/2006 Coll. as amended, the Contracting Authority reserves the right to cancel the tender. Duration of contract / time limit for completion mentioned in point II.3) is only estimated and can be changed in the tender documents. Qualification documentation and the text of the tender documentation contracting published on the contracting entity profile, see section I.1. The deadline in point. IV.3.4 concerns the submission of an application. Negotiations Bids will be carried out in one phase of negotiations and will therefore not limited by the number of candidates with which it will be dealt menus. In this one phase will be carried out several rounds of negotiations. Negotiations will be conducted separately with each candidate, in the order in which the tenders will be delivered to the contracting authority. The last act of tenders, candidates will be informed in advance. Detailed information regarding the language of requests to participate and tenders are set out in the qualification and tender documents.

Repair, verification and calibration of turbine and rotary gas meters (various manufacturers) 2016-2018

RWE GasNet, s.r.o. | Published March 22, 2016
cpvs

Repair, verification and calibration of turbine and rotary gas meters

Repair and verification of turbine and rotary gas meter manufacturer Elster 2016-2018

RWE GasNet, s.r.o. | Published March 22, 2016
cpvs

Repair and verification of turbine and rotary gas meters.

Provision of spare parts, overhaul and operation of the gas turbine Siemens SGT-1000 (V64.3A).

Teplárny Brno, a.s. | Published March 3, 2016
Winner
Siemens Aktiengesellschaft
cpvs
42113000

Delivery of original spare parts - turbine blades, the material for the assembly of turbine blades, spare parts for reassembly turbines and strategic parts to ensure daily maintenance of the turbine (consignment store).

Repair of turbines PZP Štramberk

RWE Gas Storage, s.r.o. | Published February 11, 2016
cpvs

repair of turbines PZP Štramberk

Works and services associated with the overhaul of gas turbine SGT-1000 (V64.3A) and generator TLRI 86/29.

Teplárny Brno, a.s. | Published February 6, 2016
Winner
Siemens, s.r.o.
cpvs
51111200, 51133100

Execution of works and provision of all support services related to the overhaul of gas turbine SGT-1000 (V64.3A) generator and gas turbine TLRI 86/29 (output 70 MW).