Public tenders for turbine in Chomutov Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

MVE Klášterec - Reconstruction of turbines

Povodí Ohře, státní podnik | Published October 30, 2015
cpvs

The subject of the tender is the reconstruction of MVE Klášterec technology, which has been technically and morally obsolete. Small hydro power plant on the weir in Klasterec was built and put into operation in 1999. It is a Kaplan turbine with a synchronous generator. MVE was operated from July 1999 until August 2007, when after a generator failure acceded to overhaul the technological part. On MVE after another five years of operation they began to show equipment failure, which leads to frequent shutdowns and turbo machinery loss of electricity production. Replacement of existing technology with a new monitor both MVE trouble-free operation and also improve performance of the new turbo machinery from the current 128 kW to 149 kW.

MVE Klášterec - Reconstruction of turbines

Povodí Ohře, státní podnik | Published September 21, 2015
cpvs

The subject of the tender is the reconstruction of MVE Klášterec technology, which has been technically and morally obsolete. Small hydro power plant on the weir in Klasterec was built and put into operation in 1999. It is a Kaplan turbine with a synchronous generator. MVE was operated from July 1999 until August 2007, when after a generator failure acceded to overhaul the technological part. On MVE after another five years of operation they began to show equipment failure, which leads to frequent shutdowns and turbo machinery loss of electricity production. Replacement of existing technology with a new monitor both MVE trouble-free operation and also improve performance of the new turbo machinery from the current 128 kW to 149 kW.

MVE Klášterec - reconstruction of turbines

Povodí Ohře, státní podnik | Published April 9, 2015
cpvs
45251120

The subject of procurement is the reconstruction of MVE Klášterec technology that is already technically and morally obsolete. Small hydro power plant on the weir in Klasterec was built and put into operation in 1999. It is a Kaplan turbine with a synchronous generator. MVE was operated from July 1999 until August 2007, when after the failure of the generator acceded to overhaul the technological part. On MVE after a further five-year operation began to show equipment failure, which leads to frequent shutdowns and turbo machinery loss of electricity production. The replacement of existing technologies for new monitors both MVE trouble-free operation and also increase the performance of the new turbo machinery from the existing 128 kW to 149 kW. The effectiveness of the contract is justified by the need to exchange existing technology with a new one which monitors both MVE trouble-free operation and also increase the performance of the new turbo machinery from the existing 128 kW to 149 kW.

Additional works MVE Klášterec - reconstruction of turbines

Povodí Ohře, státní podnik | Published August 15, 2016
cpvs

Additional work caused by the necessity of ensuring the implementation of additional assembly work, which were not included in the contract of work, and the need arose due to unforeseen circumstances objectively, and which are necessary for the fulfillment of the Work

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published August 29, 2016
cpvs

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. The energy potential of the tank VD Genoa will be used for generating electricity. To this end, the object in the current second bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part flow. According to CSN 75 2601, according to an installed capacity of HPP is a II. Category turbine with a rated output of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer el. energy from MVE, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. power from HPP. Production technology is irrelevant

Újezd ​​MVE - MVE reconstruction

Povodí Ohře, státní podnik | Published January 8, 2016
cpvs

The subject of the tender is the reconstruction of MVE Újezd ​​technology, which has been technically and morally obsolete. MVE to VD Újezd ​​was put into operation in 2000. It is a vertical Kaplan turbine with asynchronous generator with max. Output of 90 kW. In the last period there were a large number of failures (accidents bearing defects on the impeller, the increased levels of vibration of the impeller shaft) and MVE outages. One of the main causes of failures is ingestion of foreign objects, suspended sediments beneath the surface of the tank VD Újezd, into the chamber of the impeller, which then causes frequent breakdowns and outages of electricity generation, which have a negative impact on the economy of operation, higher demands on the operator while influencing Handling lying on the waterworks. Reconstruction and modernization of HPP keeps increasing life and reliability of the new turbo machinery that will better suit the local conditions.

Újezd ​​MVE - MVE reconstruction

Povodí Ohře, státní podnik | Published October 26, 2015
cpvs

The subject of the tender is the reconstruction of MVE Újezd ​​technology, which has been technically and morally obsolete. MVE to VD Újezd ​​was put into operation in 2000. It is a vertical Kaplan turbine with asynchronous generator with max. Output of 90 kW. In the last period there were a large number of failures (accidents bearing defects on the impeller, the increased levels of vibration of the impeller shaft) and MVE outages. One of the main causes of failures is ingestion of foreign objects, suspended sediments beneath the surface of the tank VD Újezd, into the chamber of the impeller, which then causes frequent breakdowns and outages of electricity generation, which have a negative impact on the economy of operation, higher demands on the operator while influencing Handling lying on the waterworks. Reconstruction and modernization of HPP keeps increasing life and reliability of the new turbo machinery that will better suit the local conditions.

MVE Újezd ​​- reconstruction of MVE

Povodí Ohře, státní podnik | Published April 9, 2015
cpvs
45251120

The subject of procurement is the reconstruction of MVE Újezd ​​technology that is already technically and morally zastaralá.MVE on VD Újezd ​​was put into operation in 2000. It is a vertical Kaplan turbine with asynchronous generator for max. Output of 90 kW. In recent years there have been a large number of failures (accidents bearing faults on the impeller, the increased levels of vibration of the impeller shaft) and MVE outages. One of the main causes of failures is ingestion of foreign matter, suspended solids underwater tank VD Újezd, into the chamber of the impeller, which then causes frequent failures and outages of electricity generation, which have a negative impact on the economy of operation, higher demands for service and simultaneously affect manipulation lying on the waterworks. Reconstruction and modernization of MVE keeps increasing durability and reliability of the new turbo machinery, which will better suit local conditions. The effectiveness of the contract is justified by the need for reconstruction and modernization of MVE for increased durability and reliability of the new turbo machinery, which will better suit specific local conditions.

VD GENOA - CONSTRUCTION MVE

Povodí Ohře, státní podnik | Published January 12, 2016
cpvs
45251120

MVE is subject to execution of hydroelectric power potential of the waterworks Genoa. Energy potential VD Genoa tanks will be used for electricity production. For this purpose the second object in the current bottom outlet installed turbine. Installation of small hydropower plants in the building of the second bottom drain runoff conditions will not deteriorate trough Loupnice in pertinent part of the flow. According to CSN 75 2601, according to the total installed capacity is about HPP II. Category turbines with a rated power of 125 kW. The total absorption capacity sets small hydropower plants is 0,250 m3.s -1. Breakdown of construction and operational units: SO 01 Engine room and the influx of small hydropower plants (HPP) technology PS 01 turbines with accessories PS 02 Power electrical, instrumentation and control (M & C), data transmission part II - Transfer of power. MVE energy, which will be fitted to the bottom outlet construction is positioned so that the optimum possible extent allowed transmission power. energy from MVE. Production technology is not relevant.
  • 1