Public tenders for turbine in Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyturbineCzech Republic

Turbine rotors

Sev.en EC, a.s. | Published August 6, 2016  -  Deadline August 15, 2016
cpvs
31121331, 42113171, 45111300, 45259000

turbine rotors

Turbine gas meters 2014-2016

RWE GasNet, s.r.o. | Published February 24, 2014
cpvs

The subject of the public contract is the supply of turbine meters.

Reconstruction backpressure turbine TG 5

Teplárna České Budějovice, a.s. | Published January 15, 2015
cpvs

The subject of procurement is the reconstruction of the existing steam turbine TG 5 located in the base plant on Novohradske Street Heating Plant Czech Budejovice, as supplies and services associated with the reconstruction of the turbine will be made in accordance with the conditions specified in the tender documents and associated documentation. The subject of procurement is the reconstruction of the electric output of 29.2 MWe turbine sets at a flow rate of steam 215 t / h at nominal power of 14 MWe steam flow at 100 t / h and in connection with the reduction in specific consumption and increasing the overall reliability of turbine sets. The subject of supplies and services, the adjustment of the upper and lower parts of the body with the delivery of a new turbine rotor and the stator and rotor přelopatkováním. The supplies will then conversion and adjustment of input and output steam piping and control valves placement (3 pieces) and RSV valve as a block outside the turbine housing. Work will be performed in accordance with the conditions specified in the tender documents and in the design of means, which processes the contractor as part of the public contract. Expected date of fulfillment of a public contract for 10 months from the conclusion of the work the contractor selected on the basis of the SP.

Turbine works

Povodí Labe, státní podnik | Published August 18, 2015
Winner
Strojírny Brno, a.s.
cpvs
45315200, 71300000

Optimising utilization of hydropower potential water project for generating electricity. The technical solution of reconstruction will consist in replacing the original two vertical Kaplan turbines of 1943 on the impeller diameter 3600 mm for two new Kaplan vertical turbine, including the necessary relevant technological equipment (synchronous generators, transformers, control systems, etc.) With the necessary building modifications in the existing HPP . The subject of the public contract is the design and engineering activities related to the implementation of the Work, including - in consultation with DSO - CEZ Distribution and ERUs to connect the new plant.

Turbine Inlet OG swim.

Jihočeský vodárenský svaz | Published April 12, 2014  -  Deadline June 2, 2014
cpvs
42112210, 45315200

The delivery is the installation of a new generator TG2 vertical Francis turbine power plant to the existing building Inlet OG swim. New sets TG2 is a direct connection to an asynchronous generator. At the same follow-up adjustments will be made in building and technology to ensure reliable operation of the newly installed generator. TG1 will remain preserved in the existing structure and will be used as a reserve.

Repair and verification of turbine and rotary gas meter manufacturer Elster 2016-2018

RWE GasNet, s.r.o. | Published March 22, 2016
cpvs

Repair and verification of turbine and rotary gas meters.

Increasing the gas turbine - GT Power Increasing

TAMERO INVEST s.r.o. | Published September 22, 2016
cpvs

The contract is the implementation of the action - "Increasing the gas turbine - GT Increasing power", including in particular: Technical solution design documentation processing Construction work Supply of equipment Assembly of equipment Comprehensive testing of the entire plant Putting into operation a detailed scope of the contract is described in the tender documentation the contract.

Spare parts, overhaul and operation of a combustion turbine Siemens SGT-1000 (V64.3A)

Teplárny Brno, a.s. | Published February 11, 2015
cpvs

Delivery of original spare parts - turbine blades, fitting material turbine blades, spare parts for reassembly turbines and strategic parts to ensure daily maintenance of the turbine (consignment store). The tender documentation for the 1st round is publicly available on the profile of the submitter. The tender documentation for the 2nd round JŘSU will be published on the contracting entity profile at the start of the 2nd round JŘSU. ZD for the 1st round JŘSU contains conditions for the processing of requests to participate. Terms and conditions of the contract will be in the form of an obligatory nature. The opening of envelopes with applications for participation is private. Opening of the tenders will be stated in the invitation to tender for the 2nd round JŘSU.

Provision of spare parts, overhaul and operation of the gas turbine Siemens SGT-1000 (V64.3A).

Teplárny Brno, a.s. | Published March 3, 2016
Winner
Siemens Aktiengesellschaft
cpvs
42113000

Delivery of original spare parts - turbine blades, the material for the assembly of turbine blades, spare parts for reassembly turbines and strategic parts to ensure daily maintenance of the turbine (consignment store).

Provision of spare parts, overhaul and operation of the gas turbine Siemens SGT-1000 (V64.3A)

Teplárny Brno, a.s. | Published February 29, 2016
cpvs

Delivery of original spare parts - turbine blades, the material for the assembly of turbine blades, spare parts for reassembly turbines and strategic parts to ensure daily maintenance of the turbine (consignment store).

Turbine gas meters 2014-2016

RWE GasNet, s.r.o. | Published October 18, 2013  -  Deadline November 7, 2013
cpvs

The subject of the public contract is the supply of turbine meters. G 100 (DN 80, PN 10) 100 G (DN 80, PN 40) G 160 (DN 100, PN 40) 250 G (DN 80, PN 10) G 250 (DN 100, PN 10) G 250 (DN 100 , PN 40) G 400 (DN 100, PN 10) G 400 (DN 100, PN 40) G 400 (DN 150, PN 10) G 650 (DN 150, PN 10) G 650 (DN 150, PN 40) G 1000 (DN 150, PN 10) G 1600 (DN 150, PN 10) G 1600 (DN 150, PN 40) G 2500 (DN 15, PN 16) G 4000 (DN 150, PN 10) Each candidate may nominate a maximum of two their representative.

Adjusting the energy management company Deza, as - Installation of a back-pressure turbine TG3

DEZA, a.s. | Published December 2, 2013
cpvs

The subject of the public contract is the supply and installation of a new backpressure turbine with a minimum output of 4 MW, which will operate with a pressure gradient of 6.3 to 0.6 MPa.

Updated energy management company Deza, as - Installing a back-pressure turbine TG3.

DEZA, a.s. | Published December 10, 2013  -  Deadline February 10, 2014
cpvs
42112100, 51130000, 51112100, 45220000

The subject of the public contract is the supply and installation of new backpressure turbine with a minimum output of 4 MW, which will operate a pressure drop 6.3 to 0.6 bar abs.

Repair, verification and calibration of turbine and rotary gas meters (various manufacturers) 2016-2018

RWE GasNet, s.r.o. | Published March 22, 2016
cpvs

Repair, verification and calibration of turbine and rotary gas meters

Works and services associated with the overhaul of gas turbine SGT-1000 (V64.3A) and generator TLRI 86/29

Teplárny Brno, a.s. | Published February 3, 2016
cpvs

Execution of works and provision of all support services related to the overhaul of gas turbine SGT-1000 (V64.3A) generator and gas turbine TLRI 86/29 (output 70 MW).

Works and services associated with the overhaul of gas turbine SGT-1000 (V64.3A) and generator TLRI 86/29.

Teplárny Brno, a.s. | Published February 6, 2016
Winner
Siemens, s.r.o.
cpvs
51111200, 51133100

Execution of works and provision of all support services related to the overhaul of gas turbine SGT-1000 (V64.3A) generator and gas turbine TLRI 86/29 (output 70 MW).

Turbine Inlet Central Committee Plav

Jihočeský vodárenský svaz | Published April 9, 2014
cpvs

The delivery is the installation of a new generator TG2 vertical Francis turbines to the existing building power inlet on the Central Plav. New sets will TG2 with a direct connection to an asynchronous generator. At the same time follow-up adjustments will be made in the construction and technology to ensure reliable operation of the newly installed generator. TG1 will continue to maintain the existing arrangement and will be used as a reserve. Previous tender procedure for the award of a public contract "Turbine Inlet Swim Central Committee", which was published under Ev. No. 365,766 has been set aside pursuant to § 84 paragraph 1 point. e) the PPA. According to § 71 paragraph 6 of the PPA contracting authority indicates a change of the terms of the canceled prior tender procedure In the specifications listed: 1st Information for tender procedure and deadline for submission of Tenders 3 specifications, additional information-Tender documentation fourth Object of the contract- time implementation 6 Other requirements of the client to meet the procurement 12th Terms and Conditions of offer processing-Part 3 offers - Supplier Qualification 13th opening of the tenders, 17th Identification previous procurement procedure

turbine rotors

ČEZ, a. s. | Published November 9, 2012
cpvs
31121331

:Předmětem veřejné zakázky je dodávka náhradního dílu turbíny 200 MW – NT rotor.

Provision of spare parts, overhaul and operation of the gas turbine Siemens SGT-1000 (V64.3A) - additional deliveries

Teplárny Brno, a.s. | Published May 4, 2016
cpvs

Additional supplies of spare parts for turbine overhaul in 2016

Work and services related to the overhaul of gas turbine SGT-1000 (V64.3A) and generator TLRI 86/29

Teplárny Brno, a.s. | Published April 30, 2015
cpvs
51111200

Execution of works and provision of all support services related to the overhaul of gas turbine SGT-1000 (V64.3A) and combustion turbine generator TLRI 86/29 (output 70 MW). Reason effectiveness of public procurement: The description needs to be fulfilled by meeting VZ: The safe and reliable operation of the turbine set consisting of a combustion turbine SGT-1000 (V64.3A) and synchronous generator TLRI 86/29 for the upcoming operating period ie. Min. 25,000 equivalent operating hours (EOH) for turbines and min. 75,000 EOH in case the generator. A description of the subject of the contract: The contractor and all support services provide: a) supervision and technical work (ie. A skilled, producer gas turbines (type V64.3A) and generator (type TLRI 86/29) certified and trained staff); b) Borrowing of special tools and fixtures for overhaul of gas turbine and generator V64.3A TLRI 86/29; c) by agreement subsequent agreements ancillary workforce; d) the successful and full implementation of the works, including commissioning a given time interval and according to the work schedule. A description of the relationship between the subject and the needs of the contracting authority VZ: Successful general overhaul of gas turbine and generator according to current applicable standards and manufacturers in a given time interval. Expected date of fulfillment of the public contract: 05/18/2016 contract is awarded to sector contracting entity and will be awarded in a negotiated procedure with publication.