Public tenders for turbine in Switzerland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyturbineSwitzerland

Electromechanical LOS1 - Project: Turbine Generator Protection and Control

EWZ Elektrizitätswerk Zermatt AG | Published August 12, 2016  -  Deadline September 30, 2016
cpvs
42110000

Supply, installation and commissioning of turbine, generator, control and safety equipment

KW Bersch Erbach, Lot 8 Electromechanical 8.1 turbine and generator 8.2 8.3 generator transformer shutoff

Kraftwerk Berschnerbach AG c/o Wasser- und Elektrizitätswerk Walenstadt | Published February 27, 2017  -  Deadline October 10, 2016
cpvs

KW Bersch Erbach, Lot 8 Electromechanical 8.1 turbine and generator 8.2 8.3 generator transformer shutoff

Wood power plant Basel II, contractor services BKP 35 (turbine / water-steam cycle

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published August 27, 2016  -  Deadline April 29, 2016
cpvs

Wood power plant Basel II, contractor services BKP 35 (turbine / water-steam cycle

Steam turbines

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published August 31, 2016
Winner
Caliqua AG
cpvs

Wood power plant Basel II, contractor services BKP 35 (turbine / water-steam cycle).

Electronic, electromechanical and electrotechnical supplies

Kraftwerk Berschnerbach AG c/o Wasser- und Elektrizitätswerk Walenstadt | Published September 3, 2016  -  Deadline October 10, 2016
cpvs

Los 8 Electromechanical power plant Bersch Erbach.

8.1 Delivery and installation of turbine incl. Auxiliaries, generator incl. Auxiliaries, control and I & C equipment incl. Equipment chamber

8.2. Supply and installation of a generator transformer,

8.3 Delivery and installation of a shut-off before the turbine incl. Bypass and the Aussrüstung the apparatus chamber with pipe rupture and flow measurement (MID) incl. Tubing.

KVA Oberwallis, spare machine guidance system steam turbine and generator

Kehrichtverbrennungsanlage Oberwallis | Published September 9, 2016  -  Deadline October 31, 2016
cpvs
31000000

In the waste incineration plant Oberwallis Gamsen a condensing turbine has been put into operation in the year 1997th As part of the process steam extraction, the steam turbine has been transformed into a back-pressure turbine in of 2010. The steam is expanded in turbine up to back pressure.
After more than 19 years of operation the entire control system is to be replaced. This includes:
-Maschinensteuerung
-Turbinenregler
-Turbinenschutzsystem
voltage regulators
-Generatorschutzsystem
-Synchronisierungssystem
-Niederspannungsverteilung

Wooden Power Station Basel II, contractor services BKP 35 (turbine / water-steam cycle

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published December 30, 2015  -  Deadline March 18, 2016
cpvs
42112100

All supplies and services for the complete and functional construction of a steam turbine system for a boiler system with max. 28 MW thermal input. The system includes the basic version is essentially a high-pressure heating turbine, generator, water-steam cycle, with district heating capacitor connection, compressed air system, cooling water system, overhead crane turbine hall and pipe bridge to KVA. Alternative 2 variants offer: Version 1 includes a back-pressure turbine with 100% connection to the medium-pressure steam network (12bar), water-steam cycle, compressed air system, cooling water system, overhead crane turbine hall and pipe bridge to KVA. The system is installed in the building to be created on (Turbinenhalle HKW Basel II). In the variant 2 is plus for Variant 1, a medium-pressure heating turbine to integrate with district-Rücklaufvorwärmung at the site KVA.

Turbine installations

Pepi Natale SA | Published July 5, 2014  -  Deadline August 4, 2014
cpvs
42112000

1.Equipement extérieur : 1 batardeau, largeur = 2.90 m, hauteur = 1.80 m (commande automatique et manuelle) 1 clapet de seuil, largeur = 8.00 m, hauteur = 1.40 m (commande hydraulique automatique) Canal amont, 1 batardeau, largeur = 4.50 m, hauteur = env. 3.00 m (commande automatique et manuelle) Canal de fuite, 1 batardeau, largeur = 4.50 m, hauteur = env. 2.00 m (commande automatique et manuelle) 2.Concernant la PCH : Un dispositif pour la pré-grille (grille amont) Une grille fine Un dégrilleur complet (commande + automatisation) Une turbine Kaplan verticale en chambre d'eau à double réglage (transmission directe ou avec courroie en fonction des possibilités) Commande de la turbine complètement automatisée Transport Montage

Renewal KW Trübsee - Revision and remodeling turbine (Lot 1)

Kraftwerke Engelbergeraa AG (KWE) | Published April 29, 2015  -  Deadline July 6, 2015
cpvs
42112200

The tendered works and services include the general revision, the conversion of the nozzle inlet and Ablenkerantrieb and the delivery of a new hydraulic unit for single-nozzle Pelton turbine of the power station Trübsee (rated power: 8.5 MW, gross head: 768 m), including dismantling, re-assembly, full piping, commissioning and all transports and from the installation site.

Electronic, electromechanical and electrotechnical supplies

BKW FMB Energie AG, Hydraulische Kraftwerke | Published February 14, 2015  -  Deadline April 10, 2015
cpvs
31700000

The present tender concerns the lot 300 and includes: -. Repair of the Kaplan turbine No. 5; - Optimization of the impeller blade geometry; - Design, manufacture and supply of new impeller blades; - Maintenance position diffuser, conversion to fat-free storage; - Testing and repair of the relevant components such as turbine impeller hub, turbine and generator shaft, turbine and generator bearings, wheel shell, housing parts; - Design, supply and installation of a new water-lubricated turbine guide bearing (option); -. Design, supply and installation of a new digital and hydraulic turbine controller including diffuser servo motor.

Steam turbines

Energie Wasser Bern Administration Beschaffungsausschuss | Published March 3, 2017  -  Deadline April 21, 2017
cpvs
42112100

The Lot 1 essentially includes the following services:

- A counter-pressure steam turbine;

- A generator 11.6 kV;

- A lubricating and control oil system (if necessary);

- Complete control of turbine and generator;

- A maintenance contract for the counter-pressure steam turbine.

The description of the goods and services is in the specification (part of the contract C incl. Its side dishes).

Electronic, electromechanical and electrotechnical supplies

BKW FMB Energie AG Hydraulische Kraftwerke | Published July 9, 2015
cpvs
31700000

WKW Hagneck Turbine 5 Instandstellung.

KW Wassen: Beschaffung Laufrad „G“, Turbine 1

Kraftwerk Wassen AG, Täschmattstrasse 4, CH-6015 Luzern, SCHWEIZ, bis 31.12.2014 vertreten durch die Projektleitung: Centralschweizerische Kraftwerke AG, Täschmattstrasse 4, CH-6015 Luzern, SCHWEIZ | Published January 31, 2014  -  Deadline May 8, 2014
cpvs
42112200

Gegenstand und Umfang der Beschaffung: Laufradbeschaffung Turbine 1 für die Kraftwerk Wassen AG, CH-6484 Wassen. Option für die Beschaffung eines weiteren Laufrades in gleichem Umfang.

Steam turbines

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published December 31, 2015  -  Deadline March 18, 2016
cpvs
42112100, 42113100, 51133000, 31124000, 44164200, 09323000

All supplies and services for the complete and functional construction of a steam turbine system for a boiler system with max. 28 MW thermal input. The system includes the basic version is essentially a high-pressure heating turbine, generator, water-steam cycle, with district heating capacitor connection, compressed air system, cooling water system, overhead crane turbine hall and pipe bridge to KVA. Alternative 2 variants offer: Version 1 includes a back-pressure turbine with 100% connection to the medium-pressure steam network (12bar), water-steam cycle, compressed air system, cooling water system, overhead crane turbine hall and pipe bridge to KVA. The system is installed in the building to be created on (Turbinenhalle HKW Basel II). In the variant 2 is plus for Variant 1, a medium-pressure heating turbine to integrate with district-Rücklaufvorwärmung at the site KVA.

Replacement turbine / generator group, KW Arni

ewl Kabelnetz AG | Published January 31, 2015  -  Deadline March 27, 2015
cpvs
42121200

Turbine / generator unit ~ 2.8 [MVA as a replacement for the existing turbine group for the power plant Arni]

Turbine

Zweckverband für Abfallverwertung im Bezirk Horgen | Published November 1, 2013  -  Deadline February 3, 2014
cpvs
90000000

Der ZVHo betreibt in Horgen eine KVA, um den im Verbandsgebiet anfallende Kehricht thermisch zu verwerten. Im Jahr 2015 wird eine der beiden bestehenden Ofenlinien modifiziert und voraussichtlich bis ins Jahr 2030 weiterbetrieben. Die andere Ofenlinie wird rückgebaut, so dass die Verwertungskapazität der KVA Horgen noch rund 30‘000 Jahrestonnen betragen wird. Die Modifikationen im Bereich der Turbogruppe sollen vor allem im Hinblick auf eine verbesserte Energienettoeffizienz und einer erhöhten Dampfmenge geschehen. Im aktuellen Zustand beträgt die durchschnittliche Frischdampfmenge, welche auf die Konden-sationsturbine geleitet wird rund 16 t/h. Über die Entnahme wird die Mitteldruckschiene auf rund 10 bar gehalten. Für die Entgasung des Speisewassers wird über die Anzapfung Dampf bei rund 5 bar entnommen. Der Rest des Dampfs wird mittels Luko kondensiert und wieder dem Speisewasser zugeführt. Neu soll die Turbogruppe mit mindestens 10% mehr Frisch-dampf Dauerlast fahren können und dabei einen möglichst grossen Teil der Dampfmenge bei ca. 2,1 bar an den Fernwärme-HeiKo abgeben. Dabei sind Turbine, Generator, Hotwellpumpen, Kondensatpumpen und Luko mit zu berücksichtigen. Die vorhandenen Anlageteile können revidiert und modifiziert oder auch durch neue Komponenten ersetzt werden.

KW Sedrun, Ersatz Kaplan Turbine

Kraftwerke Vorderrhein AG c/o Axpo Power AG | Published June 27, 2013  -  Deadline September 30, 2013
cpvs
42112200

Gegenstand dieser Ausschreibung ist der komplette Ersatz der Kaplan Maschinengruppe im Kraftwerk Sedrun bestehend aus den Baugruppen: • Turbine • Hydraulischer Turbinenregler • Absperrklappe • Kühlsystem • Generator • Leittechnik / Turbinensteuerung Die in diesen Ausschreibungsunterlagen beschriebenen Lieferungen und Leistungen umfassen die Auslegung, Berechnung, Konstruktion, Fabrikation, den Transport und die Zwischenlagerung auf der Baustelle, die Montage, Inbetriebsetzung, Prüfungen und Abnahmemessungen in der Fabrik und im Kraftwerk, die Durchführung des Probebetriebes, Inspektionen während der Garantiezeit, Instruktionen und Schulungen des Kraftwerkpersonals sowie die Betriebsdokumentation.

IWB, replacement steam turbine for feedwater pump

Bau- und Verkehrsdepartement des Kantons Basel-Stadt, Kantonale Fachstelle für öffentliche Beschaffungen | Published July 30, 2016  -  Deadline May 30, 2016
cpvs

IWB, replacement steam turbine for feedwater pump

Energy Source Bern Forsthaus - backpressure steam turbine HHKW - planning services

Energie Wasser Bern Administration Beschaffungsausschuss | Published December 21, 2016
cpvs

Energy Source Bern Forsthaus - backpressure steam turbine HHKW - planning services

Power plant Grimsel Nollen, replenishment turbine Gelmer, Electromechanical equipment

Kraftwerke Oberhasli AG, Einkauf | Published August 9, 2016  -  Deadline April 25, 2016
cpvs

Power plant Grimsel Nollen, replenishment turbine Gelmer, Electromechanical equipment