Public tenders for turbine in Bulgaria

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Turbine works

AES Bulgaria Europe Shared Services | Published March 2, 2017  -  Deadline April 10, 2017
cpvs
45315200, 42112100, 42163000

Several AES Corporation subsidiaries in Europe, AES Ballylumford, AES Kilroot Power and AES Maritza (AES) are seeking a contractor to provide the services to cover Steam Turbine and Generator maintenance and overhauls for a fixed outage period.

Provide overhaul services for the following:

AES Kilroot Power: 2 off Alstom (GEC) 300 MW Impulse reaction, axial single flow HP/IP. Double flow LP, single reheat, tendem compound Steam Turbine — Base Load Machine overhauls,

AES Ballylumford: 2 off Steam Turbine, 200 MW. 3RH24-485, Alstom (GEC) — Steam Turbine — Peak Lopper overhauls.

Provide overhaul services for the following Generators:

AES Kilroot Power: 2 OFF — 300MW, 17kV, 50Hz, 2 Pole, Hydrogen Cooled, Alstom (GEC) — Base Load,

AES Ballylumford: 2 OFF — 250 KVA. 94/157/40 1/8 — Alstom (GEC) — Peak Lopper.

Conduct overhauls of the following Steam Turbines and Generators:

2 OFF — Steam Turbine — D20LO-MD3K-ND41BS, Alstom — Base Load machine,

2 OFF — Generator — 50WT21H-120 — Base Load Machine.

Current turbine maintenance services - Alstom Turbine type: DKY-2 N41B and adjoining and turbine equipment on the territory of AES-3C Maritza East 1 TPP

Ей И Ес - 3С Марица Изток I ЕООД | Published June 1, 2017  -  Deadline June 26, 2017
cpvs
50000000

The activities are related to the ongoing maintenance of Alstom Turbine type: DKY-2 N41B and the adjoining and turbine equipment on the territory of the ASE-3C Maritza East 1 TPP.

EBRD - Restoration of Hydro Insulation of Turbine Hall and Reactor Building of Kozloduy NPP Units 1-4

State Enterprise Radioactive Waste, Decommissioning-Repository Project Management Unit (D-R PMU) | Published June 1, 2016  -  Deadline July 11, 2016
cpvs

EBRD - Restoration of Hydro Insulation of Turbine Hall and Reactor Building of Kozloduy NPP Units 1-4

Turbine generator control apparatus

"ТЕЦ Марица изток 2" ЕАД | Published September 28, 2012  -  Deadline April 25, 2012
cpvs
31124200, 31161100

Turbine generator control apparatus

turbine generator control apparatus

"ТЕЦ Марица изток 2" ЕАД | Published September 28, 2012  -  Deadline April 25, 2012
cpvs
31124200, 31161100

turbine generator control apparatus

Turbine equipment

„ТЕЦ Марица изток 2“ ЕАД | Published December 30, 2016  -  Deadline February 6, 2017
cpvs
42112400, 42124000

Delivery of spare parts for turbine equipment, in 2 lots, as follows:

I lot - "Delivery of spare parts for pumps turbine equipment";

Lot II - "Supply of spare parts for high-pressure heaters."

Delivery of spare parts for pumps turbine equipment according to specifications and technical requirements.

Delivery of spare parts for high-pressure heaters, according to specifications and technical requirements.

Repair of fittings in a turbine workshop

ТЕЦ Марица изток 2 ЕАД | Published November 3, 2017
cpvs
50512000

Repair of armature in a turbine workshop, in eight separate positions: I lot - Repair of fittings in a turbine workshop - TA-1; II lot - Repair of fittings in a turbine workshop - TA-2; III lot - Repair of fittings in a turbine workshop - TA-3; IV lot - Repair of armature in a turbine workshop - TA-4; V lot - Repair of fittings in a turbine workshop - TA-5; VI Lot Item - Repair of fittings in a turbine workshop - TA-6; VII Lot - Repair of fittings in a turbine workshop - TA-7; VIII Lot - Repair of fittings in a turbine workshop - TA-8

Delivery of spare parts for turbine equipment

ТЕЦ Марица изток 2 ЕАД | Published December 30, 2016  -  Deadline February 7, 2017
cpvs
42112400

Delivery of spare parts for turbine equipment in two lots as follows: I lot - "Delivery of spare parts for pumps turbine equipment"; Lot II - "Supply of spare parts for high-pressure heaters"

Emergency Repair of Steam Turbine №1

 | Published March 2, 2018  -  Deadline March 2, 2018
cpvs

It is necessary to carry out urgent and urgent emergency restoration work on the steam section of the Steam Turbine No. 1, consisting of: Opening of the steam turbine part; Overview of labyrinth seals; View all grades of work blades; Checking the bearings; Revision of oil and regulating system; Revision of valve boxes and control valves.

"Repair of fittings turbine workshop"

ТЕЦ "Марица Изток" 2 ЕАД | Published September 21, 2016  -  Deadline November 2, 2016
cpvs
undefined, 50512000

"Repair of fittings turbine workshop"

Repair of turbine equipment of block 5

ТЕЦ Варна ЕАД | Published March 6, 2018  -  Deadline March 23, 2018
cpvs
50531000

"Repair of turbine equipment of Unit 5" according to Annex 1 and Annex 2 to the documentation for participation.

Repair of turbine equipment of Unit 4

ТЕЦ Варна ЕАД | Published May 21, 2018  -  Deadline June 12, 2018
cpvs
50531000

"Repair of turbine equipment of Unit 4" according to Appendix 1 to the order documentation.

Delivery of spare parts for turbine oxo-12A.

 | Published December 20, 2016  -  Deadline December 20, 2016
cpvs

Delivery of spare parts for turbine oxo-12A nature of supply and quantities are described in the Technical Specification № 2016.30.TO.00.TSP.1391 Claimed spare parts are needed for minimal emergency reserve, as well as upcoming in 2017. overhaul of turbine OK-12A.

Current turbine maintenance services - Alstom Turbine type: DKY-2 N41B and the adjoining and turbine equipment on the territory of AES-3C Maritza East 1 TPP

 | Published July 14, 2017  -  Deadline July 13, 2017
cpvs

The purpose of ongoing maintenance is to restore reliability and design parameters / performance, CPC, and more. / Of the facilities and Block as a whole. During the maintenance of the turbine it is necessary to carry out cleaning, blasting, non-destructive control of individual elements according to the documentation of the manufacturer's plant in the required quantity and quality volume. Current maintenance and repair includes, but is not limited to, the following activities: High-pressure cylinder repair (CVT): Medium-pressure cylinder repair (CCH); Low-pressure cylinder (CNG) repair work; Adjusting system; Receiver pipeline; Base bearings 1, 2, 3, 4, 5, and 6; Oil packing bearings 1 and 2; Lubricating oil system; Sealing oil system; Condenser on water and steam side; Complete dismantling of the facilities and nodes, detailed inspection, all necessary measurements, tests, research, elimination of the defects found, replacement or repair of all worn parts and parts, repair of all defective parts. The exact scope of the activities and the respective quantities will be determined with a request sent by the Contracting Authority according to the specific needs.

Supply of spare parts for major overhaul of the SST300 turbine

ЕВН България Топлофикация ЕАД | Published March 19, 2018  -  Deadline April 24, 2018
cpvs
42113100

Supply of spare parts for major overhaul of a turbine SST300 EVN Bulgaria Toplofikatsiya EAD has installed the CHP with a combined cycle of production of electric and thermal energy with a gas turbine Siemens SGT700, ser. N BD00003U01, in combination with flue gas boiler and steam turbine Siemens SST300, ser. N 77837 and a centralized management system based on Siemens PCS7. The purpose of this procedure is to provide the necessary spare parts needed to carry out planned overhaul of the Siemens SST300 steam turbine.

Supply of spare parts for major overhaul of the SST300 turbine

 | Published June 22, 2018  -  Deadline June 22, 2018
cpvs

Supply of spare parts for major overhaul of SST300 turbine EVN Bulgaria Toplofikatsiya EAD has installed the combined heat and power CHP with gas turbine Siemens SGT700, ser. N BD00003U01, in combination with flue gas boiler and steam turbine Siemens SST300, ser. N 77837 and a centralized management system based on Siemens PCS7. The purpose of this procedure is to provide the necessary spare parts needed to carry out planned overhaul of the Siemens SST300 steam turbine.

Supply of K225-130-2M turbine spare parts

 | Published November 9, 2017  -  Deadline November 8, 2017
cpvs

Delivery of K225-130-2M turbine spare parts according to the technical specification

Replacement of operator, engineering stations, interface, system of mechanical quantities, protections and Turbine-2 turbine regulator at TPP Maritsa East 2 EAD

ТЕЦ Марица изток 2 ЕАД | Published April 19, 2018  -  Deadline May 29, 2018
cpvs
72212150

Replacement of operator, engineering stations, interface, system of mechanical quantities, protections and Turbine-2 turbine regulator at TPP Maritsa East 2 EAD according to the Technical Terms.

Repair of gas turbine engines NK-14ST and NK-12ST.

„Булгартрансгаз“ ЕАД | Published January 14, 2016
cpvs
50000000, 42112300

Repair of gas turbine engines NK-14ST and NK-12ST

Supply of spare parts for turbine, electrical and CIP equipment and technical consultancy services

ТЕЦ Марица изток 2 ЕАД | Published June 8, 2018
cpvs
42113100

Supply of spare parts for turbine, electrical and CIP equipment and technical consultancy services, in two separate lots: First lot - Delivery of spare parts for turbine, electrical and CIP equipment; Second lot - Technical consulting services during the main, medium and emergency repairs of turbine, electrical and CIP equipment.