SIB14DS9002 Turbine Maintenance Platform

Sibelga | Published May 19, 2014  -  Deadline June 16, 2014
cpvs
50530000

Sibelga SIB14DS9002 Turbine Maintenance Quai The object of the procurement procedure is the following: preventive and corrective maintenance of the expansion turbine (Atlas Copco Type ETG 450 MS No. 6-99-013) located on the site of the Quai Mills, 16, 1000 Brussels and this connection to the filter input to the coupling with the alternator (AEG Type A5E 560 M48 - 02KB No. 00-508336); the latter being included in the scope of the market and the instrumentation, control and UPS (Uninterruptible Power Supply).

On site major overhaul of the steam turbine of the Ringvaart power plant STAG single shaft unit.

EDF Luminus | Published February 10, 2015
cpvs
45453000, 42112100

On site major overhaul of the steam turbine of the Ringvaart power plant STAG single shaft unit.

Supply and installation of wind turbine generators for the Norther offshore wind farm, and a long term service and availability agreement

Norther NV | Published October 21, 2016
cpvs
45251160, 31121330, 31121340

Supply and installation of wind turbine generators for the Norther offshore wind farm, and a long term service and availability agreement

Major Overhaul Allison 501-KC and/or power turbine GT22.

Fluxys Belgium S.A. | Published August 7, 2013  -  Deadline September 8, 2013
cpvs
50211210, 42112300, 42113300

Works on machine to be performed: — Major Overhaul of the gas generator Allison 501-KC, — Major Overhaul of the power turbine Dresser Rand GT22.

Realization two wind turbines

Gemeentebestuur Alken | Published November 26, 2015  -  Deadline February 10, 2016
cpvs
31121320

The Municipality of Alken wishes to proceed with the construction of two wind turbines in the municipal industrial Kolmen. One turbine will be placed on municipal property and for this purpose an agreement with building rights will be closed. 2nd turbine will be placed on private property in industrial Kolmen. The operator will close for placing these 2nd turbine in industrial Kolmen the necessary agreements themselves and this will add a certificate at registration. The company will, after obtaining the necessary permits to build and operate the wind turbines.

Financiering van een te bouwen turbine-alternator.

IVBO | Published January 19, 2012
Winner
ING België
cpvs
66100000

Financiering van de bouw van een turbine-alternator.

Delivery and commissioning of a wind turbine gearbox testing and research

Sirris | Published May 5, 2014
cpvs
42000000

The OWI-Lab invests in test and measurement infrastructure for research and innovation in the offshore wind energy. For example, in 2012 a large climate in Antwerp in use for testing large components of wind turbines. Since then, several test campaigns were carried out on different components. Because there is a lot of research have been identified on the behavior, the design and control of wind turbine gearboxes in extreme temperatures, the OWI-Lab wants to purchase a specific gear that will allow it to materialize this research. This contract includes the supply, instrumentation and commissioning of a wind turbine gearbox. The supplier is obliged to respect a strict delivery since the commissioning of the gearbox is scheduled for 1 March 2014. The contract will be explained in the specifications.

Delivery and commissioning of a wind turbine gearbox testing and research

Sirris | Published December 20, 2013  -  Deadline February 10, 2014
cpvs
42000000

The OWI-Lab invests in test and measurement infrastructure for research and innovation in the offshore wind energy. For example, in 2012 a large climate in Antwerp in use for testing large components of wind turbines. Since then, several test campaigns were carried out on different components. Because there is a lot of research have been identified on the behavior, the design and control of wind turbine gearboxes in extreme temperatures, the OWI-Lab wants to purchase a specific gear that will allow it to materialize this research. This contract includes the supply, instrumentation and commissioning of a wind turbine gearbox. The supplier is obliged to respect a strict delivery since the commissioning of the gearbox is scheduled for 1 March 2014. The command is further explained in the specification.

Delivery and commissioning of a wind turbine gearbox testing and research.

Sirris | Published December 21, 2013  -  Deadline February 10, 2014
cpvs
42000000

The OWI-Lab invests in test and measurement infrastructure for research and innovation in the offshore wind energy. For example, in 2012 a large climate in Antwerp in use for testing large components of wind turbines. Since then, several test campaigns were carried out on different components. Because there is a lot of research have been identified on the behavior, the design and control of wind turbine gearboxes in extreme temperatures, the OWI-Lab wants to purchase a specific gear that will allow it to materialize this research. This contract includes the supply, instrumentation and commissioning of a wind turbine gearbox. The supplier is obliged to respect a strict delivery since the commissioning of the gearbox is scheduled for 01.03.2014. The command is further explained in the specification.

Placement and commissioning of a turbine installation

VIVAQUA | Published May 11, 2016
cpvs
45315200, 42112000, 51133000, 22349611

Placement and commissioning of a turbine installation

Major Overhaul Allison 501-KC and power turbine GT22.

Fluxys S.A. | Published January 4, 2012  -  Deadline February 7, 2012
cpvs
42112300, 42113300, 50211210

Major Overhaul Allison 501-KC and power turbine GT22.

LANTIN - SPF JUSTICE - Remise en état de la turbine d'extraction dans les ateliers du bloc V

Régie des Bâtiments - Wallonie Région Est | Published February 10, 2017  -  Deadline February 23, 2017
cpvs

LANTIN - SPF JUSTICE - Remise en état de la turbine d'extraction dans les ateliers du bloc V: LANTIN - SPF JUSTICE - Remise en état de la turbine d'extraction dans les ateliers du bloc V

Delivery and commissioning of an offshore wind turbine transformer for testing and research

Sirris | Published May 5, 2014
cpvs
42000000

The OWI-Lab invests in test and measurement infrastructure for research, development and innovation in the offshore wind energy. For example, in 2012 a large climate in Antwerp in use for testing large components of wind turbines. Since then, several test campaigns were carried out on different components. Because there is a lot of research have been identified on the behavior, the design and control of wind turbine transformers at extreme temperatures, the OWI-Lab wants to purchase a specific transformer that will allow it to materialize this research. This contract includes the supply, instrumentation and commissioning of a wind turbine transformer. The supplier is obliged to respect a strict delivery since the commissioning of the transformer is scheduled for May 1, 2014. The contract will be explained in the specifications.

Delivery and commissioning of an offshore wind turbine transformer for testing and research

Sirris | Published January 29, 2014  -  Deadline March 25, 2014
cpvs
42000000

The OWI-Lab invests in test and measurement infrastructure for research, development and innovation in the offshore wind energy. For example, in 2012 a large climate in Antwerp in use for testing large components of wind turbines. Since then, several test campaigns were carried out on different components. Because there is a lot of research have been identified on the behavior, the design and control of wind turbine transformers at extreme temperatures, the OWI-Lab wants to purchase a specific transformer that will allow it to materialize this research. This contract includes the supply, instrumentation and commissioning of a wind turbine transformer. The supplier is obliged to respect a strict delivery since the commissioning of the transformer is scheduled for May 1, 2014. The command is further explained in the specification.

Delivery and commissioning of an offshore wind turbine transformer for testing and research.

Sirris | Published February 1, 2014  -  Deadline March 25, 2014
cpvs
42000000

The OWI-Lab invests in test and measurement infrastructure for research, development and innovation in the offshore wind energy. For example, in 2012 a large climate in Antwerp in use for testing large components of wind turbines. Since then, several test campaigns were carried out on different components. Because there is a lot of research have been identified on the behavior, the design and control of wind turbine transformers at extreme temperatures, the OWI-Lab wants to purchase a specific transformer that will allow it to materialize this research. This contract includes the supply, instrumentation and commissioning of a wind turbine transformer. The supplier is obliged to respect a strict delivery since the commissioning of the transformer is scheduled for May 1, 2014. The command is further explained in the specification.

Call for application to participate - Works and supplies related to the grid connection of the wind turbine project Left Phase 2

nv Wind aan de Stroom 2014 | Published September 27, 2016  -  Deadline October 17, 2016
cpvs
31320000

Engineering, supply, placing / executing, testing and hiring of purchasing stations / MS cabins with smart features and remote control, intra-park cable work and plumbing (power, data, FO communications) of the wind turbine project Left Phase 2, in which four wind turbines and possibly one additional wind turbine connected to Eandis (Intergem) at 15kV. The timing for implementation of the works will have to be agreed with the DNB and the turbine supplier. Final completion is currently expected in mid-2017.

Hydraulic turbines

EDF Lumlnus | Published April 5, 2013  -  Deadline May 8, 2013
cpvs
42112200

:Delivery and installation of 2 hydro turbine packages in Andenne. Since 1950's EDF Luminus operates a cascade of 6 low head, run-off river hydro power plants along the river Meuse in Belgium. EDF Luminus would like to upgrade one of those, Andenne, in operation since 1980. Plant is currently equipped with 3 horizontal axis Straflo units and 3.55m-diameter axial propeller runner. Capacity is 3,05 MWe per unit, under a maximum gross head of 5,35m and a flow of 75 m³/s. Scope of work is : replacement of 2 (optional 3) units (turbine and generator) within the existing infrastructure, modifications to this infrastructure to be kept as reasonable as possible. New units of a standard well-proven design should be rated with an output of min 2 MWe, under max head, and be able to operate with a minimum flow of 15 m³/s. They shall have a good flat efficiency curve all over the flow range. All configurations and runner type can be considered, as far as the needed civil works modifications do not compromise power plant general stability. Smaller runner diameter, with lower max flow, will be accepted. Scope will include: design, supply, site erection and commissioning of the whole electro-mechanical package, with anchoring parts, turbine governor, generator with excitation cabinet and cooling, lube oil system, common or separate for turbine and generator, instrumentation and control cabinet. Dismantling of existing units is part of the work. Civil work, including detailed study is not part of the scope (but can be proposed as an option), however anchoring of units will be performed under the supervision of the turbine manufacturer. Screens, stop logs and drainage system of the plant will remain unchanged.

hydraulic turbines

EDF Lumlnus | Published November 6, 2012
cpvs
42112200

:Supply of Hydro turbines Lixhe Project. Since 1950’s, SPE is operating a cascade of 6 low head, run-off river hydro power plants along the River. Meuse, in Belgium. Among those plants, the Lixhe power station (1980) needs rehabilitation works. Plant is now equipped with 4 horizontal axis Straflo units, 3,55m diameter axial propeller runner. Performance is 5,5 MWe per unit, under a maximum gross head of 7,8m and flow 85 m3/sec. Scope of works is replacement of two (optional 4) units (turbine & generator) within the existing civil works to be modified in a reasonable way. New units of a standard well proved design should be rated minimum 3,5 MWe under max head, and be able to operate at partial load with a minimum flow of 25 m3/sec (or less if possible). They should have a good flat efficiency curve all over the flow range. All configurations and runner type can be considered, as far as the needed civil works modification does not compromise power plant general stability. Smaller runner diameter, with lower maximum flow, will be accepted. Scope will include design, supply, site erection and commissioning for whole turbine, with anchoring pieces; turbine governor; generator with excitation cabinet and cooling; lube oil system common or separate for turbine and generator; instrumentation and control cabinet. Dismantling of existing units is part of site works. Civil work, including detail studies, is not part of scope (but can be optional proposed), however anchoring of unit will be performed under supervision of turbine manufacturer. Screens, stop logs and drainage system of the plant will remain unchanged

Civil works for the wind turbine project Left Phase 2 - ERRATUM

nv Wind aan de Stroom 2014 | Published November 16, 2016  -  Deadline November 17, 2016
cpvs
31121320

Execution of the civil works for the wind turbine project Left phase 2 in accordance with the detail of the technical part attached, including to:

-the removal and rearrangement of interfering utility lines within the yard area;

-Remove obstacles / infrastructure within the site area;

-the construction of access roads; and

-the digging of pits for the placement of the purchase station

Call for applications - Works and deliveries regarding grid connection of the wind turbine project phase 1 Left

nv Wind aan de Stroom 2013 | Published December 20, 2013  -  Deadline January 17, 2014
cpvs
31320000

Engineering, delivery, installation / execution, testing and putting into service of purchasing stations with smart features and remote control, cable works and connections (power, data, communications) of the wind turbine project Left Phase 1, in which nine wind turbines and possibly four additional wind turbines are connected to different voltage levels 15kV or 30kV.