Public tenders for energy in Cierny-balog Slovakia

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergySlovakiacierny-balog

Municipal office - construction work, village Lysa pod Makytou

MP Profit PB, s.r.o. | Published September 15, 2016  -  Deadline October 10, 2016
cpvs
45210000

The proposed construction works are reducing the energy intensity of the building (facade insulation and the ceiling of the top floor, window replacement, replacement of electrical installation including lighting), and the repair or replacement of damaged parts of the building. After carrying out structural modifications will be included in building energy rating between low energy buildings. For more information on the specifications.

Restoration and reconstruction of the buildings and the Special Elementary School Partizánske

MP Profit PB, s.r.o. | Published September 14, 2016  -  Deadline October 10, 2016
cpvs
45214230

Construction of special primary school located on ul. Gen. Freedom in Partizánske. Area elementary school is located on plot no. 4500, basic schools have the parcel number 4501. Renovation and reconstruction of the buildings and special primary schools addressing the following building structures: SO-01 Elementary School, SO-02 Elementary School, SO-03 farm buildings, SO-04 corridor. The property is located in flat terrain. Access to land is a special primary schools from the north and south sides. Around campus special primary school buildings are built residential buildings and civil objects. Project Renovation and reconstruction of the buildings and the Special Elementary School Partizánske is primarily focused on reducing energy intensity, also it includes renovation of construction and technical building solutions in accordance with applicable IEC standards and related regulations. More information is given in the tender documents.

Implementation of measures for energy saving buildings A, B, C, RÚVZ Banská Bystrica

Regionálny úrad verejného zdravotníctva so sídlom v Banskej Bystrici | Published September 14, 2016  -  Deadline October 17, 2016
cpvs
45000000

The contract works are focused on implementation of measures for energy saving buildings A, B, C RÚVZ Banská Bystrica in the range in terms of specifications.

Renovate the interior of the hospital - replacing windows and PVC flooring

BALA, a.s. | Published September 14, 2016
cpvs
45215130

The contract is to restore the interior hospital premises and the epidemiological burden space without epidemiological burden and sterile areas. Renovate the interior of the hospital includes the reconstruction of the building construction elements concerning windows and floors due to their bad technical condition, using better technology and innovative materials and systems. This ensures a positive addition to qualitative change mentioned structural elements and significant energy savings for heating. Interior restoration will take place during the operation of the hospital and will therefore put greater demands on management works. Object of the contract is specified in detail in the specifications, see "Description of the object of the contract".

Reduction in energy intensity - basic school for pupils with impaired communication skills, Brezolupy

MP Profit PB, s.r.o. | Published September 14, 2016  -  Deadline October 10, 2016
cpvs
45214230

Objects of the works to the reduction of energy intensity Primary Boarding School, which is located in the central part of the village Brezolupy. The complex consists of four buildings. Elementary school is a four-storey building. School building has one floor passage way connected to the three-storey facility serving as a dormitory. The campus is also a detached building boiler to heat in the school building. Purpose of individual objects will not change. Building boiler stops serve to heat the school building, reducing heat loss will be heating equipment moved directly to the school building. Construction work will not occur layout changes, breakdowns or facades for intervention in the structure of objects. The object of the construction work will reduce the energy intensity of buildings through insulation of exterior walls, roofs, ceilings above unheated spaces and through the exchange of doors and windows on the facade. Furthermore, the heating system is renovated, replaced light bulbs and will be transferred measurement, control and regulation of energy consumption. Due to the extensive destruction will be replaced roofing on the school. More information is given in the tender documents.

Public lighting for Letanovce village

Východoslovenská distribučná, a.s. | Published September 14, 2016
cpvs
50232000

The contract has as services associated with the provision of lighting in the municipality Letanovce. The contracting authority requires comprehensive service with lighting, consisting in assembling lighting system, ensure the required operational and technical level of the entire system of public lighting in the municipality, including the provision of all other related services and energy necessary for the proper functioning of the lighting throughout the village. Candidate of providing lighting for the whole village agreed for a regular monthly fee.

Reduce the energy intensity of the cultural house in Bátorove Kosihy

Obec Bátorove Kosihy | Published September 14, 2016
cpvs
45321000

The contract is the reconstruction of public buildings in the village Bátorove Kosihy to reduce the energy demand of the building. A detailed contract specifications stated in the specifications, design documents and bill of quantities.

SOS Electrical, Liptovský Hrádok- reduce the energy intensity of buildings - adjustment of window and facade panels - II. phase

TLM INVESTMENT s. r. o. | Published September 14, 2016
cpvs
45000000

The contract works are related to insulation cladding, insulation of roofs and replacement fillings window and door openings in buildings - SO 02 Pavilion B projects - SO 03 Pavilion C Laboratories - SO 04 Pavilion D connecting corridor

Reduction of energy intensity purpose-built facilities Sport Hall Prešov University

LASACHI, s.r.o. | Published September 13, 2016  -  Deadline October 14, 2016
cpvs
45000000

The project aims to reduce the energy intensity of the building, the overall embellishment building as a whole, to achieve energy savings in the operation of the building and Troubleshooting packing for structures (especially water leaking through the roof surface. The subject of the construction of a thermal insulation envelope structures, replacement of filling structures reduce some filling structures , replacement of the filling structures for full perimeter wall. It is proposed that a new technology for the production of heat in the boiler room, new technology for ventilation, air conditioning and recuperation. the proposal also addresses the installation of new lighting fixtures throughout the building, controlled lighting in the area above the playing surface and a new source production of electricity through photovoltaic panels. Subject of the contract is the breakdown: 01 Main building landmark building with 02 Kotolňa PS 01 e measurement control detailed specification is described in the design documentation and bill of quantities, which are part of the specifications.

Restoration and reduce the energy demand of the building urban services? Trencianske Teplice

Mesto Trenčianske Teplice | Published September 13, 2016  -  Deadline October 12, 2016
cpvs
45000000

Object of the contract: Restoration and reduce the energy demand of the building urban services Trenčianske Teplice. The contract is to restore the building and reduce the energy demand of the building urban services Trenčianske Teplice. Construction project proposal addresses the regeneration of urban services. SOLUTION The building is located in Trencianske Teplice, at Quartier SNP 154/71 on plots no. 2016/3 and 2016/4 on a flat area. Detailed specification, details and scope of the subject of the contract is given in the tender documents for this procurement.

Supply of electricity with the assumption of responsibility for deviation A SECURITY distribution services - for the city TRSTENÁ

Slovenské centrum obstarávania | Published September 13, 2016  -  Deadline October 6, 2016
cpvs
09310000

The contract is a regular supply of electricity to the points of delivery of the contracting authority and its legal entities, including transport and distribution, taking responsibility for variations in quality corresponding to the technical conditions of the distribution network in compliance with applicable provisions of the Slovak Republic, technical conditions and operating rules of the distribution network.

Supply of electricity for the town blue and the guarantees for the deviation

eBIZ | Published September 9, 2016  -  Deadline October 7, 2016
cpvs
09310000

The contract is the supply of electricity for the town of Modra and the guarantees for the deviation.

Modernization of the public lighting in the municipality Klasy

Obec Zlaté Klasy | Published September 8, 2016  -  Deadline August 10, 2016
cpvs
45315100

Modernization of the public lighting accessory as defined in the report and assessment in the village Klasy. The result will be the improvement of the technical infrastructure of the village. Due to the lack of technically and morally the state of public lighting will be part of the modernization and improvement of the original lamps of public lighting removed will be replaced with modern energy-saving LED lamps.

Reconstruction of AB Humenné District Prosecutor's Office in order to reduce energy intensity

Krajská prokuratúra v Prešove | Published September 8, 2016  -  Deadline October 4, 2016
cpvs
45000000

Construction works include reconstruction of one part of the office building, which is 5 storeys. Addressing insulation cladding, replacement of window and door panels, replacing plumbing construction and reconstruction of lightning.

Reconstruction of public lighting in the municipality Rohovce

Obec Rohovce | Published September 7, 2016  -  Deadline July 10, 2016
cpvs
45315100

Reconstruction of public lighting accessory as defined in the report and assessment in the village cornea. The result of the reconstruction of public lighting, improving the technical infrastructure of the village. Due to the lack of technically and morally the state of public lighting will be part of the modernization and improvement of the original lamps of public lighting removed will be replaced with modern energy-saving LED lamps.

Upgrading public lighting in the municipality Oponice

Obec Oponice | Published September 7, 2016  -  Deadline July 10, 2016
cpvs
45315100

Upgrading public lighting accessory as defined in the report and assessment in the village of Oponice. The result will be the improvement of the technical infrastructure of the village. Due to the lack of technically and morally the state of public lighting will be part of the modernization and improvement of the original lamps of public lighting removed will be replaced with modern energy-saving LED lamps.

Reconstruction of public lighting of the village Nadlice

Obec Nadlice | Published September 7, 2016  -  Deadline July 10, 2016
cpvs
45315100

Reconstruction of public lighting accessory as defined in the report and assessment in the village Nadlice. The result of the reconstruction of public lighting, improving the technical infrastructure of the village. Due to the lack of technically and morally the state of public lighting will be part of the modernization and improvement of the original lamps of public lighting removed will be replaced with modern energy-saving LED lamps.

Modernization of the public lighting in the village Blahová

Obec Blahová | Published September 7, 2016  -  Deadline July 10, 2016
cpvs
45315100

Modernization of the public lighting accessory as defined in the report and assessment in the village Blahová. The result of the modernization of public lighting, improving the technical infrastructure of the village. Due to the lack of technically and morally the state of public lighting will be part of the modernization and improvement of the original lamps of public lighting removed will be replaced with modern energy-saving LED lamps.

Modernization of the public lighting in the municipality Zbehy

Obec Zbehy | Published September 7, 2016  -  Deadline July 10, 2016
cpvs
45315100

Modernization of the public lighting accessory as defined in the report and assessment in the municipality Zbehy. The result will be the improvement of the technical infrastructure of the village. Due to the lack of technically and morally the state of public lighting will be part of the modernization and improvement of the original lamps of public lighting removed will be replaced with modern energy-saving LED lamps.

Restoration of the apartment building aimed at reducing the energy consumption of buildings

ER - STAVING s.r.o. | Published September 7, 2016  -  Deadline September 30, 2016
cpvs
45211000

Restoration of the apartment building, aimed at reducing the energy consumption of buildings in Roznava on West Ave no. One hundred and first