Public tenders for energy in Cierny-balog Slovakia

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergySlovakiacierny-balog

Restoration of the apartment building aimed at reducing the energy consumption of buildings

ER - STAVING s.r.o. | Published September 7, 2016  -  Deadline September 30, 2016
cpvs
45211000

Restoration of the apartment building, aimed at reducing the energy consumption of buildings in Roznava on West Ave no. One hundred and first

Reduce the energy demand of the building of the University Library of the University of Žilina

HASTRA s.r.o. | Published August 18, 2016
cpvs
45000000

The contract has as works to improve the energy performance of the building of the University Library by detailed specification contained in the tender documents.

Reduction of energy intensity of public buildings - the cultural center in Bátorove Kosihy

Obec Bátorove Kosihy | Published June 28, 2016
cpvs
45321000

The contract is the reconstruction of public buildings in the village Bátorove Kosihy to reduce the energy demand of the building.

Addressing energy efficiency OcÚ building in the village of Kamenica Cirochou.

STAVOCONZULT, spol. s r.o. Michalovce | Published July 8, 2016  -  Deadline August 8, 2016
cpvs
45000000

The contract is the realization of works buildings Addressing energy efficiency building in the village OcÚ Kamenicanad Cirochou.

Increasing energy efficiency in the building of the kindergarten Liešťany

PLEX s.r.o. | Published July 19, 2016
cpvs
45214100

The purpose of the project is to increase energy efficiency in the building of kindergarten Liešťany. On the object in the project proposes to implement the following changes: the implementation of the thermal insulation composite system of exchange of the structures, including the sills thermal insulation of flat roofs with 01 insulation and reconstruction aisle roofs SO 02 Change flat roof with 03 on pitched roofs and insulation of original roofs Implementation of lightning to SO 02 and SO 03 Replacement of lighting, heating reconstruction and recovery, minor construction work related to the restoration of buildings Draft amendment shall be applied in order to: Reduce energy requirements object with direct light on the environment, delete the system failure, prolong the service life of building structures, ensure user safety. The layout of objects remains unchanged. The proposed solution for restoring the building as far as possible, which is the original design and shape of the object, trying all parts of the complex architecturally unified.

Restoration and reduce the energy demand of the building urban services? Trencianske Teplice

Mesto Trenčianske Teplice | Published September 13, 2016  -  Deadline October 12, 2016
cpvs
45000000

Object of the contract: Restoration and reduce the energy demand of the building urban services Trenčianske Teplice. The contract is to restore the building and reduce the energy demand of the building urban services Trenčianske Teplice. Construction project proposal addresses the regeneration of urban services. SOLUTION The building is located in Trencianske Teplice, at Quartier SNP 154/71 on plots no. 2016/3 and 2016/4 on a flat area. Detailed specification, details and scope of the subject of the contract is given in the tender documents for this procurement.

Reduction of energy intensity ME May 9 in Bánovce nad Bebravou

Visions Consulting, s.r.o. | Published July 12, 2016  -  Deadline August 2, 2016
cpvs
45214100

The project addresses the restoration of buildings construction thermal insulation of external walls of brick thick. 450 mm contact insulation system of expanded polystyrene hr. 120 mm. The roof is flat and will additionally insulated polystyrene th. 200 mm. The building has central heating and insulation is being considered for the regulation of the heating system. Relamping pursues energy savings. These structural modifications of projects aiming to achieve savings in energy consumption, as well as the revitalization of the architectural appearance of the building.

Reduce the energy intensity of the municipal office in the Convent Znievom

SAND SK, s. r. o. | Published September 2, 2016  -  Deadline February 10, 2016
cpvs
45262650

The contract is to reduce the energy intensity of the municipal office building. The works will consist of the following: - complete insulation of exterior walls and balconies, - replacement of roofing on the part of the building - insulation ceiling highest floor - insulation of floors - Exchange fills the window openings and entrance doors - Reconstruction of internal wiring - reconstruction of the heating system .

Reduction of energy intensity of public buildings in the village Rakova - Kindergarten Korcháň

E-VO, s.r.o. | Published July 14, 2016  -  Deadline August 9, 2016
cpvs
45000000

The contract is to reduce the energy intensity of buildings kindergarten Korcháň no. 1070 in the village Rakova: replacement of doors and windows, other, cladding, ceiling insulation, roof coatings, HVAC, electrical, surfacing after completion Elektra.

Window replacement - reducing energy consumption in building homes for the elderly Lamac

Window holding SK, a.s. | Published June 28, 2016
cpvs
45454000

The contract is of works, window replacement - reducing energy consumption in building homes for the elderly Lamač Studenohorská 5, 841 03 Bratislava, which description is given in the accompanying drawings, yet the bill of quantities (supplied on CD).

Rehabilitation of public buildings in the village of Nova Ves Drienovská to reduce energy intensity

Ing. Viliam Čech | Published June 17, 2016
cpvs
45000000

The project aims to achieve energy savings in the operation of the building, eliminating thermal bridges induced disorders, as well as overall improving the aesthetics of the building. The heat is produced from its own heat source.

Reduction of energy intensity purpose-built facilities Sport Hall Prešov University

LASACHI, s.r.o. | Published September 13, 2016  -  Deadline October 14, 2016
cpvs
45000000

The project aims to reduce the energy intensity of the building, the overall embellishment building as a whole, to achieve energy savings in the operation of the building and Troubleshooting packing for structures (especially water leaking through the roof surface. The subject of the construction of a thermal insulation envelope structures, replacement of filling structures reduce some filling structures , replacement of the filling structures for full perimeter wall. It is proposed that a new technology for the production of heat in the boiler room, new technology for ventilation, air conditioning and recuperation. the proposal also addresses the installation of new lighting fixtures throughout the building, controlled lighting in the area above the playing surface and a new source production of electricity through photovoltaic panels. Subject of the contract is the breakdown: 01 Main building landmark building with 02 Kotolňa PS 01 e measurement control detailed specification is described in the design documentation and bill of quantities, which are part of the specifications.

Restoring envelope structures of the municipal office in the village Číž - reducing energy intensity

PLEX s.r.o. | Published June 13, 2016
cpvs
45210000

Restoration is to reduce the energy intensity of the building and improvement of the technical condition of the building. To reduce the energy intensity of buildings, reduce the cost of heating and lighting, improving the quality of packaging products, indoor thermal comfort and modernization of the buildings have been designed following measures: insulation cladding insulated roof and replacement of roofing replacement of opening constructions reconstruction of heat sources and radiators installation of thermoregulation valves the radiator and hydraulic balancing of heating systems building replacement of light sources for LED installation thermodynamic panels to support heating and domestic hot water

Reduction of energy intensity of public municipal office building and cultural house Kuzmice

Obec Kuzmice | Published July 20, 2016
cpvs
45000000

Upgrading, renewal and reduce energy consumption and operating costs of public buildings Kuzmice village amenities. Further described in the specifications B.1 Description of the object of the contract specifications and the Annex, which is the design of the works and a statement - Area (unappreciated). All this is bound to and the subject of the contract is the subject of a transaction which is the realization of the work.

Reduction in energy intensity - basic school for pupils with impaired communication skills, Brezolupy

MP Profit PB, s.r.o. | Published September 14, 2016  -  Deadline October 10, 2016
cpvs
45214230

Objects of the works to the reduction of energy intensity Primary Boarding School, which is located in the central part of the village Brezolupy. The complex consists of four buildings. Elementary school is a four-storey building. School building has one floor passage way connected to the three-storey facility serving as a dormitory. The campus is also a detached building boiler to heat in the school building. Purpose of individual objects will not change. Building boiler stops serve to heat the school building, reducing heat loss will be heating equipment moved directly to the school building. Construction work will not occur layout changes, breakdowns or facades for intervention in the structure of objects. The object of the construction work will reduce the energy intensity of buildings through insulation of exterior walls, roofs, ceilings above unheated spaces and through the exchange of doors and windows on the facade. Furthermore, the heating system is renovated, replaced light bulbs and will be transferred measurement, control and regulation of energy consumption. Due to the extensive destruction will be replaced roofing on the school. More information is given in the tender documents.

Analytical services, check and adjust the dosage of chemical products in the boiler water in the building energy center AOS.

FINECON, s.r.o. | Published July 11, 2016  -  Deadline November 8, 2016
cpvs
65120000

Servicing, check and adjust the dosage of chemical products, including their delivery at monthly intervals during the energy center of the customer.

SOS Electrical, Liptovský Hrádok- reduce the energy intensity of buildings - adjustment of window and facade panels - II. phase

Žilinský samosprávny kraj | Published April 13, 2016  -  Deadline May 6, 2016
cpvs
45000000

SOS Electrical, Liptovský Hrádok- reduce the energy intensity of buildings - adjustment of window and facade panels - II. phase

Reduction of energy intensity ME May 9 in Bánovce nad Bebravou

Mesto Bánovce nad Bebravou | Published June 23, 2016
cpvs
45214100

The project addresses the restoration of buildings construction thermal insulation of external walls of brick thick. 450 mm contact insulation system of expanded polystyrene hr. 120 mm. The roof is flat and will additionally insulated polystyrene th. 200 mm. Replacement of windows and doors will be made of plastic profiles with aesthetical medicine Triple glazing. The aim is to improve the energy efficiency of the pavilions of the kindergarten the following measures: - renovation and modernization of building structures - Hydraulic regulation of individual pavilions - reconstruction and modernization of lighting

Reduction of energy intensity of buildings elementary schools and kindergartens In AIR MUSEUM

Adifex a.s. | Published June 20, 2016
cpvs
45000000

Building in question was located in the village Turčianska Štiavnička to parc.č. 716/1, kat.úz. AIR MUSEUM. The property is located in an urban zone. It is flat and no part of it is not in the protection zone. Transport connections are unchanged from local roads. The building is connected to the original water supply, sewage and electricity, to which it does not. The intention of the construction works to ensure the reduction of energy intensity of buildings existing building primary and nursery schools.

Increase the energy efficiency of the kindergarten in the village of Dlhé

Obec Dlhé Klčovo | Published June 21, 2016
cpvs
45214100

The contract is the insulation of walls, roofs, ceilings and floors, replacement of windows and entrance doors, lighting replacement, reconstruction and balancing the hot water heating system. Kindergarten buildings consists of basement storey building. The supporting system of the building make the original brick walls of natural stone walls and outbuildings conducted by gas-silicate blocks of aerated hr. 300 and 400. Roofing of the building consists of a wooden shed roof with roofing made of folded galvanized sheet metal ceilings are wooden beams. Covered by any extension consists of single-shell unventilated flat roofs with roof coating engraving of laminated asphalt felts, supporting structures covered by any extension of the reinforced concrete ceiling panels PZD. In the current state of the building in terms of energy far exceeds the basic specific heat demand for heating, taking into account form factor is nevyregulovaná heating system, lighting of the building is inefficient.