Call +44 800 9755 164

Public tenders for energy in Bratislava Slovakia

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergySlovakiabratislava

Prešov, barracks SNP- increase energy efficiency in buildings

Ministerstvo obrany Slovenskej republiky - Akvizičná agentúra | Published July 12, 2016  -  Deadline December 8, 2016
This is the execution of works specifically for military purposes in the field of defense and security. The contract is construction work at six in the barracks SNP in Presov to improve the thermal performance of external walls and roofs of their insulation and replacement of window panes. After the insulation is necessary balancing of the heating system. The order is the removal of lightning and insulation for the reassembly. Object of the contract is located in a military complex, used for specifically military purposes, and fall under the protection regime of entry into the building because of the elimination of the movement of foreign persons in military buildings.

Innovation in the production of low cost houses

Úrad pre verejné obstarávanie | Published November 24, 2016  -  Deadline December 27, 2016
Logical unit 1: Production of roof - angular cut-off saw logic unit 2: Lines for wooden houses - accessories logical unit 3: CAD / CAM software system for low-energy prefab houses detailed technical specification is part of the tender specifications (Annex No. 2.1, and C.2.2 C.2.3).

Implementation of innovative production processes running Brewery Carpathians and manufacturing processes for the production of innovative natural products

Úrad pre verejné obstarávanie | Published November 30, 2016  -  Deadline January 18, 2017
The subject of the contract is a comprehensive technology for cooking and fermentation of malt wort drink and drink lying Cider including ingeenieringu. The present technology are mutually connected by containers and by mode of technology so as to be logically included in the system, corresponding to different phases of the production cycle of the two drinks in order to obtain maximum synergy with the labor and various forms of energy. A necessary and important parameter arrangement coherent technology is the perfect way of sanitation so as not so. blind spots of possible microbial infections, the occurrence of which have highly negative effects on product quality and economy brewery.

Natural gas

Hlavné mesto SR Bratislava | Published November 11, 2016  -  Deadline December 15, 2016

The contract is the supply of natural gas to points of delivery of the Slovak capital Bratislava and the organizations in its scope, including transportation, distribution and services related to gas supply, taking responsibility for deviation, standard equivalent to the technical conditions of the distribution network in compliance with applicable provisions Slovakia, technical and operating rules of the distribution network.

Expected scope of our energy will be provided in section B.1 specifications designated as a description of the subject of the contract and in the statement annexed to the no. 1 specifications.

Industrial machinery

Distrib Capital, s.r.o. | Published November 29, 2016  -  Deadline January 16, 2017

The subject of the contract is a comprehensive technology for cooking and fermentation of malt wort drink and drink lying Cider including ingeenieringu. The present technology are mutually connected by containers and by mode of technology so as to be logically included in the system, corresponding to different phases of the production cycle of the two drinks in order to obtain maximum synergy with the labor and various forms of energy. A necessary and important parameter arrangement coherent technology is the perfect way of sanitation so as not so. blind spots of possible microbial infections, the occurrence of which have highly negative effects on product quality and economy brewery.

The subject of the contract is a comprehensive technology for cooking and fermentation of malt wort drink and drink lying Cider including ingeenieringu. The present technology are mutually connected by containers and by mode of technology so as to be logically included in the system, corresponding to different phases of the production cycle of the two drinks in order to obtain maximum synergy with the labor and various forms of energy. A necessary and important parameter arrangement coherent technology is the perfect way of sanitation so as not so. blind spots of possible microbial infections, the occurrence of which have highly negative effects on product quality and economy brewery.

The exact specification of the procurement of equipment and technical parameters are defined in Annex no. 1 specifications Description of the object of the contract.

Building and facilities management services

Bratislavský samosprávny kraj | Published December 3, 2016  -  Deadline December 18, 2016

The contract is the operation, maintenance and repairs of the property BOD, in particular:

- Operation of real estate and facilities.

- Preventive maintenance and servicing of equipment and property,

- Maintenance and repair,

- Special inspections and tests listed equipment, fire-technical equipment and maintenance of technical equipment,

- environmental Protection,

- Energy management and technical infrastructure,

- Proposes measures to streamline and modernize the property,

- Reporting.

Detailed definition of the object of the contract set out the specifications.

Natural gas supply to branches FORESTS Slovak Republic, state enterprise Banská Bystrica

Úrad pre verejné obstarávanie | Published November 4, 2016  -  Deadline December 6, 2016
The contract is: by repeated gas supply for strednoodber and small consumers to take-off points FORESTS Slovak Republic, state enterprise Banská Bystrica and its branch offices, including transportation and distribution of natural gas for heating and domestic hot water for technological purposes, the responsibility for deviation to guarantee supplies for the entire duration of the contract, a quality conforming to the technical conditions of the distribution network in compliance with the legislation of the Slovak Republic, technical and operational rules of operation of gas distribution network in the period from 6:00 pm. on 01.01.2017 to 6:00 pm. on 01.01.2019 with the guarantee of supplies throughout the duration of the contract in accordance with Act 251/2012 Coll on Energy and amending certain laws, as amended, and Act No.250 / 2012 on Regulation in Network Industries and on amendments to certain acts (regulatory the law).
  • 1