Call +44 800 9755 164

Public tenders for energy in Slovakia

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergySlovakia

OU reconstruction aimed at reducing energy intensity

Obec Lopašov | Published March 8, 2017  -  Deadline April 3, 2017
cpvs
45000000

The contract is the realization of works of "Reconstruction OU aimed at reducing energy intensity". Details are provided in the tender documents.

OU reconstruction aimed at reducing energy intensity

Obec Lopašov | Published March 20, 2017  -  Deadline April 12, 2017
cpvs
45000000

The contract is the realization of works of "Reconstruction OU aimed at reducing energy intensity". Details are provided in the tender documents.

OU reconstruction aimed at reducing energy intensity

PREVAX s.r.o. | Published March 20, 2017  -  Deadline April 12, 2017
cpvs
45000000

The contract is the realization of works of "Reconstruction OU aimed at reducing energy intensity". Details are provided in the tender documents.

Reduction of energy intensity kindergarten buildings SH Vajanského, Michalovce

Mesto Michalovce | Published March 28, 2017  -  Deadline May 3, 2017
cpvs
45214100

The subject of the contract solutions ie reducing the energy intensity of the building cladding, skirting and roof, replacement windows, doors, plumbing and locksmith products. Facade of the building is brought contact insulation system made of mineral wool, without changing the existing state of breakdown. The windows are plastic with insulating triple glazing and interior and exterior window sills. Plastic entrance doors. It implemented the interior lighting replacement lamps object to the prepared standardized rate the energy performance of the building. Within the plumbing it is addressed reduce the energy intensity of building new solution DHW according to the requirements of the energy audit and the resulting technical solutions for connection to water supply and sanitation. Based on the processing of the energy audit for compliance with a multiplicity of air exchange rate n of 0.5 / hr, is achieved by installation of a forced cooling retrospective recovery of waste heat.

Reducing the energy intensity of the administrative building Čenkovce

EPIC Partner a.s. | Published March 28, 2017  -  Deadline April 19, 2017
cpvs
45000000

The contract is construction work to reduce the energy demands of public buildings in the village Čenkovce in terms of specifications.

Reduction of energy intensity of culture in the tunicates

EPIC Partner a.s. | Published March 28, 2017  -  Deadline April 19, 2017
cpvs
45000000

The contract is construction work to reduce the energy demands of public buildings in the village Plášťovce in terms of specifications.

Reduction of energy intensity kindergarten in the village Čalovec

EPIC Partner a.s. | Published March 28, 2017  -  Deadline April 19, 2017
cpvs
45000000

The contract is construction work to reduce the energy demands of public buildings in the village Čalovec in terms of specifications.

Kindergarten Trenčianske Stankovce - Increasing the energy efficiency of buildings

Ing. Rastislav Tapšák | Published March 9, 2017  -  Deadline April 3, 2017
cpvs
45214100

The project aims to increase the energy efficiency of existing building of the kindergarten (the nursery) in the village Trenčianske Stankovce

Reduce energy intensity MUNICIPAL BUILDINGS IN THE VILLAGE ČIČAVA

Obec Čičava | Published March 28, 2017  -  Deadline May 4, 2017
cpvs
45210000

The contract is construction work building to reduce energy intensity. Detailed specifications of the contract is included in Annex no. 1 specifications.

KD improve energy efficiency in the municipality of Munich period

Obec Mníchova Lehota | Published March 28, 2017  -  Deadline April 28, 2017
cpvs
45321000

Subject matter is defined by the construction project "Improving energy efficiency in the municipality of Munich KD period", who made Ing. Agam Margoč - AMKO, Jilemnického 2 911 01 Trenčín, z.č. 09-2014 in July, 2014. For details of the specifications.

Increasing energy efficiency kindergarten in the village Čenkovce

Obec Čenkovce | Published March 17, 2017  -  Deadline April 11, 2017
cpvs
45214100

The contract is to increase the energy efficiency of the kindergarten, which consists of works including the protection of thermal insulation on the roof, replacement of gas central heating, balancing the entire heating system and replacement of all doors and windows object.

Reducing the energy intensity of the Municipal Office Zelenice

Verejné obstarávanie-Mária Beňušová | Published March 28, 2017  -  Deadline April 21, 2017
cpvs
45213150

The contract is to reduce the energy intensity of the municipal office in the town Zelenice. Project documentation solves the construction work of the Office to reduce energy consumption and will be addressed below described modifications: thermal insulation of walls and skirting board, replacement of windows and entrance zasklennej walls, demolition of the entrance to the attic, the implementation of the concrete ceiling, roof removal and installation of a new, roof insulation, total replacement of electrical, solution-saving lighting solution DHW heating, new electrical connection, photovoltaic solution, solution heat pump heating with heat recovery, new lightning rod. The building is designed as a structural modification without changing the existing footprint and shape of the building. Retain the size and shape of the window and door openings. Converts the replacement window and door panels, insulation of external walls. Remove the unsatisfactory roof and made new with a smaller slope. The interior of the building will make wiring and heating, without structural modifications.

Increasing the energy efficiency of the cultural house in the village Pavlovce over Uhom

Obec Pavlovce nad Uhom | Published March 22, 2017  -  Deadline April 19, 2017
cpvs
45000000

Increasing the energy efficiency of the cultural house in the village Pavlovce over Uhom

Reduce the energy demand of the building a cultural center in the village of Great Uherce

Obec Veľké Uherce | Published March 27, 2017  -  Deadline May 3, 2017
cpvs
45000000

Reduce the energy demand of the building a cultural center in the village of Great Uherce

Reduce the energy performance of buildings vocational schools RELATED PROGRAMS IN NEW SPIŠSKÁ VSI

Spojená škola | Published March 28, 2017  -  Deadline April 21, 2017
cpvs
45214200

The contracting authority shall require the applicant to ensure the implementation of the work Reducing the energy intensity of building a vocational school in the United School Ves - works in the project Reducing energy intensity of buildings connected schools in Ves funded by the grant from the European Union.

Culture house Old Mountain - reduction of energy intensity

Obec Staré Hory | Published March 7, 2017  -  Deadline March 31, 2017
cpvs
45212300

The contract is the execution of construction works Culture House Old Mountain reduction of energy intensity by the construction project prepared by designer ING. ARCH. Emil crisis and in accordance with the building permit no. 413/2016 / will be issued on March 21, 2016 Detailed specification of the subject of the contract, including the development of technical specifications, forms part of the specifications B.1 Description of the object of the contract

Reduction in primary energy demand Kindergarten Sečovská Polianka

Tenderteam. s.r.o. | Published March 24, 2017  -  Deadline May 16, 2017
cpvs
45000000

The aim of this project solution is to reduce primary energy demand in buildings kindergarten Sečovská Polianka, localized near the main road No. 79 at the elementary school. Access to the design of the building is provided directly from the state road is paved access road. In the area of ​​kindergarten are three separate construction facilities used for the purposes of the municipality and pre-school education. Objects are on plots p.č.1825, 1826, 1827/3.

Reduce energy consumption of buildings in pre-school - kindergarten Railway

MP Profit PB, s.r.o. | Published March 28, 2017  -  Deadline April 27, 2017
cpvs
45210000

Kindergarten is located on a street railway in Považská Bystrica housing estate Central. Kindergarten consists of four pavilions as classroom (three 2-storey + one ground) and ground-level economic pavilion. The layout of the object and purpose will not be changed. Entry to the building is wheelchair accessible. The project addresses the design of measures to reduce the energy intensity of buildings on three 2-storey pavilions as classroom and on Economic pavilion. It is proposed to complete facade insulation systems ETICS with boards based on stone wool hr. 150mm, replacing the original wooden window and door frames with new plastic with insulation 3-glass, roof insulation boards EPS-S150 hr. 250mm new waterproofing PVC-P film. As technical measures to reduce energy intensity solved pavilion kindergarten is designed to install a system of forced ventilation with heat recovery (recuperation) and the replacement of light sources (lamps). More information is given in the tender documents.

Reduction in primary energy demand of the building of the Municipal Office and kindergartens, Kaľava

Tenderteam, s.r.o. | Published March 24, 2017  -  Deadline May 30, 2017
cpvs
45000000

The aim of this project solution is to reduce primary energy demand public utility facilities in the village Kaľava. Reduction of energy intensity object consists of the following components: 1. Insulation of exterior walls 2. Replacement of windows, doors and glazed wall 3. 4. Warm roof cladding ceiling cellars 5. Reconstruction of heating and heat pump 6. Reconstruction of sidewalks gutter 7. Ventilation and Air Conditioning Building 8. Measurement and control and electrical installation gas boiler 9. Disabled entrances to buildings

Reduce energy consumption of buildings in pre-school - kindergarten ROZKVET

MP Profit PB, s.r.o. | Published March 28, 2017  -  Deadline April 27, 2017
cpvs
45210000

Works Modernization and reconstruction of the premises and buildings of the kindergarten heyday is primarily focused on reducing energy intensity, also it includes the recovery of construction and technical design of buildings in accordance with applicable IEC standards and related regulations. Modernization and reconstruction of the premises and kindergarten buildings construction solves the following objects: SO-01 Nursery school-pavilion and SO-02 Kindergarten-Pavilion B, SO-03 Nursery school-Pavilion C, SO-04 Economic pavilion, S0.06- Connection corridor, S0.07- connecting corridor. More information is given in the tender documents.