Call +44 800 9755 164

Public tenders for energy in Slovakia

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergySlovakia

The building's schools Nižná Salt; Increase energy efficiency through intelligent energy management

ABIZ s.r.o. | Published November 9, 2016  -  Deadline December 8, 2016
The contract is to increase the energy efficiency of buildings. Increasing energy efficiency will require thermal insulation of external structures, including the floor and ceiling and replacing all doors and windows on the facade of the building. Architectural design will change and partly by supplementing architraves around the windows and skylights neoplasm of the original triangular shape to a rectangular shape. Construction and technical solutions in the form of intelligent energy management required a new distribution of heat and electricity. energy.

Increasing the energy efficiency of the Faculty of Law UMB, Komenského 20, 974 01 Banská Bystrica

Euro Dotácie, a.s. | Published October 26, 2016  -  Deadline December 1, 2016
The contract works are aimed at reducing the energy intensity of the Faculty of Law Matej Bel University. The proposed construction works represent the insulation of roofs, insulation of external walls solved, reconstruction exterior lighting and the installation of forced ventilation with heat recovery in addressing the building. The project concerns the building of the school - tracts A, B, C, D and E. For more information, refer to the specifications.

Increasing the energy efficiency of buildings Philosophical Faculty of UMB, Tajovského 57, 974 01 Banská Bystrica

Euro Dotácie, a.s. | Published October 26, 2016  -  Deadline December 1, 2016
The contract is: 1. Reducing energy intensity as classroom space sport in building the sports complex Matej Bel University (includes - insulation cladding, replacing the original windows, glass-concrete panels, doors, new ones with Triple glazing, cladding the ceiling in the attic of a new hipped roof, new hot-water heating system connected to district heating based on natural gas, solar system - 15 flat plate collectors, 1,500 liter capacity solar water heater; reconstruction of fluorescent lighting with electronic ballast; Forced ventilation with heat recovery in the locker room with showers), second change the disposal of the layout and size of each room, 3rd floor next new superstructure ie the second floor in order to get new space for teaching. More information is given in the tender documents.

Petroleum products, fuel, electricity and other sources of energy

Mesto Poprad | Published November 26, 2016  -  Deadline December 1, 2016

2.1. The contract called electricity and gas supply of electricity and gas, including the secure distribution to various points of supply for the city of Poprad, including responsibility for deviation.

Prešov, barracks SNP- increase energy efficiency in buildings

Ministerstvo obrany Slovenskej republiky - Akvizičná agentúra | Published July 12, 2016  -  Deadline December 8, 2016
This is the execution of works specifically for military purposes in the field of defense and security. The contract is construction work at six in the barracks SNP in Presov to improve the thermal performance of external walls and roofs of their insulation and replacement of window panes. After the insulation is necessary balancing of the heating system. The order is the removal of lightning and insulation for the reassembly. Object of the contract is located in a military complex, used for specifically military purposes, and fall under the protection regime of entry into the building because of the elimination of the movement of foreign persons in military buildings.

Petroleum products, fuel, electricity and other sources of energy

Zoologická záhrada Košice | Published November 17, 2016

The contract has been associated supplies of electricity and natural gas for zoos Košice. The contract has been divided into lots. The contract was fixed at 24 months.

Reducing energy intensity pavilion No.17 UVLF in Kosice

Univerzita veterinárskeho lekárstva a farmácie v Košiciach | Published November 10, 2016  -  Deadline December 8, 2016
Order to carry out reconstruction of the building Pavilion No. 17 is extend the life of the building construction to perform other modifications which attain or improve the functional properties desired, remove the shortcomings, failures and obsolescence.

Reconstruction of the administrative building (premises) for housing with the creation of nine housing units in the municipality Balog nad Ipľom

Externé obstarávanie s.r.o. | Published November 25, 2016  -  Deadline December 15, 2016
The contract is construction work on the residential areas of the premises. This is a 9 housing units and the reconstruction and habitability of the attic. The aim is to create energy efficient building lower standard for smaller families or for financially unwell-off family. More information can be found in the project documentation.

Reconstruction of pre-school - kindergarten Hrebendova, Lunik IX in Kosice "construction work"

Mesto Košice | Published November 22, 2016  -  Deadline December 21, 2016
Of works as follows: extension of the new single-storey pavilion for two classes, ie 44 pupils reconstruction of existing and construction of the passage treatment for thermal roof structure. Overall represent structural modifications of existing buildings 26% packaging structure, which means that it is a major renovation of the minimum requirements for the energy performance of buildings. Part of building modifications and extensions are construction works to ensure the supply of energy, water and waste solutions, new fencing.

Comprehensive modernization of public lighting around Malacky - II. phase

Mesto Malacky | Published December 8, 2016  -  Deadline January 17, 2017
The subject of this contract is II. stage of comprehensive modernization of the public lighting city Malacky, in accordance with specified requirements of the contracting authority on the subject of the contract, including related services in order to increase the energy efficiency of its operation and reducing maintenance costs, in accordance with the appropriate legislative measures in order to achieve a higher level of efficiency and efficiency of the public lighting, higher energy and luminous efficiency and savings in overhead costs of public lighting. A detailed definition of works specified in the tender documents and project documentation, which is part of the specifications.

Innovation in the production of low cost houses

Úrad pre verejné obstarávanie | Published November 24, 2016  -  Deadline December 27, 2016
Logical unit 1: Production of roof - angular cut-off saw logic unit 2: Lines for wooden houses - accessories logical unit 3: CAD / CAM software system for low-energy prefab houses detailed technical specification is part of the tender specifications (Annex No. 2.1, and C.2.2 C.2.3).

Modernization, operation and maintenance of the public lighting of the village Tuchyňa using LED technology

AE group, s.r.o. | Published November 8, 2016  -  Deadline December 6, 2016
Modernization, operation and maintenance of the public lighting with its accessories defined in the report and assessment vobci Tuchyňa. The result will be the improvement of the technical infrastructure of the village. Due knedostatočnému technically amoral state of outdated public lighting will be within the original askvalitnenia modernization of public lighting lamps removed will be replaced with modern energy-saving LED lamps.

Implementation of innovative production processes running Brewery Carpathians and manufacturing processes for the production of innovative natural products

Úrad pre verejné obstarávanie | Published November 30, 2016  -  Deadline January 18, 2017
The subject of the contract is a comprehensive technology for cooking and fermentation of malt wort drink and drink lying Cider including ingeenieringu. The present technology are mutually connected by containers and by mode of technology so as to be logically included in the system, corresponding to different phases of the production cycle of the two drinks in order to obtain maximum synergy with the labor and various forms of energy. A necessary and important parameter arrangement coherent technology is the perfect way of sanitation so as not so. blind spots of possible microbial infections, the occurrence of which have highly negative effects on product quality and economy brewery.

Woodworking equipment

DrevoDom – Zvolen s.r.o. | Published November 17, 2016

Logical unit 1: Production of roof - angular cut-off saw.

Logical unit 2: Lines for wooden houses - accessories.

Logical unit 3: CAD / CAM software system for low-energy prefab houses.

Detailed technical specifications are part of the tender specifications (Annex. 2.1, no. 02/02 and no. 03/02).

Miscellaneous special-purpose machinery

Polyston s.r.o. | Published November 11, 2016  -  Deadline December 5, 2016

The contract is the purchase of innovative technological line for the production of products and surface treatment of sheet materials. The contract is not divided into lots, because the subject matter is complex technological equipment for surface treatment and structured sheet materials hardening, with finalization to the desired dimensions, surface structures and shapes by spraying the finished product. The device must be automated due to austerity-consuming manual activities, energy saving and environmental protection. Part of the delivered object of the contract is transport and installation and training.

Detailed description of the delivery of the subject of the contract is set out in the tender documents.

Natural gas

Hlavné mesto SR Bratislava | Published November 11, 2016  -  Deadline December 15, 2016

The contract is the supply of natural gas to points of delivery of the Slovak capital Bratislava and the organizations in its scope, including transportation, distribution and services related to gas supply, taking responsibility for deviation, standard equivalent to the technical conditions of the distribution network in compliance with applicable provisions Slovakia, technical and operating rules of the distribution network.

Expected scope of our energy will be provided in section B.1 specifications designated as a description of the subject of the contract and in the statement annexed to the no. 1 specifications.

Conversion of primary school at OU Kostoliste

Obec Kostolište | Published November 25, 2016  -  Deadline December 22, 2016
The subject of the reconstruction of the existing unused buildings in the primary school at the municipal office. It mainly works by reducing the energy intensity of buildings such as .: insulation cladding contact insulation system, removal of old and new delivery Energ. effective plastic windows and external doors, ceiling and floor insulation and reconstruction of central heating. Furthermore, the reconstruction of the roof, takes a new roof and roof ceramic. covering rivers. soc. equipment - plumbing fixtures, water supply and sewerage, reconstruction of wiring buildings, outdoor ramp, etc.

Ensuring public lighting services

Obec Koškovce | Published December 7, 2016  -  Deadline January 19, 2017
The contract has as services consisting of security lighting throughout the village Koškovce. The contracting authority requires comprehensive service consisting in the lighting installation lighting system, ensure the required technical and operational levels of public lighting system, including the provision of all other services and energy necessary for the proper functioning of lighting. Tenderer to provide lighting services for the municipality Koškovce agreed for a regular monthly fee.

Industrial machinery

Distrib Capital, s.r.o. | Published November 29, 2016  -  Deadline January 16, 2017

The subject of the contract is a comprehensive technology for cooking and fermentation of malt wort drink and drink lying Cider including ingeenieringu. The present technology are mutually connected by containers and by mode of technology so as to be logically included in the system, corresponding to different phases of the production cycle of the two drinks in order to obtain maximum synergy with the labor and various forms of energy. A necessary and important parameter arrangement coherent technology is the perfect way of sanitation so as not so. blind spots of possible microbial infections, the occurrence of which have highly negative effects on product quality and economy brewery.

The subject of the contract is a comprehensive technology for cooking and fermentation of malt wort drink and drink lying Cider including ingeenieringu. The present technology are mutually connected by containers and by mode of technology so as to be logically included in the system, corresponding to different phases of the production cycle of the two drinks in order to obtain maximum synergy with the labor and various forms of energy. A necessary and important parameter arrangement coherent technology is the perfect way of sanitation so as not so. blind spots of possible microbial infections, the occurrence of which have highly negative effects on product quality and economy brewery.

The exact specification of the procurement of equipment and technical parameters are defined in Annex no. 1 specifications Description of the object of the contract.

Building and facilities management services

Bratislavský samosprávny kraj | Published December 3, 2016  -  Deadline December 18, 2016

The contract is the operation, maintenance and repairs of the property BOD, in particular:

- Operation of real estate and facilities.

- Preventive maintenance and servicing of equipment and property,

- Maintenance and repair,

- Special inspections and tests listed equipment, fire-technical equipment and maintenance of technical equipment,

- environmental Protection,

- Energy management and technical infrastructure,

- Proposes measures to streamline and modernize the property,

- Reporting.

Detailed definition of the object of the contract set out the specifications.