201303954 - Transformers for electric power (16,7 Hz).

Jernbaneverket | Published November 21, 2013
Winner
Møre Trafo ASNaustvegen 10, AurnesSykkylven 6230
cpvs
31170000

Framework agreement 1: Delivery of filter impedance. Framework agreement 2: Delivery of auxiliary power transformer and booster transformers.

Transformers

Haugaland Kraft AS | Published January 26, 2013  -  Deadline February 7, 2013
cpvs
31170000

:Construction,delivery and assembly of power transformer for Klovning Sub-station. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=279471

Transformers

Norwegian National Rail Administration | Published June 15, 2013  -  Deadline July 10, 2013
cpvs
31170000

The Norwegian National Rail Administration, henceforth referred to as NNRA shall enter into 3 framework agreements, one for each of the following transformers: — Auxiliary power transformer. — Booster transformer. — Filter impedance. The auxiliary power transformer shall be installed as backup system for power supply to NNRA's signal system where other secondary power supply is inaccessible. The booster transformer shall be installed in NNRA's overhead contact system with approx. 3 km internal intervals. This transformer shall ensure the return current to NNRA in the dedicated return current path, which may be track or separate parallel coupled conductors. The filter impedances shall filter return current away from signal current in the track and lead this to the dedicated return current path. In order to receive further information about this contest, including supplementary information and/or clarifications, the tenderers are asked to register for participation in the tender contest at the following net site: https://www.eu-supply.com/app/rfq/rwlentrance_s.asp?PID=108499&B=JERNBANEVERKET

Framework agreement for Power transformers for Kleppstad, Svolvær and Kvitfossen transformer stations

Lofotkraft AS | Published October 23, 2015
cpvs
31170000

Framework agreement for Power transformers for Kleppstad, Svolvær and Kvitfossen transformer stations

hydraulic turbines

SISO Energi AS | Published January 26, 2012  -  Deadline February 6, 2012
cpvs
31100000, 31120000, 42112200

:— 1 Pelton turbine, maximum operating flow 1,4 m3/s, gross head approximately 426 m, — 1 Synchronous generator, power approx. 5,5 MVA, — 1 Power transformer, transformation 6,6/22 kV, — High-voltage switch-gear, — 22 kV power cables, — Station supply in the power station, — Low voltage supply at the dam, — Control and protection system, — Cooling water and drainage equipment, — Lifting equipment, — Spare parts. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=248285.

Fagerbakken power station - electro mechanical delivery (5112635).

SISO Energi AS | Published January 26, 2012  -  Deadline February 6, 2012
cpvs
31100000, 31120000, 42112200

— 1 Pelton turbine, maximum operating flow 1,4 m3/s, gross head approximately 426 m, — 1 Synchronous generator, power approx. 5,5 MVA, — 1 Power transformer, transformation 6,6/22 kV, — High-voltage switch-gear, — 22 kV power cables, — Station supply in the power station, — Low voltage supply at the dam, — Control and protection system, — Cooling water and drainage equipment, — Lifting equipment, — Spare parts. Note: To register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=248285 .

201303954 - Transformers for electric power (16.7 Hz)

Jernbaneverket | Published June 12, 2013  -  Deadline July 10, 2013
cpvs
31170000

Rail shall be included wood frame agreements, one for each of these transformers: - Spare Power Transformer - Suction Transformer - Filterimpedanse Standby Power Transformer installed as a backup system for power supply to Railway Administration's signal system where some secondary power supply is unavailable. Vacuum Transformer installed in Norwegian National Rail Administration catenary with approx. 3 kilometers spaced. The transformer should be sure to keep returning power to the Rail in the dedicated return current path can be rails or parallelkoblede own leaders. Filterimpedanser to filter return flow away from the signal current in the rails and lead it to the dedicated return current path. To receive more information about this competition, including any amendments and / or clarifications, please register your interest in participating at the following website: https://www.eu-supply.com/app/rfq/rwlentrance_s.asp ? PID = 108499 & W = Rail CPV: 31170000.

Power transformers for Kleppstad, Svolvaer and White Waterfall transformer substations

Lofotkraft AS | Published October 20, 2015
Winner
ABB AS
cpvs
31170000

Due to its technical life expectancy and inadequate transmission capacity and redundancy, it is decided that the current 66 kV grid through Lofoten be upgraded to 132kV. Licence Application for voltage upgrades were sent Norges- Water Resources and Energy Directorate (NVE) in spring 2014. Applied for solution involves a ca. 101 km long overhead line with injected subsea cables and new substations in the White Waterfall and Svolvær in addition to upgrading Kleppstad substation (all these stations are located in Vågan municipality). Construction of the stations will continue for some years. Startup construction of the station in the White waterfall will start in autumn 2015, while we expect to begin construction of Svolvaer substation summer 2017. Upgrading Kleppstad substation will take place in two rounds, in the last half of 2016 and in early 2019. Lofotkraft want an agreement that includes delivery of 4 transformers for 3 stations, where a confirmed booking pr. Station will be approximately One year before the delivery date.

Power transformers to Kleppstad, Svolvaer and White Waterfall transformer substations

Lofotkraft AS | Published March 18, 2015  -  Deadline April 30, 2015
cpvs
31170000

Due achieved technical life expectancy and inadequate transmission capacity and redundancy, it is decided that the current 66 kV network through Lofoten be upgraded to 132kV. Licence Application for voltage upgrades were sent Norges- Water Resources and Energy Directorate (NVE) spring 2014. Applied for solution involves an approximately 101 km long overhead line with injected subsea cables and new substations in the White Waterfall and Svolvær in addition to upgrading Kleppstad substation (all these stations are located in Vågan municipality). Construction of the stations will continue over a few years. Startup construction of the station in the White waterfall will start in autumn 2015, while we expect to begin construction of Svolvaer substation summer 2017. Upgrading Kleppstad substation will happen in two stages, in the last six months in 2016 and early 2019. Lofotkraft want an agreement that includes delivery of 4 transformers for 3 stations, where a confirmed booking pr. station will be approximately 1 year before the delivery date.

Construction work

Statens vegvesen Region vest | Published May 4, 2017  -  Deadline August 21, 2017
cpvs
45000000, 45310000, 31000000, 32000000, 34990000, 45300000, 51000000

Project information: E39 Svegatjørn — Rådal:

The project E39 Svegatjørn–Rådal comprises the construction of a new main road between Os and Bergen. The development starts at Svegatjørn in Os and continues to Rådalen in Bergen.

The project E39 Svegatjørn — Rådal comprises 4 road tunnels. In addition to the tunnels, there are 6 open air zones: Svegatjørn, Endalausmarka, Rådal, Skeievatnet, Nordås and Sørås.

The project is divided into 2 execution contracts for tunnel work, K10 and K11. The electro contract, K20 Electro and CRM covers both of these contract areas. The tunnel contracts K10 and K11 started autumn 2015.

See the project's website for further information. http://www.vegvesen.no/Vegprosjekter/e39svegatjornradal

K20: Electro and CRM

The contract K20 Electro and CRM comprises all execution of electro-technical installations, control, regulation and monitoring for the entire project.

See the tender documentation, chapter A3-1 for further details.

Estimated main amounts for K20 Electro and CRM:

Length of road tunnels: 28 800 metres

Tunnel lighting: 28 800 metres

Emergency lighting: 1 150 pcs

Technical buildings in tunnels: 10

Technical buildings in open air zones: 5

Control cabinets: 375 pcs

Emergency stations: 200 pcs

Equipment for emergency kiosk: 60 pcs

Emergency telephones: 260 pcs

Traffic counting cabinets: 11 pcs

Jet fans: 106 pcs

Internally lit signs: 550 pcs

Lighting in the open air, street light masts: 400 pcs

Cameras: 416 pcs

Radar: 91 pcs

Barriers: 30 pcs

Fibre main network: 20 000 metres

Fibre sub-network: 79 700 metres

Radio leakage cable: 27 900 metres

Wind gauges: 9 pcs

Communication panels: 7 pcs

Only assembly (Delivered by K21 and K22):

Lane signals: 600 pcs

Fully graphical variable road signs: 100 pcs

Speed signs in tunnels: 100 pcs

Complete control, regulation and monitoring installations shall be assembled and programmed.

Interface:

— Main contracts K10 and K11: Deliver and assemble cable ladders, conduit routes, technical buildings, emergency kiosks in tunnels, masts for signs, sign portal, grounding, conduit manholes, traffic gantries on cable ladders.

— Contract K21: Variable road signs and lane signals will be delivered as a project owner delivery. Assembly and programming are included in K20.

— Contract K22: Speed signs will be delivered as a project owner delivery. Assembly and programming are included in K20.

— BKK: Will do all high voltage work and shall deliver all high voltage transformers. The interface is on the low voltage rails emergency power transformer.

Project 83298 IOP US - Infrastructure Electrical Engineering 3

Oslo Universitetssykehus HF | Published August 30, 2016  -  Deadline September 28, 2016
cpvs
45000000, 45310000

Project Background

On the basis of the report of the DSB, the deviation in building 03 at OUH Ullevål, it initiated measures to close these deviations by upgrading the electrical infrastructure until the medical group 2 areas (GR-2). The interface runs at supply and connection to existing gr.2 sub distributions on 1 level (5 pcs Medical Intensive Monitoring / MIO) and supply and connection to new gr.2 sub distributions on 2 levels (5 pieces Heart Intensive Monitoring / HIO and 5 pcs Heart postop & Step Down). The new gr.2 under distributions supplied, installed and commissioned by private electrical contractor and is NOT part of this description.

scope

The main task will be to deliver a complete electrical plant with emergency power supply up to the connection of 6 existing medical omkoblingsfordelinger (GR-2) located in the plane 01 ( "Medical Intensive Monitoring (MIO)") and affiliation of 10 new omkoblingsfordelinger (GR-2) located in plan 02 (5 pcs for "Cardiac Intensive Surveillance (HIO)" and 5 pieces for "Heart postop & Step Down (Thorax / Step Down")). Solutions also based on the use of UPS between distributions located in the current floor / area.

Elektroentreprenør get attracted rans ported construction site management and

progress control of UPS vendor, page entreprise (UPS, Battery Banks, Battery switch and power transformer (400 / 230V)) for implementation.

There will always be fully operational on existing elanlegg during construction.

  • 1