Public tenders for power-transformer in Hungary

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Power Transformer

Budapesti Elektromos Művek Nyrt. | Published August 29, 2014  -  Deadline September 29, 2014
cpvs
31174000

Hálózati transzformátor

DUNAÚJVÁROS substation 120/22/11 kV 25/16/16 MVA power transformer refurbishment

E.ON Észak-dunántúli Áramhálózati Zrt. | Published November 12, 2013
cpvs
50532200

Dunaújváros alállomás 120/22/11 kV 25/16/16 MVA teljesítménytranszformátor felújítása

Power supply transformers

E.ON Gazdasági Szolgáltató Kft. | Published June 4, 2016  -  Deadline July 13, 2016
cpvs

Power transformer

Power supply transformers

EDF DÉMÁSZ Hálózati Elosztó Kft. | Published January 16, 2016
cpvs
31174000

Power Transformer

Rose Street performing power transformer station villámkárból resulting from repair work and replacement of Roosevelt Square 5M5 outdoor disconnectors field of control cabinet

Szeged Megyei Jogú Város Önkormányzata | Published March 7, 2016
Winner
Siemens Zrt.
cpvs
45310000

"Making Rose Street station converters villámkárból resulting repairs and replacement of Roosevelt Square 5M5 outdoor disconnecting the control cabinet field"
Main quantities: the "Szeged, electric public transport" c. Based on the detailed protocols setting out to improve the damage caused by the project has been established within the framework of Rose Street current transformer caused the damage caused by lightning and Roosevelt Square 5M5 signal isolator cabinet rodents extent of the damage.
The detailed technical data included in the technical documentation and unpriced budget.

Contract of 120 kV / MV power transformers renewal.

E.ON Dél-dunántúli Áramhálózati Zrt. | Published April 4, 2014
cpvs
50532200

Vállalkozási szerződés 120 kV/középfeszültségű teljesítménytranszformátorok felújítására.

Information on the outcome of the procedure - the purchase of railway transformers matter

MÁV Magyar Államvasutak Zrt. | Published February 3, 2016
Winner
KONCAR Distributivni i specijalni transformatori d.d.;;
cpvs
31170000

Part 1: Traction Transformer
Single-phase power transformer oil insulation, under load control, traction transformer 126 / 2x27,5kV Quantity: 1 piece
Part 2: Auxiliary Transformer 25 / 50kV 0,231kV Quantity: 2 pieces
Part 3: Auxiliary Transformer 25 / 0,231kV 250kVA
Single-phase auxiliary oil-insulated transformers column, three-stage secondary-side voltage regulation 25 / 0,231kV 250kVA Quantity: 1 piece

Install Solar System The Buddhist Church Bell Street and the building of live webcam - amending the contract information

A Tan Kapuja Buddhista Egyház | Published February 18, 2015
Winner
KHK Építész és Mérnöki Iroda Kft.
cpvs
45310000, 09331200

Install Solar System The Buddhist Church Bell and Borzsony Street building. Installing flat roof installed polycrystalline solar modules, solar cables for connecting them, ágbiztosító and surge suppression device, a power transformer inverters, switching and protection Equipment (lightning protection, fire protection) systems consisting of two locations. Total installed capacity of 20.5 kWp solar panel positioning, connection hubs, together with associated ancillary works complete

Contract award notice - utilities: pre-qualification tender notice published negotiated procedure TED 2014 / S 067-115793 04.04.2014. "3 x 120 kV / medium voltage power transformer refurbishment 'acquisition proposal.

E.ON Dél-dunántúli Áramhálózati Zrt. | Published August 17, 2015
Winner
CG Electric Systems Hungary Zrt.;Stubán Generál Trafó Zrt.
cpvs
50532200

Tájékoztató az eljárás eredményéről - Egyes ágazatokban: előminősítési hirdetménnyel meghirdetett tárgyalásos eljárás TED 2014/S 067-115793 2014.04.04. "3 db 120 kV/középfeszültségű teljesítménytranszformátor felújítása" beszerzési tárgyban.

Design and installation of a new main distribution transformer village

Közigazgatási és Elektronikus Közszolgáltatások Központi Hivatala | Published April 27, 2015
Winner
ÉPÍT 2000 Bt.;HASKELA Kft. - Wernervill Kft. közös ajánlattevő
cpvs
45000000

Béla Balázs and Rona Street site due to the increased demand for power transformer design space, and installation of new main distribution as follows: Part 1 performance: "Architectural and structural transformation works" of the. Making Bela Balazs Street site architectural and structural transformation works; b. Specifying Rona Street site architectural and structural transformation works; Part 2 performance: "Main Distribution construction, conversion work" a. Balázs Béla street performing main distribution site construction, conversion work; b. Rona street performing main distribution site construction, conversion work; The unpriced budget and the detailed technical specifications included in the tender documentation.

Results of the procedure 'to transport 400 kV power transformers II delivery contract. "

MAVIR Magyar Villamosenergia-ipari Átviteli Rendszerirányító ZRt. | Published June 3, 2015
Winner
TRENCH Itali S.r.I.
cpvs
31173000

Tájékoztató az eljárás eredményéről "Szállítási szerződés 400 kV-os áramváltók szállítására II."

Delivery of 120 kV / medium voltage power transformers (120/22 kV - 25 MVA 120/22 kV and - 40 MVA transformers)

E.ON Gazdasági Szolgáltató Kft. | Published June 8, 2016  -  Deadline July 13, 2016
cpvs
31174000

Delivery of 120 kV / medium voltage power transformers (120/22 kV - 25 MVA 120/22 kV and - 40 MVA transformers)

The results of investigations conducted pursuant to a negotiated procedure without notice KM Information: Delivery of 120 kV / medium voltage power transformers

E.ON Gazdasági Szolgáltató Kft. | Published August 28, 2015
Winner
Kolektor Etra d.o.o.
cpvs
31174000

1 120/22 kV - 25 MVA - YNyn6 + d transformer

A contract to the EEOP 4.10.0 / C 12-2013-0180 identification number, "Solar power plant construction of small investment of Mórahalom Municipality" within the framework of the implementation of solar power plant construction project NAMES works concerned.

Mórahalom Városi Önkormányzat | Published August 12, 2015
Winner
POLAR-STÚDIÓ 2 KFT.
cpvs
45251100, 45340000, 71322000

The EEOP 4.10.0 / C 12-2013-0180 identification number, "Solar power plant construction of small investment of Mórahalom Municipality" The 499.5 kW solar power plant construction Technical parameters are as follows: will be placed in a separate cell measuring current and voltage transformers what the full mechanics of the metering and receiving a signal. Through these will continue to track the amount of power produced by the inverter, ADSL communication that the Internet is monitored. The gate pillars are made of concrete foundations. In addition to the video system WEB cameras are placed, which promotes local control. Technical requirements: Solar Power: -280 Wp nominal power from 0 - + 5 Wp power except -legalább 15% -60 dB nominal module efficiency cell size 156x156 mm assembly -10 year warranty and 25 year performance guarantee (80.2 % rate) Inverter: inverter -string -legalább 30,000 -háromfázisú VA output power, transformer-less design -Ethernet, USB and RS485 connectors -5 year manufacturer warranty Monitoring System: -inverter supplied by the manufacturer of the individual inverters Suitable for different MPP-trackereinek with specific monitoring station transformers: -betonházas, internal control plan -legalább 600 kVA transformer rated output of 22 kV oil-insulated transformers The contractor technical content required for the works and connection to the existing building permit according to implement a reservation. Other tasks Planning, building permit modification documentation:

1 tram in Budapest renovation and extension Kerepesi road and Iulia - No. 2 contractual agreement. Change

BKK Budapesti Közlekedési Központ Zártkörűen Működő Részvénytársaság | Published July 13, 2015
Winner
S Villamos Konzorcium
cpvs
45234126, 45233120, 45210000, 45231400, 45316200, 45316213, 45234113, 45221250, 45234128, 45234160, 71500000, 71540000, 77300000, 71320000

Budapest 1 for the renovation and extension of tram line between the road and Kerepesi road Iulia (TOP-5.5.0-09-2010-0025) within the framework of a contract. Additional signs and signaling, telecommunications, drainage, public works, road construction, traffic engineering renovation and / or construction work and perform additional engineering design tasks. Major work by gender and estimated quantities: - earthworks mirror preparation: 26400 m² - track construction: 4470 vm - bypass construction of 10 groups - crossings, construction of 7 group - stops Number: 15 - unique, full peronlefedés establishment: 2 pieces - partial, 18 mph peronlefedés Establishment: 12, - elevator Establishment: 2 - Establishment of a dynamic passenger information equipment: 4 - camera installation: 64, - current transformer stations partially updated: 3, - new power transformer station: 2 - 2 1x240 mm² Cu cross-establishing légtápvezeték: 3400 m, - construction of 1 x 240 mm² DC cable power back drive: 1200 m - 1 x 1000 mm² DC traction cable laying of 26 600 m, - for electric wire: 8100 m, - switch adjustment: 1 - points heating: 11 pieces - terminus signaling device: 1 - build a road surface: 30,200 m² - built pavement: 5700 m², - district heating pipeline replacement: 300 m - 11 kV Cable Replacement: 4,500 m, - 132 kV Cable Replacement: 1200 m, - different types of plumbing replacement of 220 m, - different types of channels to replace 2800 m, - various types of pipeline replacement: 810 m, - construction of noise barrier wall 1040 m, - sapling planting 260 pieces - shrub planting 14 500.

Construction work

MVK – Miskolc Városi Közlekedési Zrt. | Published November 26, 2015
Winner
Miskolci Zöld Nyíl 2009 konzorcium
cpvs
45000000, 45234121

"To a contract to develop the Miskolc urban tramways, within the framework of implemented EU-funded project, the extension of the reconstruction and the 1st line of existing infrastructure in urban tramways Upper Majláth station, as well as the associated entire infrastructure building, construction works according to FIDIC Yellow Book" supply and installation of power supply equipment related to the subject of contract. The description of History "Miskolc tram railway development" TOP 5.2.0-07-2008-0003 identification number of large projects in addition to the renovation of the track, line extension and reconstruction of infrastructure related to the purchase of 31 pieces performed by new modern electric vehicle, replacing with the ongoing SGP and Tatras KT8D5 types of power from the vehicle fleet. 01/31/2010 Miskolc was shipped off urban electric railway network optimization licensing and development concept plan. The construction contract is realized the power line network (underground cables and overhead line system) and this procurement process closely related to power and energy rationalization tasks (advanced power transformer stations, meter management system) will be implemented. The infrastructure required in the redevelopment of part of the energy supply network transformation rendszerűvé parallel beam system, and the related reconstruction of the AC system, which was built under the construction contract. The tramway energy supply system is powered by the power conversion equipment is built 10-30 years of care, which is currently used SGP and Tatra trams KT8D5 type of construction, in addition to power consumption parameters is currently regarded as temporary power supply system will satisfy traffic demands. The 15.2.2012. According to the contract concluded on the day of delivery vehicles procured vehicles, electricity demand in the current system has been unable to provide - much higher than the voltage drop due endpoints limits - and therefore the power system is imperative to rebuild. In accordance with the above, it is necessary to the operation of power conversion system to ensure the flow of electricity energy supply restructuring, review of existing equipment, redevelopment of the old regime. The original description of the situation in the east section of Arany Janos U.-i line, the line in the middle section of the U-Francis Jánosi of the western section of the U-fourth of the power converter. The three power stations adjacent to the converter can provide auxiliary power supply in case of a malfunction or maintenance through cooperative cable network. Based on the voltage measurement data of the farm complex and Diósgyőri stretch of trams peak time of high levels of voltage dips occur after the new trams into operation. John U. Golden-i converters: the old building, in the form of reconstruction of external necessity. Ferenc U. Jánosi-i converters: the new building, reconstruction is required. Fourth-i U. converters:

Information on Results of "The Beech Mountain and Borsod county electric mobility partnerships" issued under c. Project procurement procedure.

Bükk-Térségi LEADER Egyesület | Published July 15, 2015
Winner
ÖKOGÁZPROJEKT Magyarország Innovációs Korlátolt Felelősségű Társaság;Emobility Solutions Szolgáltató és Kereskedelmi Korlátolt Felelősségű Társaság;ÖKOGÁZPROJEKT Magyarország Innovációs Korlátolt Felelősségű Társaság
cpvs
09330000, 09331000, 09331200, 31681500, 31434000, 31711120, 09332000

The contract of sale / 1: 1 5.1 kWp installed capacity of small solar power plant on-site delivery and installation of "Leader BEV Main Station" creation, "The Beech Mountain and Borsod county electric mobility partnerships" c. within the framework of the project Part 2: 1 x 22 kW electric fast-charging column and 1 x 4.6 kW electric switch the charger post delivery and installation on-site, "Leader BEV Main Station" creation, "The Beech Mountain and Borsod county electric mobility partnerships" c . project. Part 3: 1 to 10 kWh of power needed to power vehicles BEV battery pack and 1 drive control power conversion equipment delivery "LEADER BEV Main Station" creation, "The Beech Mountain and Borsod county electric mobility partnerships" c. project. Grants for the implementation of the cooperation between the regions on the basis of 05) in accordance with article VM; ARDA applicant ID number: 1005574856; grant decisions iratazonosítója: 1648752005) framework based on a sales contract 1 "LEADER BEV Main Station" establishment of: 1 x 5.1 kWp installed capacity solar small power supply and site installation (part 1), 1 x 22 kW electric fast-charging column and 1 pcs of 4.6 kW electric switch the charger post delivery and on-site installation (part 2) and 1 of 10 kWh of power needed BEV vehicles to power battery pack and 1 drive control power conversion equipment delivery (Part 3), the technical specifications given technical content. Technical parameters: Part 1: 1 5.1 kWp installed capacity of small solar power plant - Solar system type is attached to a network. - Electric power: 5,1 kWp. - A support structure 20, each with a 255 Wp polycrystalline solar panel will be installed. - Inverter: Provider licensed rated output of 5 kWp inverters, capable of handling 2 set point. Part 2: 1 x 22 kW electric fast-charging column: - Electric power: 22 kW (32 A, 3-phase). Electric car battery charging 15-30 minute fast charge cycle. 1 x 4.6 kW electric-charging standard column: - Electric power: 4.6 kW (20 A, 1-phase). Electric car battery during charging up to 5 hours. Part 3: 1 to 10 kWh of power needed to power vehicles BEV battery pack - is needed to power vehicles BEV battery pack with a total size of 10 kWh. - The battery system voltage of 96 V in series 1 drive control power transformer plant - the supplied AC motor control for 72 V - 96 V systems fitted (2 minutes resulted in real effective (TRUE RMS) measurement). - The output current is at least 550 A.

Within the framework of EEOP 1.1.1 / 2F / 09-11-2013-0002 subject project "Hernad Valley Solid Waste Management System Development" road crossings and supply infrastructure construction tasks (under FIDIC Red Book)

Hernád Völgye és Térsége Szilárdhulladék-kezelési Önkormányzati Társulás | Published September 10, 2014
Winner
Podráczki - MISA Konzorcium;Podráczki - MISA Konzorcium
cpvs
45200000

Within the framework of a contract EEOP 1.1.1 / 2F / 09-11-2013-0002 subject project "Hernad Valley Solid Waste Management System Development" road crossings and infrastructure to perform implementation tasks (under FIDIC Red Book) Part I Infrastructure building - Monitoring wells - Water - Sewage - Precipitation - Gas - Electricity - leachate - Low Power - Public Lighting II.rész: - Road construction works pavement - Railway Gateway redevelopment: Within these: off-site works Road construction of the road asphalt , 2x1 lane, 0.5-0.5 m wide, double-sided curb. Right side 0.5 m deep, 50 cm wide 1 foot 1.5-inch trench rézsűhajlású land will be developed. The road crossing the 0 + 179.51 km section of Miskolc Hidasnémeti crosses the railway line, with prefabricated concrete elements gateway. The crossing is currently the site is located in a 6 m wide passage, necessary for this expansion. Be transferred to the existing equipment enabling a light as well. During the execution of the MAV professional supervision is required. A special building project, the amount available £ 18 million plus VAT. Water supply and construct the wall of the building shall be carried out up to a distance of one meter. Sanitation 1pc FLYGT or equivalent lifting pump installation by installing + 1 hot spare. Gas supply gas supply to the site next to the existing siding DN90 HDPE medium pressure occurs ~ 220 m long wire to wire to build up a coordinated TIGÁZ DSO Kft way of export planning. The electrical energy waste treatment plant ~ 100 kW power transformer needs to install with the system, as agreed with the service provider, preparation of construction plans. Jobs in the colony due to road construction, paving the expected high axle load on the pavement uniformly 15 cm gravel protective layer, 20 cm CKT cementstabilizációs roadbed, 25 cm basalt concrete. The control building (office) with 5 pieces perpendicular Vehicle design. parking will be built. The Waste - compression circuit also provides predictability 2.00 m wide asphalt pavement. Water supply in the complex land border ~ 1 m from a combination water meter water meter pit is established (both ports), the measurement of the small consumptions guarantee. Sanitation of the sump area generated Q = 2 m3 / d wastewater quantity accept, then pump takes over and pushing up the planned D110 HDPE pressure pipe 288 m length of the lot number ú 542 road becsatlakozásában existing tisztítóaknába storm water and leachate drainage Final recipient of Devecser stream , storm water pumping station in between. 1pc FLYGT or equivalent incorporate lifting pump installation + 1 hot spare. Gas supply to each building (office, color machine, reception) gas supply trench invested push tubes made of plastic, according to the construction plan. From the land of electricity supply cables to the individual consumer sites, according to the construction plan. Low Voltage Technical Content to determine the promoter is required to match. Street lighting is lighting in front of the property, which is necessary for carrying out job-winning designs manufactured to the contractor. Monitoring wells: 4 groundwater monitoring wells (8 m depth) the works do not include non-eligible costs within the framework of the project EEOP. Detailed technical information on the work is included in the documentation. Based on Government Regulation. 7 (4).
  • 1