Public tenders for power-generation in Germany

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Construction works for power plants and heating plants

Universitätsklinikum Aachen AöR | Published April 11, 2017
Winner
Vamed Health Project GmbH
cpvs
45251000

On the site of the UKA supply building is to be built a new energy center as a building block of the "energy master plan" west. Trigger for the planning of the construction project is dieTrennung the heat supply of the heating system of the RWTH Aachen and the advanced age of steam and cooling source. It should be installed cogeneration units as complete units ready for connection with air filled synchronous generator to the rotational power generation and the generation of heat in the form of hot water and steam. To complement the advertised performance, a twelve-month trial operation belongs to the construction phase.

Sleeving repair services

Deutsches Zentrum für Luft- und Raumfahrt e. V. (DLR) | Published February 24, 2017
Winner
Bilfinger Piping Technologies GmbH
cpvs
50514300, 50530000

1. The professional execution of maintenance and expansion work on pipeline technical equipment and the related technical installations, which fall within the responsibilities of the institutions and bodies of the DLR. The execution of the work on the current state of the art is obligatory.

2. The engineering, order planning, implementation, documentation and maintenance of complex, high thermal load test setups that the planned in the framework of cooperation agreements In-stitute for drive technology with its partners from the aerospace and power generation industries on the current state of science, manufactured and operate.

1. The professional execution of maintenance and expansion work on pipeline technical equipment and the related technical installations, which fall within the responsibilities of the institutions and bodies of the DLR. The execution of the work on the current state of the art is obligatory.

2. The engineering, order planning, implementation, documentation and maintenance of complex, high thermal load test setups that planned as part of cooperation agreements of the Institute of Propulsion Technology with its partners from the aerospace and power generation industries on the current state of science, manufactured and operated ,

Pipeline construction.

Deutsches Zentrum für Luft- und Raumfahrt e. V. (DLR) | Published February 24, 2016  -  Deadline March 29, 2016
cpvs
50514300, 50530000, 50500000

Subject of the framework agreement include:

1) The professional versions of maintenance and expansion work on pipeline technical equipment as well as the associated technical installations that fall within the responsibilities of the institutions and bodies of the DLR. The execution of the work on the current state of the art is obligatory.

2) Engineering will order planning, implementation, documentation and maintenance of complex, high thermal load test setups that planned as part of cooperation agreements of the Institute of Propulsion Technology with its partners from the aerospace and power generation industries on the current state of science, manufactured and operated.

This includes the following points:

- Development of technology for the use of materials under pressure and temperature, and processing methodology;

- Dimensions of piping and piping components regarding temperature and pressure loss;.

- Engineering for the purpose of life calculation and stability confirmation of piping and piping components in use of high frequency, dynamic processes with pressure surges;

- Planning and implementing of prefabrication work on site;

- Activities in the ongoing trial operation, ie assembly, disassembly and maintenance of existing and new plant components;

- Marketing of new and existing plants and plant components in cooperation with an approved monitoring center of the ZVT (eg TÜV.).

Electrical services

Bundesamt für Ausrüstung, Inforamtionstechnik und Nutzung der Bundeswehr (BAAINBw) | Published January 3, 2014
Winner
MTU Friedrichshafen GmbHMaybachplatz 1Friedrichshafen 88045 tobias.schiffmann@mtu-online.com +49 7541908775 www.mtu-online.com+49 754190908775
cpvs
71314100

Manufacture, supply and commissioning of a power generation unit (SEA) for the ship's equipment shore facility.

Research and development services and related consultancy services

Bundesministerium für Wirtschaft und Technologie (BMWi), Referat I C 4 | Published October 10, 2013
Winner
Prognos AGHenric Petri-Straße 9Basel 4010
cpvs
73000000

The transformation of the energy system comprises a wide range of power generation and energy efficiency of buildings through to electric mobility. In all these areas will require significant investment. The investment costs are compared to others future savings in energy consumption. Moreover, the transformation of the energy system opens up technological opportunities as a business location and exporting nation. A sound understanding of the costs and benefits of energy policy and the opportunities and risks, and announced in the first monitoring report of the federal government macroeconomic assessment of the effects of the energy revolution as an integral part of the upcoming, first progress report require a robust scientific analysis of the macroeconomic effects of the energy transition . The aim of the project is to identify the macroeconomic effects of energy policy in the years 2010 to 2013 (ex post analysis), to quantify and to be netted. In addition to an Outlook 2020 (ex ante analysis) are made. This introduction will provide an overview of approaches, key assumptions and results of the scientific work are given, which are already on the issue. By means of model calculations is finally the actual situation (with a pre-applied energy transition) with a counterfactual situation (reference scenario "without energy change") and compared to additional macroeconomic costs and benefits are designated to be allocated to the program of measures of the energy transition. While the existing methodological problems of separation policy developments driven by an autonomous development should be addressed.

HVAC packages

Kreisstadt Sigmaringen | Published March 30, 2017
cpvs
42512300, 44621220, 44162200, 44163121, 44161100, 31230000, 45111100

"Retrofitting Hohenzollern Gymnasium", Address: Hohenzollernstr. 20, 72488 Sigmaringen - Building Data: NRF approximately 8300 m 2 BRI approximately 34 000m 3 - Project: 3-brisk existing high school, built in 1975, renovation of the building envelope (without a roof), restructuring of the ground and first floor layout, structural complement of classrooms in the basement, adjustment fire protection requirements, exchange of ventilation and power generation equipment, modernization of electrical distribution, modernization the science education area.

The three-storey school building is accessible from the Hohenzollern street, the Gelaendeverlauf staggers away on a sloping hillside to the south and is accessed via a main entrance from the north. The heating system in the basement is ground floor directly accessible from the outside. Construction: reinforced concrete frame with ribbed floors, load-bearing parts and facade parapet majority as precast concrete.

Remediation measure of the existing heating system as an early measure: dismantling work consisting of: boiler system 1000 kW (2 pcs gas boiler, 1 piece CHP) and heating distribution, installation work of 2 piece gas condensing boilers (each about 400 kW) and a natural gas cogeneration (thermal performance 90 kW) and a heating distributor with seven rule sets, gas lines and exhaust lines, including a full-scale measurement / control technology.

IT services: consulting, software development, Internet and support

Süwag Grüne Energien & Wasser GmbH | Published January 18, 2017  -  Deadline February 14, 2017
cpvs
72000000, 72200000, 72210000, 72212100, 72212462, 72212519

The project Enervator must examine the objective, the integrated control and linking of electrical and thermal loads, electricity storage and local electricity and heat production in district power station "Am Main View" in Kelsterbach. Moreover, the economic potential will be evaluated by electricity procurement and marketing optimization of district power stations in the network.

For this, about 50 of the 180 households of the residential area be integrated based on intelligent predictions in the energy supply concept by active control. In the latest generation households digital electricity meters, including the communication unit Smart Meter Gateway (SMGW) be installed for data acquisition and control of loads. Moreover, these households are equipped with smart home system to allow the control of various devices.

The objective is the development, testing and application of the following new technologies:

- Use of smart metering and SMGW in households for the acquisition and processing of high-resolution data. Providing more flexible tariff plans for consumers based on the individual site power generation.

- Testing of automated and encrypted data evaluation SMGW by BSI (Bundesamt für Sicherheit in der Informationstechnik) guidelines.

- Testing of active consumer control of a smart home system in households.

- Development of a higher-level controller architecture, the consumption and production in the district power station coordinates co (heat and electricity).

- Integration of E-Mobility in the concept Quartier power plant, evaluation of a bidirectional charging infrastructure.

- Conceptual testing of automated digital billing methods.

Electric motors, generators and transformers

Land Berlin, vertreten durch das Landesamt für Flüchtlingsangelegenheiten (LAF) Berlin, vertreten durch die BIM Berliner Immobilienmanagement GmbH | Published March 7, 2017  -  Deadline March 21, 2017
cpvs
31100000, 31170000, 45300000, 45310000, 45311000, 45317000

Regarding the requirement of the construction contract documents, please note the details under point VI.3) Additional information.

The advertised services relating to trades of the cost group 440 (DIN 276), cover the rental of power generation plants with a 6 (10) kV transfer station and belonging low voltage power installations, the connection to the medium voltage network of the former Tempelhof Airport, including peripheral general electrical installation and fire protection measures on cable - and line systems.

Such invitations to tender are electrical installations in accordance with VOB / C, DIN 18382 "low and medium voltage installations with nominal voltages up to 36kV" and DIN 18384 "lightning protection systems", essentially:

Building precast concrete elements (rent 30 months), operational installation and with full maintenance,

7 000m 10kV cable (single conductor 240mm² and 120mm²)

* Fire protection measures to cable / conduit systems along the medium voltage street,

* Documenting the installed systems to the documentation standards of BIM.

For work performed in existing building parts, the access provisions of Tempelhof Projekt GmbH are to be observed, the business operations of construction works must - if avoidable - can continue undisturbed.

HVAC packages

Max-Planck-Gesellschaft, GV, Ref. VIII d – VOB | Published February 25, 2017  -  Deadline March 14, 2017
cpvs
42512300

This contract is the complete rehabilitation of power generation facilities of the Max Planck Institute in Göttingen at Fassberg during the completion of the contracting model with EON on the operation of the steam, heating and cooling systems.

In the future, the power plants are to be taken over again by the Max Planck Institute and operated independently.

The complete description is available as a system "II.2.4) Description of procurement" in the tender documents at no charge, https://portal.deutsche-evergabe.de/, fully operational and fully available.

situation

Of the respective centers of the supply of corresponding energy networks to the terminal on the estate buildings (research institutions, administration, kitchen, nursery, workshops, etc.) takes place.

Steam and heating supply (built in 1998/99)

Both boilers are fueled by natural gas.

To fulfill the requirements of the feed water quality, a water treatment plant (softening, demineralised water plant, metering) is installed in the heating system.

by means of

Another outlet on the steam distribution serves to heat the feedwater tank.

Pumps are used to return the condensate pumped from here to the feed water vessel.

Blow-down and blowdown from the steam boilers are cooled by a mixing cooler which is situated in the basement and into the municipal sewage.

For pressure maintenance in PWW power a pump-controlled system with a diaphragm expansion vessel (2 m3) is installed.

The CHP was renewed in, 2014.

To dissipate the fumes of the boilers and the cogeneration module is a concrete chimney with a height of about 55 m and an outer diameter at the base of 3 m available.

cold supply

All machines are equipped with Direktverflüssigern that are placed on the roof of the refrigeration plant.

The cold water side pressure is maintained via a compressor pressure maintenance.

Scope of the construction project

With the described construction project following key measures will be implemented:

- Replacement of the complete heat generation plant (WEP).

- Integration of the Stock-CHP in the new biomass plant.

- ...

Mobile power generators in combination with submersible pump

Markendorf Obst eG | Published January 18, 2017  -  Deadline February 9, 2017
cpvs
31120000

Wind-energy generators

Gelsenwasser AG | Published January 13, 2017
cpvs
31121300

This qualification system is the customer in the recurrent procurement of wind power generation facilities along the entire process chain (planning - Installation) serve.

Power generator with storage tank

Staatliches Bauamt München 1 | Published December 15, 2016  -  Deadline January 24, 2017
cpvs
45350000, 45315300, 45315300, 45311000

Control center Munich, Deroystraße

Regional Council and LPD Tübingen, modernize power generation, heating

Vermögen und Bau Baden-Württemberg Amt Tübingen | Published December 29, 2016  -  Deadline February 8, 2017
cpvs

Regional Council and LPD Tübingen, modernize power generation, heating

Hot water

Stadt Senden | Published March 25, 2017
Winner
SWU Energie GmbH
cpvs
09321000

Heat supply contracting for the supply of indoor and seaside resort with a connected load of 610 kW. The contractor has created a system built from base load and peak load boiler, CHP and a cabinet for MCR technology.

Further management of the old plant to utilize the now estimable remaining service life of 5 years. Operating revenue includes maintenance and repair, Chimney sweeps, Gas line testing, fault intrusion and resolution in the 24-hour service (within 2 hours after fault entry), including provision of the necessary spare parts.

In addition, changing the power generation due to changes in tax law framework and overhaul of CHP to ensure the operational safety during the remaining lifetime.

The previous comprehensive contracting power is reduced in the future on a lease and management of (the property of the contractor located) system. The electricity is switched from network supply to captive use. The fuel procured outsourcer future itself. In the price reduction, the interim amortization of the system is taken into account.

Construction work

Staatliches Bauamt München 1 | Published December 8, 2016
cpvs
45000000, 45200000, 45210000, 45300000, 45330000, 45331000, 45332000, 45332400, 45350000, 45351000, 45400000, 45420000, 45430000, 45440000, 45450000

Built in 1969 the service building of the "Supreme Building Authority in the Bavarian Ministry of Proposed measures:

The overall project includes the energy efficiency of the building envelope and the partial renovation and refurbishment of the electrical installation, the HVAC installations and the modernization of toilets. As part of the measure, existing fire protection deficiencies of EC are fixed to the 4th floor. As a result of construction of the buildings and the grounds incl. Underground seal to be completely replaced.

The action takes place in two phases. The section north building is finished.

During the construction of the main building rooms can still be used on the ground and must remain accessible.

Not aspects of the measure are high construction work in the area of ​​the 5th floor and in the basement.

- Site equipment,

- Protection measures

- Demolition and structural work,

- Scaffold

- Schadstoffsanierung,

- Metallbauarbeiten facade,

- Sunscreen,

- Roof sealing and plumbing works,

- Fiber concrete facade,

- Screed,

- Interior plaster,

- Trockenbauarbeiten walls / ceilings / fire / doors,

- Inner facades / interior RS-doors,

- Carpenter,

- Tiles,

- Painter,

- Anti-glare inside,

- Floor coverings,

- Natural stone works,

- Outdoor,

- Concrete repair,

- Baureinigung,

- High-voltage installation,

- Telecommunications,

- HKLS- installations (heating, air conditioning, ventilation, plumbing)

- Science of measuring and control engineering,

- Hazard detection and surveillance equipment,

- Power generation plants,

- Lightning protection systems.

Industrial control software package

Stadtwerke Rheinsberg GmbH | Published November 29, 2016  -  Deadline December 30, 2016
cpvs
48150000, 38800000

Stadtwerke Rheinberg GmbH is a power generation company that operates the district heating network in Rheinberg. Written out and awarded, the contract for the upgrade of the existing process control technology for the power plant and the district heating network in Rheinberg "Danfoss M2000 system". The contract includes the delivery of process control and a programmable logic controller solution. All technical systems must be fully installed, tested, calibrated and ready for use and operation. All necessary planning, supplies and services to be included in the offer to be created for this purpose. Technical details and a software and hardware service specifications contained in the tender documents.

The offered system is intended to replace the existing process control (Danfoss M2000) and programmable logic controller solution (Siemens S5). In addition to upgrading needs (actual value) of the differential pressure control and a corresponding pump control by means of frequency for remote heat pump (3 x 37 kW) offered a new transmission system of power bad point detection. Technical details and a software and hardware service specifications contained in the tender documents. The draft of a suitable service contract must be submitted to the indicative offer.

Procurement of 7 power generator units 15 kVA for emergency power supply of fire stations and lodging of the civil protection units in the Aachen region

StädteRegion Aachen | Published October 17, 2016  -  Deadline November 3, 2016
cpvs

Procurement of 7 power generator units 15 kVA for emergency power supply of fire stations and lodging of the civil protection units in the Aachen region

Design and delivery of power generators, lighting, portable ladders for fire service (2 lots)

Sachsen-Anhalt: ZVS Magdeburg | Published October 13, 2016  -  Deadline October 27, 2016
cpvs

Design and delivery of power generators, lighting, portable ladders for fire service (2 lots)

Cranes

SWM Services GmbH | Published October 8, 2016  -  Deadline November 3, 2016
cpvs
42414100

SWM operate various power generation facilities in the Munich area to max. 150 km from HW Theresienstraße. Here electricity, district heating coal, natural gas, residual waste and sewage sludge produced at various facilities.

Supply of various fire department technical equipment in three lots (Sandsackfüllmaschine, power generators and lighting equipment, fast-erecting tent)

Stadt Aachen - Zentrale Vergabestelle - | Published October 20, 2016  -  Deadline November 15, 2016
cpvs
31122000, 31518100, 39522530, 35000000, 31130000, 30237280