Public tenders for power-generation in Czech Republic

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Modernization CZT Koprivnica - Heat source of Koprivnica and combined heat and power generation Koprivnica (CHP Koprivnica)

TEPLO Kopřivnice s.r.o. | Published June 24, 2013  -  Deadline July 30, 2013
cpvs

This tender is partially implemented in the framework of the project "Modernization of CZT Koprivnica" whose main purpose is to modernize district heating in the city of Koprivnica in order to increase the energy efficiency of the entire system, reduce losses of heat and hot water supply, stabilize prices and reduce heat emission load region. Contract builds on related public order "Modernization CZT Koprivnica - Modernization of thermal networks of Koprivnica," which is the subject of modernization and reconstruction of existing heat distribution in Koprivnica. Contract includes the execution of works and provision of related supplies and services whose main purpose is to build a heat source and combined heat and power in Koprivnica. COMPLETE ITEM II.3) THIS NOTICE: Treaty on the service center, which will be subject to regular maintenance and service work on the two supplied cogeneration units will be closed along with a contract for performance of the contract . maintenance service agreement will become effective handover protocol CHP bidder with whom the conclusion of the contract for work on the performance of the contract, the contracting authority, on the basis of a contract for the performance of the contract will be concluded for a period of 10 years or mileage ............ ( Candidates will be added to the contract of service Service; candidates completed the number of hours between overhauls, at least 60,000 hours) hours each cogeneration unit, whichever is later. sponsor informs that in Article IV.3.4) this notice shall specify a deadline for receipt of of applications. CONTINUATION OF POINT III.2.3) THIS NOTICE: ii) three contracts covering the construction and / or reconstruction of the source with combined production of electricity and heat output of 1.5 MWe at least in one contract, with min. 2 of these contracts will be in min. capacity 40.000.000, - CZK without VAT / contract with the fact that part of the price may be the price for the related works and part of min. 2 of these orders had to be the installation of internal combustion engines to burn natural min of gas. defined output of 1.5 MWe under one contract; iii) two contracts covering the service of cogeneration units for power min. 1 MWe / contract for at least 2 years under one contract. b) a list of technicians or technical departments that will participate in the performance of the public contract, a list must be provided in the following composition: main construction manager, construction manager, the welding inspector. c) certificate of educational and professional qualifications of persons who will participate in the execution of the contract and will act as a the site manager, site manager and worker welding supervision. Such persons must meet the following minimum requirements that applicants must demonstrate evidence set out below: the site manager length of at least 6 years experience in the management of the building structures with reference to at least one construction, on which he served as of the site and whose price was at least 100,000,000, - CZK without VAT. candidate proves the affirmation of the site, eventually. persons authorized to act for or on behalf of candidates from which to derive the desired reality. Foremen The length of at least 4 years experience in the management of the building structures with reference to at least one construction, on which he worked as a construction manager whose price was at least 50.000.000, - CZK without VAT. candidate proves affidavit of the site, if necessary. persons authorized to act for or on behalf of candidates from which to derive the desired reality. Welding Co-ordinator length of at least 4 years experience in the welding supervisory candidate proves affidavit of the welding inspector, or. persons authorized to act for or on behalf of candidates from which the result

MVE slip Jirkov - reconstruction

Povodí Ohře, státní podnik | Published January 7, 2014
cpvs

The purpose of the reconstruction of the existing technological equipment in the machinery space MVE MVE slip Jirkov optimization hydropower potential water project for power generation - ie the optimal installation of machines and technological equipment with increased MVE technical parameters, reliability and lifetime of the device at the maximum use of existing building structures and machinery .

Mobile power generators (MZS) - 2015-2018

ČEZ Distribuce, a. s. | Published July 22, 2016
cpvs

The deliverable is providing services to the Client consisting of the provision of replacement power distribution network (hereinafter "DS") at a level LV (0.4 kV) power in the bands 100-160 kVA 161-250 kVA 251-400 kVA, 401-630 kVA by providing MZS. MZS each set must be equipped meter (meter) and kvalimetrem. MZS contractor provides the regime planned or operational mode to provide replacement power distribution network. The contractor is obliged to execute the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously at any one time to ensure each part of the public contract for which it concluded a framework agreement, the supply of electricity from MZS in power ranges from 100 to 160 kVA 161-250 kVA 251-400 kVA 401-630 kVA. The Contractor must, after completion MZS connected to the grid to ensure the preparation and submission of audit reports to Sponsor MZS before putting into operation.

Mobile power generators (MZS) - 2015-2018

ČEZ Distribuce, a. s. | Published February 17, 2016
cpvs

The Contractor must, after completion MZS connected to the grid to ensure the preparation and submission of audit reports to Sponsor MZS before putting into operation. The Contractor must, after completion MZS connected to the grid to ensure the preparation and submission of audit reports to Sponsor MZS before putting into operation.

Mobile power generators (MZS) - 2015-2018.

ČEZ Distribuce, a.s. | Published September 11, 2014  -  Deadline October 14, 2014
cpvs
50532400

The subject of the Contracting Authority is providing services consisting of the provision of replacement power distribution network (hereinafter referred to as "DS") on the surface of the LV (0.4 kV) power in the bands 100-160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401-630 kVA, by providing MZS. Each MZS must be equipped with a set meter (meter) and kvalimetrem. The supplier provides MZS mode planned or operational mode to provide replacement power distribution network. The Contractor shall perform the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously provide a time for each step of procurement, which will have concluded a framework agreement, the electricity supply from MZS in power ranges from 100 to 160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401 to 630 kVA. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. Further details are set out in the Qualification documentation published on the profile of the contracting authority - the address in Section 1: The contracting authority.

Mobile power generators (MZS) - 2015-2018

ČEZ Distribuce, a. s. | Published September 8, 2014  -  Deadline October 14, 2014
cpvs

Further details are set out in the Qualification documentation published on the profile of the contracting authority - the address in Section 1: The contracting authority. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. Date and place of opening of the tenders will be listed in the invitation to tender. The contracting authority reserves the right to negotiate offers in accordance with § 30 and 31 of that Act. 5 of the Law reserves the right to annul the tendering procedure.

Mobile power generators (MZS) - 2015-2018

ČEZ Distribuce, a. s. | Published May 27, 2014  -  Deadline July 7, 2014
cpvs

Subject to public contracts awarded in the form of negotiated procedure with publication according to § 22 paragraph 4 PPA, which is divided into five parts Procurement is the conclusion of the five framework agreements. The deliverable is the Sponsor to provide services consisting of the provision of replacement power distribution network (hereinafter referred to as "DS") at low voltage (0.4 kV) power in the bands 100-160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401-630 kVA, providing a MZS. Each MZS must be equipped set meter (meter) and kvalimetrem. The supplier provides MZS mode planned or operational mode of replacement power distribution network. The Contractor shall perform the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously provide a time for each step of procurement, which will have concluded a framework agreement on power supply MZS 1 to 160 kVA, 1 x 250 kVA, 1 to 400 kVA. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The object of the No. 1 public contracts awarded in the form of negotiated procedure with publication according to § 22 paragraph 4 PPA is a framework contract for the provision of services in the region Wednesday. Part of the No. 1 public contract for the region CENTER will be closed one framework agreement with one bidder. The deliverable is the Sponsor to provide services consisting of the provision of replacement power distribution network (hereinafter referred to as "DS") at low voltage (0.4 kV) power in the bands 100-160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401-630 kVA, providing a MZS. Each MZS must be equipped set meter (meter) and kvalimetrem. The supplier provides MZS mode planned or operational mode of replacement power distribution network. The Contractor shall perform the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously provide a time for each step of procurement, which will have concluded a framework agreement on power supply MZS 1 to 160 kVA, 1 x 250 kVA, 1 to 400 kVA. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The subject of the number 2 public contracts awarded in the form of negotiated procedure with publication according to § 22 paragraph 4 PPA is a framework contract for the provision of services in the East Region. The part number 2 tenders for region EAST will be concluded a framework agreement with one bidder. The deliverable is the Sponsor to provide services consisting of the provision of replacement power distribution network (hereinafter referred to as "DS") at low voltage (0.4 kV) power in the bands 100-160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401-630 kVA, providing a MZS. Each MZS must be equipped set meter (meter) and kvalimetrem. The supplier provides MZS mode planned or operational mode of replacement power distribution network. The Contractor shall perform the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously provide a time for each step of procurement, which will have concluded a framework agreement on power supply MZS 1 to 160 kVA, 1 x 250 kVA, 1 to 400 kVA. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The subject of the number 3 public contracts awarded in the form of negotiated procedure with publication according to § 22 paragraph 4 PPA is a framework contract for the provision of services in the region of Moravia. The part number 3 for tenders for the Moravia region will be concluded a framework agreement with one bidder. The deliverable is the Sponsor to provide services consisting of the provision of replacement power distribution network (hereinafter referred to as "DS") at low voltage (0.4 kV) power in the bands 100-160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401-630 kVA, providing a MZS. Each MZS must be equipped set meter (meter) and kvalimetrem. The supplier provides MZS mode planned or operational mode of replacement power distribution network. The Contractor shall perform the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously provide a time for each step of procurement, which will have concluded a framework agreement on power supply MZS 1 to 160 kVA, 1 x 250 kVA, 1 to 400 kVA. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation. The object of the No. 4 public contracts awarded in the form of negotiated procedure with publication according to § 22 paragraph 4 PPA is a framework contract for the provision of services in the region SEVER. The part number 4 for tenders for region North will be concluded a framework agreement with one bidder. The deliverable is to provide outsource services

Mobile power generators (MZS) - 2015-2018.

ČEZ Distribuce, a.s. | Published May 30, 2014  -  Deadline July 7, 2014
cpvs
50532400

Subject to public contracts awarded in the form of negotiated procedure with publication according to § 22 paragraph 4 PPA, which is divided into 5 sections Procurement is the conclusion of the five framework agreements. The deliverable is the Sponsor to provide services consisting of the provision of replacement power distribution network (hereinafter referred to as "DS") at low voltage (0.4 kV) power in the bands 100-160 kVA, 161 to 250 kVA, 251 to 400 kVA, 401-630 kVA, providing a MZS. Each MZS must be equipped set meter (meter) and kvalimetrem. The supplier provides MZS mode planned or operational mode of replacement power distribution network. The Contractor shall perform the deployment MZS continuously for 24 hours a day throughout the year. The supplier must be able to simultaneously provide a time for each step of procurement, which will have concluded a framework agreement on power supply MZS 1 to 160 kVA, 1 x 250 kVA, 1 to 400 kVA. The Contractor shall, after completion MZS connection to the distribution system to ensure the development and submission of audit reports Sponsor MZS before putting into operation.

Floods 2013 - Humanitarian aid - power generators, pumps

Ústecký kraj | Published July 31, 2013
cpvs

purchase of generators and pumps for disabled people by natural pohoromou - floods in June 2013

MVE VD Jirkov - reconstruction

Povodí Ohře, státní podnik | Published July 18, 2013
cpvs

The purpose of the reconstruction of the existing technological equipment MVE in the machinery space VD Jirkov is the optimization of hydropower potential dam for power generation - ie the optimum installation of machines and technological equipment to increase technical parameters MVE, reliability and durability of the maximum use of existing structures and machinery and restrictions demolition work. The building will be a place full sets of Banki turbine Delivery of a new generator with a vertical Francis turbine arranged in the impeller and fully controlled by the diaphragm. At the same time, an adjustment to the supply pipe to the MVE prior to sampling towers - treatment intake.

Special-purpose motor vehicles

Česká televize | Published May 3, 2017
cpvs
34144000

The subject of the public contract is the replacement of three existing satellite cars for CT Praha and TS Ostrava.

Each of the cars will be equipped with video and audio technology, in particular one camera chain, video matrix, audio overhead, compression and satellite technology for HD transmission and 3G SDI processing capabilities and customized power generation to the extent and according to specifications.

Special-purpose motor vehicles

Česká televize | Published May 26, 2017  -  Deadline July 11, 2017
cpvs
34144000

The subject of the public contract is the replacement of three existing satellite cars for CT Praha and TS Ostrava.

Each of the cars will be equipped with video and audio technology, in particular one camera chain, video matrix, audio overhead, compression and satellite technology for HD transmission and 3G SDI processing capabilities and customized power generation to the extent and according to specifications.

MVE-slip Jirkov reconstruction

Povodí Ohře, státní podnik | Published October 7, 2013
cpvs

The purpose of the reconstruction of the existing technological equipment in the machinery space MVE MVE slip Jirkov is to optimize the potential of hydropower dam for power generation - ie the optimum installation of machines and technological equipment to increase technical parameters MVE, reliability and durability of the maximum use of existing structures and machinery . The building is divided into the following construction and operational units: Construction objects SO 01 - Edit intake structure SO 02 - Adjustments engine MVE SO 03 - Operating Cable connection files PS 01 - PS Technology of machine building Inlet 01.1 01.2 PS engine room MVE PS 02 - Technological electrical part

Synthesis gas convector - Cleaning and treatment of raw pyrolysis gas.

Vysoká škola báňská – Technická univerzita Ostrava | Published March 5, 2014  -  Deadline April 30, 2014
cpvs
38000000, 51430000

Procured a supply of technological equipment for technical and chemical treatment and purification of the crude pyrolysis gas so that it can be used to produce electricity in subsequent energy unit. Currently operating pyrolysis unit produces so. raw pyrolysis gas containing particulate matter (PM), organosilicon compounds, tar aerosols and other additives (HCl, HF, H 2 S, NH 3), which can not be directly burned in a cogeneration unit for the purpose of energy recovery, for example. for power generation. Pyrolysis gas is under conditions of normal operation of the device is produced in a quantity of 80 m³ / h for the reference gas temperature conditions 0 ° C and a pressure of 101.325 kPa. Under certain specific conditions, however, the device can temporarily produce up to 200 m³ / h. The temperature of the raw pyrolysis gas before it enters into the treatment technology will be between 10-40 ° C, the gas pressure can be a maximum of 40 kPa.

Framework contract for expert services - calculations and analysis in the implementation of the National Plan for Smart Grid

PREdistribuce, a.s. | Published September 8, 2016
cpvs

The result of the tender procedure is a framework agreement (the "Framework Agreement") with one contender to the services of external support to the Client in the performance of its tasks under the National Action Plan for Smart Grid (hereinafter "NAP SG") for the development of network infrastructure ensure reliable and safe operation at the required development of distributed power generation, including the involvement of small heating plants, production management, accumulation and consumption, taking into account the requirement of increasing energy efficiency. NAP SG approved on March 4, 2015, the Czech Government and Sponsor, respectively. Association members as contracting entities operating in the electricity sector (operation of distribution systems, resp., in the case of CEPS transmission system operation), appointed the members of the Coordinating Committee for the implementation of the NAP SG and instructed them to meet the objectives of the NAP SG through the implementation of predefined measures. The outsourcing of public contracts under the framework agreement will be carried out the procedure according to § 92 paragraph. 1 point. a) the PPA, the contracting entity shall invite the suppliers in the form of an order to provide the performance and the successful tenderer confirms the order, with this confirmation will be closed partial (detailed) contract for the performance of a public contract. Submitters (PREdistribuce, E.ON Distribution, as, ČEPS and ČEZ Distribution, Inc.), have concluded an agreement on association of advertisers (hereinafter referred to as the "principal"), the company PREdistribuce, as were other contracting authorities empowered to publication of the notice to CEI.

Cooling and ventilation equipment

Baník Ratíškovice s.r.o. | Published November 4, 2015
Winner
Cergomont s.r.o.
cpvs
42500000, 45331000, 45300000, 45000000

The subject of performance addresses the optimization of energy management through the implementation of a central heat source for the entire sports complex using CHP technology (combined heat and power generation). Heat distribution from the new CZT will be implemented through existing hot lines to heat buildings in the area, and the adjacent swimming pool (plot no 1998/3), hostels (p.č. 1998/2) and football locker rooms (p.č. 1995 ) and using new hot routes for the new object active center (plot no 1992/1 and 1999/1) Restaurant Sport (plot no 1992/1). The proposed hot line is designed two-pipe system of pre-insulated pipes. Optimizing energy management involves minor alterations associated with the placement of new technologies, installation of cogeneration units and condensing boilers, installation of storage containers for heating water and installation of instrumentation. On the roof of the boiler house will be installed a new lightning rod. The proposed modernization of technological equipment of boiler plants will help increase efficiency in the production and supply of thermal energy and creates conditions for efficient building heating and DHW.

OPTIMIZATION OF ENERGY SECTOR PREMISES BANÍK RATÍŠKOVICE

Baník Ratíškovice s.r.o. | Published October 30, 2015
cpvs

The subject of performance addresses the optimization of energy management through the implementation of a central heat source for the entire sports complex using CHP technology (combined heat and power generation). Heat distribution from the new CZT will be implemented through existing hot lines to heat buildings in the area, and the adjacent swimming pool (plot no 1998/3), hostels (p.č. 1998/2) and football locker rooms (p.č. 1995 ) and using new hot routes for the new object active center (plot no 1992/1 and 1999/1) Restaurant Sport (plot no 1992/1). The proposed hot line is designed two-pipe system of pre-insulated pipes. Optimizing energy management involves minor alterations associated with the placement of new technologies, installation of cogeneration units and condensing boilers, installation of storage containers for heating water and installation of instrumentation. On the roof of the boiler house will be installed a new lightning rod. The proposed modernization of technological equipment of boiler plants will help increase efficiency in the production and supply of thermal energy and creates conditions for efficient building heating and DHW.

Cooling and ventilation equipment

Baník Ratíškovice s.r.o. | Published August 8, 2015  -  Deadline September 23, 2015
cpvs
42500000, 45331000, 45300000, 45000000

The subject of performance addresses the optimization of energy management through the implementation of a central heat source for the entire sports complex using CHP technology (combined heat and power generation). Heat distribution from the new CZT will be implemented through existing hot lines to heat buildings in the area, and the adjacent swimming pool (plot no 1998/3), hostels (p.č. 1998/2) and football locker rooms (p.č. 1995 ) and using new hot routes for the new object active center (plot no 1992/1 and 1999/1) Restaurant Sport (plot no 1992/1). The proposed hot line is designed two-pipe system of pre-insulated pipes. Optimizing energy management involves minor alterations associated with the placement of new technologies, installation of cogeneration units and condensing boilers, installation of storage tanks for heating water and installation of instrumentation. On the roof of the boiler house will be installed a new lightning rod. The proposed modernization of technological equipment of boiler plants will help increase efficiency in the production and supply of thermal energy and creates conditions for efficient building heating and DHW.

OPTIMIZATION OF ENERGY SECTOR PREMISES BANÍK RATÍŠKOVICE

Baník Ratíškovice s.r.o. | Published August 5, 2015
cpvs

The subject of performance addresses the optimization of energy management through the implementation of a central heat source for the entire sports complex using CHP technology (combined heat and power generation). Heat distribution from the new CZT will be implemented through existing hot lines to heat buildings in the area, and the adjacent swimming pool (plot no 1998/3), hostels (p.č. 1998/2) and football locker rooms (p.č. 1995 ) and using new hot routes for the new object active center (plot no 1992/1 and 1999/1) Restaurant Sport (plot no 1992/1). The proposed hot line is designed two-pipe system of pre-insulated pipes. Optimizing energy management involves minor alterations associated with the placement of new technologies, installation of cogeneration units and condensing boilers, installation of storage tanks for heating water and installation of instrumentation. On the roof of the boiler house will be installed a new lightning rod. The proposed modernization of technological equipment of boiler plants will help increase efficiency in the production and supply of thermal energy and creates conditions for efficient building heating and DHW.

POTENTIAL 2 - Delivery system for complex operational diagnostics of electric drives

ÚJV Řež, a. s. | Published September 30, 2013
cpvs
38300000

Equipment for diagnostics of drives is designed for research and development of new advanced methods for monitoring the behavior of electrical drives and their components, both in the laboratory and in real-life conditions in nuclear power plants. The reason for the public contract is an extension of the technological capacity Integrity Division and technical engineering NRI in order to create the appropriate background that will enable the implementation of research projects to solve problems lifetime structural materials components of nuclear power plants. The equipment is necessary for further R & D activities in the field of diagnostics safety related electrical drives for new nuclear power generation. Based on the results and experience will be further progress in the research and development of new diagnostic technologies, electric drives, as well as design manufacturers and operators of electric drives improvements in their design, such as with regard to increasing their reliability and prolonging their life. Date of performance is set for May 30, 2014. The Contractor shall ensure performance under contracts, in accordance with the terms of the tender dossier, in accordance with the project documentation for the construction project and public building construction contract. Fulfilling this objective will be measured by monitoring indicators.
  • 1