Call +44 800 9755 164

Public tenders for energy in Warsaw Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity, heating, solar and nuclear energy

„Koleje Mazowieckie-KM” Sp. z o.o. | Published December 28, 2016  -  Deadline February 2, 2017

The contract is for the supply of electric traction energy and service distribution of electric traction energy in the context of a comprehensive agreement for the needs of business transport electric traction by the Company "Railways Mazowieckie-KM" Sp. z oo

A detailed description of the contract is the contract documents (Terms of Reference).

Electricity, heating, solar and nuclear energy

Warszawski Uniwersytet Medyczny | Published December 17, 2016  -  Deadline January 26, 2017

1. The purpose of this contract is the distribution and supply of heat energy (comprehensive contract) to the object Medical University of Warsaw at ul. Marszałkowska 24, powered substations localized in nw. buildings:

a) the registration number of the building 1 of 7 within 5-05-11 ul. Marszałkowska 24/26,

b) registration number of the building 2 of 2 within 5-05-11 ul. Marszałkowska 24/26,

within 48 months from the date of the agreement.

2. A detailed description of the contract was included in Annex 2 to the Terms of Reference - Description of the order.

A detailed description of the contract was included in Annex 2 to the Terms of Reference - Description of the order.

Warsaw: Production and broadcasting a documentary on climate and energy.

 | Published July 12, 2016  -  Deadline January 31, 2018
The contract is for the production and broadcast of a documentary on climate and energy. The task of the Contractor shall: 1) develop detailed scenarios of ten short films and one feature film (including appointed as movies); 2) production of ten short films; 3) the production of a feature film; 4) issuance of all short films. A detailed description of the contract is contained in the Regulations tender zamiesczonym on the website of the Employer (www.wwf.pl) ..

Warsaw: supply and transmission / distribution of thermal energy to the building of School No. 36 to them. M. Kasprzak ul. Kasprzaka 19/21 01-211 Warszawa

Zespół Szkół nr 36 im. M. Kasprzaka | Published December 29, 2016
Supply and transmission / distribution of thermal energy to the building of School No. 36 to them. M. Kasprzak ul. Kasprzaka 19/21 01-211 Warszawa.

Electricity, heating, solar and nuclear energy

Warszawski Uniwersytet Medyczny | Published December 15, 2016  -  Deadline January 24, 2017

1. The present contract is the ongoing maintenance of the efficiency of installations in the Employer under the conditions specified in Annex 2 to the Terms of Reference - Description of the order, by:

1) maintaining the current Conservation;

2) provision of ambulance services and technical knowledge;

3) provision of repair.

- The extent and on terms specified in the formula of the Agreement.

A detailed description of the contract has been defined in Appendix 2 hereto.

Electricity, heating, solar and nuclear energy

Warszawski Uniwersytet Medyczny | Published December 17, 2016  -  Deadline January 24, 2017

1. The present contract is the ongoing maintenance of the efficiency of installations in the Employer under the conditions specified in Annex 2 to the Terms of Reference - Description of the order, by:

1) maintaining the current Conservation;

2) provision of ambulance services and technical knowledge;

3) provision of repair.

- The extent and on terms specified in the formula of the Agreement.

Electricity, heating, solar and nuclear energy

Centrum Obsługi Administracji Rządowej | Published January 12, 2017
Supply of electricity for 93 units of public administration for a period of two years (November 2017 to November-2019).

Petroleum products, fuel, electricity and other sources of energy

Narodowy Bank Polski | Published January 7, 2017

Central cashless purchases at petrol stations: liquid fuels, non-fuel products and services, washing and vacuuming in the years 2018 - 2020 for company cars operated in the Head Office and District Branches of the NBP.

Warsaw: Purchase of electricity

Uniwersyteckie Centrum Zdrowia Kobiety i Noworodka Warszawskiego Uniwersytetu Medycznego Sp. z o.o. | Published July 21, 2016  -  Deadline August 31, 2018
The contract is for purchase of electricity under the provisions of the Act of 10 April 1997. Energy Law. The estimated electricity demand for the object included in the Detailed Description of the Contract in the period from 01.09.2016 r. To 31.08.2018 r. Is 610 MWh. Employer informs that the switching process takes place once again. The current energy supplier ENEA SA.

Electricity distribution

„Koleje Mazowieckie-KM” Sp. z o.o. | Published December 30, 2016  -  Deadline February 7, 2017

The contract is for the supply of electric traction energy and service distribution of electric traction energy in the context of a comprehensive agreement for the needs of business transport electric traction by the Company "Railways Mazowieckie-KM" Sp. z oo

A detailed description of the contract is the contract documents (Terms of Reference).

Warsaw: SUPPLY OF ELECTRICITY FOR CENTRAL CENTRE geodetic and cartographic documentation

Centralny Ośrodek Dokumentacji Geodezyjnej i Kartograficznej | Published July 20, 2016  -  Deadline December 31, 2017
1.Przedmiotem contract is the supply of electricity for the needs of Central Documentation Centre of Geodesy and Cartography of 2 buildings located in Warsaw at ul. John Albert 94 B, and in Lesznowola Street. Polish Army 81, under the conditions described in this Terms of Reference hereinafter referred to as the Terms of Reference. The supply must be in accordance with the provisions of the Act of 10 April 1997. Energy Law (Dz. U. of 2012. Item. 1059, as amended.) And the regulations to the Act. 2. In order to describe the object of contract, the Contracting Authority approved that: 1) Estimated total energy consumption during the delivery period is 1790000 kWh 2) The total contracted capacity for abstraction points is 352 kW. 3.Szczegółowe information on the consumption points is described in Annex 1 to the ToR ..

Radar sets

Polska Agencja Żeglugi Powietrznej | Published December 28, 2016  -  Deadline January 25, 2017

The contract is for the construction and commissioning of four Centres of radar MSSR Mode S according to Decisions Governors to authorize the implementation of investments in the airports for public use. Object of the contract includes for each of the four locations (OR), in particular: 1.Dostarczenie, install and run: MSSR Mode S radar, teletransmission equipment, energy, air-conditioning, security / monitoring facility. 2.Dostarczenie including Radar container, a container of energy, container generator.

3.Na under the Decision of the Governor containing a construction project - implementation of the project executive, construction (including concrete tower [35 m] with a dome, access roads, the line SN). 4.Carry training for employees of the Employer in the construction, maintenance, operation and maintenance and configuration of the installed equipment - in particular radar MSSR Mode S

Radar sets

Polska Agencja Żeglugi Powietrznej | Published January 20, 2017  -  Deadline February 2, 2017

The contract is for the construction and commissioning of 4 Centres radar MSSR Mode S according to Decisions Governors to authorize the implementation of investments in the airports for public use. Object of the contract includes for each of the four locations (OR), in particular: 1. Delivery, installation and commissioning: MSSR Mode S radar, teletransmission equipment, energy, air-conditioning, security / monitoring facility. 2. Providing including Radar container, a container of energy, container generator.

3. On the basis of the Decision of the Governor containing a construction project - implementation of the project executive, construction (including concrete tower [35 m] with a dome, access roads, the line SN). 4. Conduct training for employees of the Employer in the construction, maintenance, operation and maintenance and configuration of the installed equipment - in particular radar MSSR Mode S

Construction work

Ministerstwo Kultury i Dziedzictwa Narodowego – Centrum Edukacji Artystycznej | Published January 19, 2017  -  Deadline February 27, 2017
Documentation consists of files in the folder to which access has been indicated in the announcement on the website of the Employer dedicated przedmiotowemu proceedings. 

Documentation consists of files in the folder to which access has been indicated in the announcement on the website of the Employer dedicated przedmiotowemu proceedings.

In particular, the contractor is obliged to perform the following works:

a) Thermal insulation of external walls,

b) proofing and thermal insulation of the foundation walls,

c) thermal insulation and damp floors on the ground floor of the reproduction layer,

d) Thermal insulation of the roof,

e) Replacement of windows and doors while maintaining historical distribution

f) Replacement of heating system with the source (gas heat pump)

g) Replacement of electrical wiring and lighting

h) Installation of air conditioning in the concert hall,

i) Modernization of natural ventilation

j) Strengthening the roof structure under a gas heat pump,

k) Installation of PV,

l) Implementation of bricklaying, plastering and painting.

The Employer recommends making by the Contractor (at its own expense, within the time limits agreed with the director of the institution) local vision.

The proceedings is an element implemented by the Contracting Authority - Ministry of Culture and National Heritage - Artistic Education Centre in Warsaw project entitled. "Comprehensive modernization of Energy selected state institutions of artistic education in Poland" co-financed by the EU in the framework of IE OP 2014-2020, Priority I - Reducing the emission of the economy, Measure 4.3 - Support for energy efficiency, intelligent power management and the use of renewable energy sources in public infrastructure, including in public buildings and in the housing sector.

Construction works for power plants and heating plants

PGNiG Termika SA | Published November 29, 2016  -  Deadline February 27, 2017

The subject of this contract is the construction of peak boiler in EC Zeran, the implementation of the EPC formula ( "turnkey") gas water boiler with a capacity of approximately 390 MW and its links to the existing infrastructure or converted Żerań. The boiler plant will consist of three water boilers located in the new building housing the light. Boiler room for established the following parameters:

a) Thermal power - about 390 MWt (3 x 130 MW)

b) Fuel - natural gas,

c) Type of work - pumped-reserve,

d) Cooperation - water system network in the EC Zeran, working with regions of the district heating network Veolia Energy Warszawa SA.

Purchaser in accordance with Article. 29 paragraph. 3a of the Public Procurement Law requires the employment of the Contractor under the contract of employment of persons engaged in supervision of the executive over the implementation of the contract.

Warsaw: Development of design documentation and tender in the framework of the investment task. Adaptation of the main building at ul. Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision.

Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy Miasta | Published July 15, 2016  -  Deadline December 15, 2017
Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision. a) Characteristics of the facility. It is made in the traditional technology of masonry walls, a flat roof is not ventilated. Change of use will expand operations CWR Family Warsaw on new actions on behalf of children and their families. It is located in the urban New Town entered in the register of monuments under the number A-1196. b) The characteristic technical parameters of the existing building: 1) Built-up area of ​​the building - 181.93 m 2; 2) The floor area of ​​the building - 516 m2. c) Description of the material scope of works: 1) stabilization of foundations, assessment and repair of structural elements, protection of the escarpment; 2) Execution of thermo - the exterior walls, roof, replacement of windows and doors; 3) Reconstruction of the building (pom. Administrative - office, pom. Studio, rooms for social workers, utility room in the basement), etc .; 4) Interior design, compilation of a first equipment; 5) Reconstruction and installation of sanitary (which, water. - Can., Mechanical ventilation, air conditioning, fire protection.); 6) Reconstruction and electrical installations; 7) Execution of telecommunication installations (CCTV, LAN, SSWiN, intercom systems, fire.); Old, making new external stairs and sidewalks, green. The scope of the contract includes in particular: 1) the execution of all necessary starting materials for the design, including: a) updated maps for design purposes, b) execution of an inventory of the existing facility, together with an assessment of the technical condition with particular emphasis on the design and an indication of the elements necessary to replace or reconstruction in terms of: - architectural and construction elements design - 3 copies. - plumbing - 3 copies. - electrical and telecommunication installations - 3 copies. - land management with inventory greenery - 3 copies. c) to document the geotechnical and research geological terrain entire investment - 3 copies. d) development expertise the design - 3 copies. 2) Implementation of the project of building a multi-branch with all the necessary arrangements in 6 copies., comprising: a) land development plan includes, among others, design of green economy and green existing sidewalks, exterior stairs, b) architectural and building thermo-modernization and reconstruction of containing the energy performance of the building together with the certificate of energy performance for the building and geological documentation, c) installation projects - sanitary, electrical, telecommunication, d) information on BIOZ, e) developing expertise fire. agreed with the appropriate Commander PSP. 3) Execution of projects implementing works - in 6 copies. A) architecture with a scenario of fire, b) Architecture - Interior together with the statement and equipment c) architecture interior design with a book room, d) design, including design protection embankment and building before settling.

Epoxy resin

Instytut Elektrotechniki | Published January 14, 2017  -  Deadline February 17, 2017

Supply of epoxy composition for the production of electrical insulation (tubes and glass-epoxy insulators and other insulating fittings) for energy and electrical industries, the use of fiberglass in the form of roving and other fillers, for example. Silica flour.

Composition - epoxy resin and hardener anhydride.

The glass transition temperature Tg> 130 degrees C. The gel time: in temp.120 degrees C 18-35 min. Quantity: 80.000 kg.

Composition - epoxy resin and hardener anhydride.

The glass transition temperature Tg> 110 degrees C. The gel time: in temp.150 degrees C approx. 35 min. Quantity: 10.000 kg.

Composition - epoxy resin and hardener anhydride (class H).

The glass transition temperature Tg> 130 degrees C. The gel time: in temp.140 degrees C approx. 25 min. Quantity: 1.000 kg.

Composition - epoxy resin and hardener anhydride.

The glass transition temperature Tg> 105 degrees C. The gel time: in temp.120 degrees C approx. 42 min. Quantity: 1.000 kg.

Composition - epoxy resin + amine curing.

Gelling time: at. 25 ° C approx. 35 min. Quantity: 5.000 kg.

Composition - epoxy resin + amine curing.

The glass transition temperature Tg of> 100 degrees C. The gel time: at. 80 ° C for 1.5 hours. Quantity: 3.000 kg.

Composition - cycloaliphatic epoxy resin and hardener anhydride.

The glass transition temperature Tg> 95 ° C Gelling time: at. 120 ° C approx. 15 min. Quantity: 5.000 kg.

Composition - epoxy resin and hardener latent.

The glass transition temperature Tg of> 100 degrees C. Storage below 20 degrees C over a period of six months with no evidence of gelling. Quantity: 2.000 kg.

  • 1