Public tenders for energy in Warsaw Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Electricity, heating, solar and nuclear energy

PKP Intercity S.A. | Published February 3, 2017  -  Deadline March 3, 2017
cpvs
09300000

1. The contract is for the purchase of electricity in the indicated locations. Object of the contract has been divided into four distinct parts (tasks).

a) Part 1 -Purchase energy comprising the area of ​​the Head Office and the Department of the Central

b) Part 2 -Purchase energy comprising the area of ​​the Department of the North

c) Part 3 - energy purchase comprising the area of ​​the Department of the West

d) Lot 4 -Purchase energy comprising the area of ​​the Department of the South

2. Description of the order is specified in Chapter V of the SETC.

The contract for lot 1 is the purchase of electricity to the area headquarters and the Central Department. Estimated demand of electricity in the period of 24 months is 28 763 909.39 kWh.

Purchase of electricity to the North Plant. Estimated demand of electricity in the period of 24 months is 12 887 859.27 kWh.

The contract is for the purchase of energy for the Department of the West. Estimated demand of electricity in the period of 24 months is 3 403 472.90 kWh.

Purchase of electricity to the Southern Department. Estimated demand of electricity in the period of 24 months is 8 870 979.40 kWh.

Electricity, heating, solar and nuclear energy

Uniwersytet Warszawski | Published February 24, 2017  -  Deadline April 4, 2017
cpvs
09300000

The present contract is the purchase of electricity in accordance with the provisions of the Act of 10.4.1997 Energy Law (hereinafter: PE) by the Employer to the point of consumption.

This contract does not include the electricity distribution services. A detailed description of the contract containing the location and description of the point of delivery of electricity, is contained in Appendix 1 hereto which is an integral part hereof.

Employer requires the Contractor to have concluded and binding contract, ie. The so-called. General Distribution Agreement with Local Distribution System Operator (hereinafter referred to as OSD), on the basis of which may engage in the sale of electricity through the distribution network of the OSD to the Purchaser all of the objects listed in Annex 1 to the Terms of Reference.

The Contracting Authority reserves the obligation not personal performance by the Contractor of the contract.

Warsaw: Production and broadcasting a documentary on climate and energy.

 | Published July 12, 2016  -  Deadline January 31, 2018
cpvs
92111250, 92220000

The contract is for the production and broadcast of a documentary on climate and energy. The task of the Contractor shall: 1) develop detailed scenarios of ten short films and one feature film (including appointed as movies); 2) production of ten short films; 3) the production of a feature film; 4) issuance of all short films. A detailed description of the contract is contained in the Regulations tender zamiesczonym on the website of the Employer (www.wwf.pl) ..

Electricity, heating, solar and nuclear energy

Biuro Ochrony Rządu | Published February 8, 2017  -  Deadline March 14, 2017
cpvs
09300000

Supply of electricity to buildings Government Protection Bureau in m. Warszawa, Raducz and Gdańsk.

Electricity, heating, solar and nuclear energy

Uniwersytet Warszawski, Interdyscyplinarne Centrum Modelowania Matematycznego i Komputerowego | Published February 17, 2017  -  Deadline March 29, 2017
cpvs
09300000

Supply of electricity.

The contract is for the supply of electricity for the following points to join the University of Warsaw:

CB No. 12187 Street. Pawińskiego 5a, Warsaw.

CB ul. Guild 32, Warsaw.

Supply of electricity.

The contract is for the supply of electricity for the following points to join the University of Warsaw:

CB No. 12187 Street. Pawińskiego 5a, Warsaw;

CB ul. Guild 32, Warsaw.

The value of Z [MWh] = 30 000 MWh is the estimated amount given in order to determine the value of the order, which does not reflect the real or the declared use of electricity during the contract and in any event can not be the basis for any claims by the Contractor. The Contracting Authority reserves the right to reduce the amount of ordered electricity. The Contracting Authority reserves the right to change the size of the supply of electricity - with the proviso that the total size of the order will not be greater than Z [MWh].

Employer allows changing the points of connection in the course of the contract.

Electricity, heating, solar and nuclear energy

Agencja Mienia Wojskowego | Published February 17, 2017  -  Deadline March 3, 2017
cpvs
09300000

The contract is for the supply of electricity includes sale of electricity to the real estate held by the Military Property Agency.

Desktop computer

Szpital Bielański im. ks. J. Popiełuszki Samodzielny Publiczny Zakład Opieki Zdrowotnej | Published February 7, 2017  -  Deadline March 15, 2017
cpvs
30213300, 30231300, 48700000

Order was divided into two packages: 

1.1. Package 1: Desktop;

1.2. Package 2: software to support IT management

Employer allows partial bids for any number of packages.

The terms of reference contained in Appendix No. 3 hereto.

The contract is funded under the Regional Operational Programme of the Mazowieckie Province for the years 2014-2020, Priority Axis II increase the potential of e-Mazovia, Measure 2.1 E-services, sub-measure 2.1.1 E-services Mazowsze.

Desktop computer with monitor, the amount of 180 pieces.

A detailed description of the object of the contract is contained in Annex 3 hereto.

The list of statements and documents confirming compliance of the offered delivery requirements specified by the Contracting Authority:

1. Form the technical specifications in confirming that offered supplies meet the requirements set out in the Terms of Reference attached as Annex 3 hereto.

Completed by the Contractor form the technical specification must contain a description of the products offered specifying the manufacturer, the model, the components used and their technical parameters.

2. declaration of the contractor or entity performing the service or equipment manufacturer that in case of failure of hard disk drive remains at ordering.

3. artist statement confirming that the service will be carried out by Authorized Service Partner manufacturer or directly by the manufacturer.

4. printing tests: test performance SYSmark® 2014 PerformanceTest: Media Creation - a minimum of 1,160 points, Date / Financial Analysis - a minimum of 1,020 points.

EPEAT Gold / or EPEAT® Silver or equivalent.

If the offered equipment is not marked with the ENERGY STAR logo, it must be shown that he underwent tests equivalent to the power and confirm that the relevant testimony.

Purchase of software supporting the management of IT, 1 pc.

A detailed description of the object of the contract is contained in Annex 3 hereto.

The list of statements and documents confirming compliance of the offered delivery requirements specified by the Contracting Authority:

form the technical specifications in confirming that offered supplies meet the requirements set out in the Terms of Reference attached as Annex 3 hereto.

Completed by the Contractor form the technical specification must contain a description of the products offered specifying the manufacturer, the model, the components used and their technical parameters.

Warsaw: Purchase of electricity

Uniwersyteckie Centrum Zdrowia Kobiety i Noworodka Warszawskiego Uniwersytetu Medycznego Sp. z o.o. | Published July 21, 2016  -  Deadline August 31, 2018
cpvs
09000000, 09300000

The contract is for purchase of electricity under the provisions of the Act of 10 April 1997. Energy Law. The estimated electricity demand for the object included in the Detailed Description of the Contract in the period from 01.09.2016 r. To 31.08.2018 r. Is 610 MWh. Employer informs that the switching process takes place once again. The current energy supplier ENEA SA.

Electricity

„Przewozy Regionalne” Sp. z o.o. | Published February 17, 2017  -  Deadline March 6, 2017
cpvs
09310000

The contract is for the sale of electricity within the meaning of the Act of 10.4.1997 r. - Energy Law (Journal of Laws of 2017. Pos. 220), for own Purchaser.

Warsaw: SUPPLY OF ELECTRICITY FOR CENTRAL CENTRE geodetic and cartographic documentation

Centralny Ośrodek Dokumentacji Geodezyjnej i Kartograficznej | Published July 20, 2016  -  Deadline December 31, 2017
cpvs
09310000

1.Przedmiotem contract is the supply of electricity for the needs of Central Documentation Centre of Geodesy and Cartography of 2 buildings located in Warsaw at ul. John Albert 94 B, and in Lesznowola Street. Polish Army 81, under the conditions described in this Terms of Reference hereinafter referred to as the Terms of Reference. The supply must be in accordance with the provisions of the Act of 10 April 1997. Energy Law (Dz. U. of 2012. Item. 1059, as amended.) And the regulations to the Act. 2. In order to describe the object of contract, the Contracting Authority approved that: 1) Estimated total energy consumption during the delivery period is 1790000 kWh 2) The total contracted capacity for abstraction points is 352 kW. 3.Szczegółowe information on the consumption points is described in Annex 1 to the ToR ..

Construction work

Ministerstwo Kultury i Dziedzictwa Narodowego – Centrum Edukacji Artystycznej | Published January 19, 2017  -  Deadline February 27, 2017
cpvs
45000000, 45331200, 45331100, 45310000, 45421100, 45320000

Documentation consists of files in the folder to which access has been indicated in the announcement on the website of the Employer dedicated przedmiotowemu proceedings. 

Documentation consists of files in the folder to which access has been indicated in the announcement on the website of the Employer dedicated przedmiotowemu proceedings.

In particular, the contractor is obliged to perform the following works:

a) Thermal insulation of external walls,

b) proofing and thermal insulation of the foundation walls,

c) thermal insulation and damp floors on the ground floor of the reproduction layer,

d) Thermal insulation of the roof,

e) Replacement of windows and doors while maintaining historical distribution

f) Replacement of heating system with the source (gas heat pump)

g) Replacement of electrical wiring and lighting

h) Installation of air conditioning in the concert hall,

i) Modernization of natural ventilation

j) Strengthening the roof structure under a gas heat pump,

k) Installation of PV,

l) Implementation of bricklaying, plastering and painting.

The Employer recommends making by the Contractor (at its own expense, within the time limits agreed with the director of the institution) local vision.

The proceedings is an element implemented by the Contracting Authority - Ministry of Culture and National Heritage - Artistic Education Centre in Warsaw project entitled. "Comprehensive modernization of Energy selected state institutions of artistic education in Poland" co-financed by the EU in the framework of IE OP 2014-2020, Priority I - Reducing the emission of the economy, Measure 4.3 - Support for energy efficiency, intelligent power management and the use of renewable energy sources in public infrastructure, including in public buildings and in the housing sector.

Construction work for railways and cable transport systems

PKP Polskie Linie Kolejowe SA | Published February 10, 2017  -  Deadline March 20, 2017
cpvs
45234000, 71322000, 45234100, 45234113, 45234116, 45234115, 45231400, 45232332, 45213320, 45111200

The contract is to design the removal of the collision power to km 8 + 300 22 + 160 44 + 990 (including the development of detailed designs), the removal of collision energy at km 3 + 800, 8 + 300 9 + 250, 20 + 750, 22 +160 31 000 + 31 + 850 44 + 990 54 + 300 60 + 680 and 60 + 780 and update parts of their dossiers, ie. generate updated reports intention to commence works, the necessary arrangements to obtain a building permit if it is necessary and removal of telecommunication collision at km 9 + 950 31 + 250 37 + 780 61 + 230 and 61 + 400 62 + 360.

The contract is to design the removal of the collision power to km 8 + 300 22 + 160 44 + 990 (including the development of detailed designs), the removal of collision energy at km 3 + 800, 8 + 300 9 + 250, 20 + 750, 22 +160 31 000 + 31 + 850 44 + 990 54 + 300 60 + 680 and 60 + 780 and update parts of their dossiers, ie. generate updated reports intention to commence works, the necessary arrangements to obtain a building permit if is necessary and removal of telecommunication collision at km 9 + 950 31 + 250 37 + 780 61 + 230 and 61 + 400 62 + 360,

The whole object of the contract includes the construction:

- Documentation of design necessary for the proper performance of all works and get her all the required opinions, agreements, approvals, conditions, decisions and permits necessary for the implementation of the contract;

- All construction works within the scope of the order on the basis developed by the Contractor and approved by the Employer project documentation referred to in paragraph 1, and all the preparatory work necessary for the performance of the contract and the execution of all activities required law;

The contract includes the design and execution of works and the range of energy teletechnical.

Construction works for power plants and heating plants

PGNiG Termika SA | Published November 29, 2016  -  Deadline February 27, 2017
cpvs
45251000

The subject of this contract is the construction of peak boiler in EC Zeran, the implementation of the EPC formula ( "turnkey") gas water boiler with a capacity of approximately 390 MW and its links to the existing infrastructure or converted Żerań. The boiler plant will consist of three water boilers located in the new building housing the light. Boiler room for established the following parameters:

a) Thermal power - about 390 MWt (3 x 130 MW)

b) Fuel - natural gas,

c) Type of work - pumped-reserve,

d) Cooperation - water system network in the EC Zeran, working with regions of the district heating network Veolia Energy Warszawa SA.

Purchaser in accordance with Article. 29 paragraph. 3a of the Public Procurement Law requires the employment of the Contractor under the contract of employment of persons engaged in supervision of the executive over the implementation of the contract.

Chocolate

Regionalne Centrum Krwiodawstwa i Krwiolecznictwa w Warszawie | Published February 9, 2017  -  Deadline March 20, 2017
cpvs
15842100

The contract is for gradual delivery to the registered office ordering plain chocolate 100 g quantity of 2 000 000 units of tablets, packaged in aluminum foil and paper jacket, which seems Employer blood donors to balance energy effort.

Employer provides the delivery of chocolates in the following range and quantity:

- Hard chocolate milk - 750 000 pieces of plates,

- Dark chocolate - 500 000 pieces of plates,

- White chocolate - 250 000 pieces of plates,

- Hard chocolate milk with nuts - 250 000 pieces of plates,

- Hard chocolate milk with additives (raisins) - 250 000 pieces of plates.

Construction works for power plants and heating plants

PGNiG Termika SA | Published February 7, 2017  -  Deadline March 17, 2017
cpvs
45251000

The subject of this contract is the construction of peak boiler in EC Zeran, the implementation of the EPC formula ( "turnkey") gas water boiler with a capacity of approximately 390 MW and its links to the existing infrastructure or converted Żerań. The boiler plant will consist of three water boilers located in the new building housing the light. Boiler room for established the following parameters:

a) Thermal power - about 390 MWt (3 x 130 MW)

b) Fuel - natural gas,

c) Type of work - pumped-reserve,

d) Cooperation - water system network in the EC Zeran, working with regions of the district heating network Veolia Energy Warszawa SA.

Purchaser in accordance with Article. 29 paragraph. 3a of the Public Procurement Law requires the employment of the Contractor under the contract of employment of persons engaged in supervision of the executive over the implementation of the contract.

Construction work

PKP Polskie Linie Kolejowe SA w imieniu której działa Centrum Realizacji Inwestycji, Region Śląski | Published February 18, 2017  -  Deadline March 30, 2017
cpvs
45000000, 71322000, 45200000, 45230000, 45234000, 45234100, 45234113, 45234116, 45234115, 45231400

Revitalization of the railway line No. 139 on the section Bielsko Biala Lipnik - Wilkowice, Bystra within the investment project "Work on the railway line No. 139 section Czechowice Dziedzice - Bielsko Biala - Zwardon (state border)."

The order includes the following components of

1) Documentation of the project, including:

a) the necessary administrative decisions,

b) prepare a draft executive

c) preparation of as-built documentation, including the geodesic as-built documentation,

d) conducting the assessment of the subsystems and the transfer of the corresponding declarations and certificates for subsystems "infrastructure", "energy" and "control" to said lower range of works.

2) realization of works in the ranges:

a) Surface-track and track bed

-przebudowa surface railway track No. 1 and 2 in the section Bielsko Biala Lipnik - Wilkowice Bystra;

-Comprehensive reconstruction of the surface of the trips;

-replacement junctions;

b) railway traffic control devices

-replacement switch drives;

-przebudowa devices SRK associated with replacement of pavements;

-przebudowa devices at crossings cat. And at km 56.935; 57.129; 59.025;

-przebudowa ssp devices at level crossings Cat. B at km 58.244; 60.307; 61.487; 64.133;

Fitted appliances and lighting ssp crossings Cat. C at km 62.158; 62.486; 63.688;

-przebudowa outdoor lighting;

c) energy

-przebudowa catenary above the track number 1 and 2 in the section Bielsko Biala Lipnik - Wilkowice, Bystra with transitions rozjazdowym;

-przebudowa devices electric heating of turnouts;

d) engineering facilities

-rewitalizacja engineering structures;

e) buildings

-przebudowa 6 platforms jednokrawędziowych and one platform

dwukrawędziowego.

Employer provides similar procurement, referred to in art. 134 para. 6 point 3) of the Public Procurement Act.

Warsaw: Development of design documentation and tender in the framework of the investment task. Adaptation of the main building at ul. Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision.

Miasto Stołeczne Warszawa - Stołeczny Zarząd Rozbudowy Miasta | Published July 15, 2016  -  Deadline December 15, 2017
cpvs
71000000, 71300000, 71248000

Old at the Centre for Support of Families Family Warsaw with land development and the author's supervision. a) Characteristics of the facility. It is made in the traditional technology of masonry walls, a flat roof is not ventilated. Change of use will expand operations CWR Family Warsaw on new actions on behalf of children and their families. It is located in the urban New Town entered in the register of monuments under the number A-1196. b) The characteristic technical parameters of the existing building: 1) Built-up area of ​​the building - 181.93 m 2; 2) The floor area of ​​the building - 516 m2. c) Description of the material scope of works: 1) stabilization of foundations, assessment and repair of structural elements, protection of the escarpment; 2) Execution of thermo - the exterior walls, roof, replacement of windows and doors; 3) Reconstruction of the building (pom. Administrative - office, pom. Studio, rooms for social workers, utility room in the basement), etc .; 4) Interior design, compilation of a first equipment; 5) Reconstruction and installation of sanitary (which, water. - Can., Mechanical ventilation, air conditioning, fire protection.); 6) Reconstruction and electrical installations; 7) Execution of telecommunication installations (CCTV, LAN, SSWiN, intercom systems, fire.); Old, making new external stairs and sidewalks, green. The scope of the contract includes in particular: 1) the execution of all necessary starting materials for the design, including: a) updated maps for design purposes, b) execution of an inventory of the existing facility, together with an assessment of the technical condition with particular emphasis on the design and an indication of the elements necessary to replace or reconstruction in terms of: - architectural and construction elements design - 3 copies. - plumbing - 3 copies. - electrical and telecommunication installations - 3 copies. - land management with inventory greenery - 3 copies. c) to document the geotechnical and research geological terrain entire investment - 3 copies. d) development expertise the design - 3 copies. 2) Implementation of the project of building a multi-branch with all the necessary arrangements in 6 copies., comprising: a) land development plan includes, among others, design of green economy and green existing sidewalks, exterior stairs, b) architectural and building thermo-modernization and reconstruction of containing the energy performance of the building together with the certificate of energy performance for the building and geological documentation, c) installation projects - sanitary, electrical, telecommunication, d) information on BIOZ, e) developing expertise fire. agreed with the appropriate Commander PSP. 3) Execution of projects implementing works - in 6 copies. A) architecture with a scenario of fire, b) Architecture - Interior together with the statement and equipment c) architecture interior design with a book room, d) design, including design protection embankment and building before settling.

Disposable non-chemical medical consumables and haematological consumables

Wojskowy Instytut Medyczny | Published February 14, 2017  -  Deadline March 24, 2017
cpvs
33141000, 33190000

A detailed description of the object of the contract is contained in Annex 3 hereto. 

1 single chamber pacemaker basic -72 pc.

2 electrodes for passive or active fixation pacing atrial and ventricular -152 pc.

3 single chamber pacemaker MRI - 80 pcs.

4 Rent 1 pc. Programmer to control the implanted devices.

1 dual chamber pacemaker DDDR response to the sudden drop in the rhythm and the algorithm for the prevention of atrial fibrillation - 100 pcs.

2 dual chamber pacemaker resynchronizujący chamber CRT-P - 30 pcs.

3 electrodes atrial and ventricular - 110 pcs.

Left ventricular electrodes 4 - 30 pcs.

5 Rent 1 pc. Programmer to control the implanted devices.

Dual chamber pacemaker with the ability to perform MRI and function telemonitoring - 150 pcs.

The electrodes stimulate the atrial and ventricular with the ability to perform MRI - 400 pcs.

Introducery type of peel-away - 500 pcs.

Telemonitoring equipment - 10 pcs.

5 adapters to the electrodes Y - 8 pieces.

Screwdriver - 10 pcs.

7. plug caps - 10 pcs.

8. plug cap for electrodes - 10 pc.

9 stilete - 40 pcs.

Implantable recorder arrhythmia - 3 pieces.

Dual chamber pacemaker with two independent sensors - 5 pcs.

Rent 1 pc. Programmer to control the implanted devices.

1 Single chamber cardioverter defibrillators with a higher number of discharges and the ability to perform MRI - 20 pcs.

Pos .2 cardioverter-defibrillators Single chamber with a higher number of discharges, and ability to perform MRI discriminator morphology - 20 pcs.

3 cardioverter-defibrillators Single chamber with increased discharge energy and the ability to perform MRI - 4 pcs.

4 defibrillation pro MRI - 30 pcs.

5 device telemonitoring - 3 pieces.

Item 6 Rent 1 pc. Programmer to control the implanted devices.

1 single chamber cardioverter-defibrillator with the ability to sense signals from the atrium and the ability to perform MRI -30 pc.

Defibrillation with two dipoles to collect signals from the atrium pro MRI - 30 pcs.

A device for telemonitoring - 2 pcs.

Rent 1 pc. Programmer to control the implanted devices.

1 cardioverter-defibrillators one or Dual paced algorithms differentiating supraventricular and ventricular arrhythmias based on the morphology of the QRS - 20 pcs.

2 cardioverter-defibrillators one or Dual paced the anatomical shape and the ability to perform MRI without exclusion zones - 20 pcs.

Defibrillation - 40 pcs.

Pos.4 electrodes for passive or active fixation pacing the atrium - 20 pcs.

5 connector for connecting the electrodes to the device DF-4 - 1 pc.

6 Rent 1 pc. Programmer to control the implanted devices.

1 dual chamber cardioverter-defibrillator with extended diagnostics - 25 pcs.

Defibrillation - 40 pcs.

3 cardioverter-defibrillator resynchronizujący (CRT-D) - 25 pcs.

Left ventricular electrode 4 - 25 pcs.

5 guiding catheter external - slit - 25 pcs.

6 catheter inside the hemostatic valve, slit, external shell - hydrophilic - 25 pcs.

7 cutter for cutting catheters - 25 pcs.

8 guide the needle - 5 pcs.

9 Set for telemonitoring

Balloon item 10 to contrast the coronary sinus - 25 pcs.

11 cardioverter - defibrillator resynchronizujący with the option of a two-point stimulation of the left ventricle - 7 pcs.

Guidewire 12 0.014 "-50 pcs.

13 Rent 1 pc. Programmer to control the implanted devices.

Dual chamber cardioverter advanced to the increased number of discharges and the ability to perform MRI - 10 pcs.

2 cardioverter-defibrillators Dual paced with a higher number of discharges, and ability to perform MRI discriminator morphology - 15 pcs.

3 cardioverter-defibrillators Dual paced with increased discharge energy and the ability to perform MRI - 2 pcs.

The electrodes stimulate pro MRI - 16 pcs.

Defibrillating lead pro MRI - 17 pcs.

A device for telemonitoring - 2 pcs

7 Rent 1 pc. Programmer to control the implanted devices.

1 cardioverter-defibrillator resynchronizujący (CRT-D) with an increased number of discharges and the ability to perform MRI - 50 pcs.

2 cardioverter-defibrillator resynchronizujący (CRT-D) with increased discharge energy and the ability to perform MRI - 2 pcs.

Defibrillating lead pro MRI - 25 pcs.

4. stimulating electrodes pro MRI - 40 pcs.

Electrodes left ventricular pro MRI - 40 pcs.

A device for telemonitoring - 2 pcs.

Set for catheterization of the coronary sinus - 40 pcs.

Set venography - 40 pcs.

Angioplasty guidewire 0.014 inches - 50 pcs.

Dual chamber pacemaker resynchronizujący CRT-P - 2 pcs.

Rent item 11 1 pc. Programmer to control the implanted devices.

1 cardioverter-defibrillators, cardiac resynchronization CRT-D algorithms differentiating supraventricular and ventricular arrhythmias based on the morphology of the QRS - 15 pcs.

2 cardioverter-defibrillators

Construction work

PKP Polskie Linie Kolejowe S.A. | Published February 17, 2017  -  Deadline March 28, 2017
cpvs
45000000, 71322000, 45200000, 45230000, 45234000, 45234100, 45231400

The full name of the case: Development of design documentation and execution of works using the "Design and Build" based on the materials developed within the project OPI & E 7.1-86 "Pre-design documentation for the electrification of the line 278 (E30) section Węgliniec - Zgorzelec," along with certification in scope of the TSI ENERGIA implemented within the framework of the project "Electrification of the railway No. 278, 274 on the section Węgliniec - Zgorzelec."

Implementation of the tasks on the railway line No. 278 Węgliniec - Zgorzelec from km 0.386 to km 27.130 and line 274 Świebodzki Wroclaw - Zgorzelec from km 202.034 to km 202.455 will be conducted in the "design and build" on the basis of the FIDIC General Conditions of Contract. The contract is for design and construction of the catenary of the railway line electrification of the subject, with a length of 27.165 km including:

- Line No. 278 (km 0.386 - 27.130) - 26.744 km:

- Line section 274 (202.034 - 202.455) - 0.421 km.

The whole subject of the Order includes the execution of the following elements:

1) Documentation of the project, including:

a) Upgrade construction project

b) obtaining a building permit and other necessary administrative decisions,

c) prepare a draft executive

d) the development of as-built documentation, including the geodesic as-built documentation, development of sampling kolaudacyjnego.

e) completion of the evaluation process of the subsystems and the transfer of the corresponding declarations and certificates for the EC subsystems at the design stage and works together with obtaining authorization for use of the subsystem Energy -TSI

2) Implementation of works in the ranges:

a) traction network

b) geology.

Construction supervision services

PKP Polskie Linie Kolejowe S.A. | Published February 17, 2017  -  Deadline March 28, 2017
cpvs
71520000

The object of the procedure is: Acting oversight of design documentation and construction work on lines 278 and 274 within the scope of the tender and interconnection agreements within the framework of the project "Electrification of the railway No. 278, 274 on the section Węgliniec - Zgorzelec", in particular:

a) Acting as the Engineer in accordance with the Agreement and FIDIC conditions of contract;

b) Management of works and finance, in particular full service Contract in terms of their settlement, monitoring and reporting, material and financial;

c) Technical management, including the performance of the duties of the Inspector investment supervision for Contracts;

d) management including coordination of all Contracts concluded within the framework of the Project;

e) Conducting environmental supervision, including natural, according to the decision on the environmental conditions, the provisions of uzgadniającymi conditions for the project and other administrative decisions in this regard.

The total length of the section subject to electrification is 27.165 km including:

- Line No. 278 (km 0.386 - 27.130) - 26.744 km:

- Line section 274 (202.034 - 202.455) - 0.421 km

Execution of the task will take place through

Contract No. 1:

Development of design documentation and execution of works using the "Design and Build" based on the materials developed within the project OPI & E 7.1-86 "Pre-design documentation for the electrification of the line 278 (E30) section Węgliniec - Zgorzelec," along with certification in the field of TSI ENERGIA

The contract includes in particular the implementation of the following elements:

a) project documentation, including:

- Renovation construction projects,

- Drafting of regulations,

- Obtaining a building permit,

- The documentation associated with the process of conformity assessment of a structural subsystem "Energy"

- Development of detailed technical specifications,

- Preparation of as-built documentation,

- Settlement of the works, including the preparation of documents for the adoption of property to the state or increase the value of fixed assets

- Performing environmental supervision

b) execution of the Works involving the construction and reconstruction of railway infrastructure in the sectors:

- Catenary with power supply systems

- Cubic features (traction substations)

- The removal of collision

c) The payment of compensation for the property, and limited rights in rem acquired on the basis of a final decision on location of a railway line

These contracts and agreements will concern:

a) the construction of traction substations: Pieńsk PT and PT Zgorzelec

b) conversion of traction substations: PT Węgliniec

These robots can be implemented with reference to the documents:

- Contracts for connection to the distribution network the power company on the basis of requests for connection to the distribution network

- Agreements on the removal of a collision with elements of the power grid PKP Energetyka SA and other operators.

The Project will be carried out information and promotion activities in the area indicated by the Employer under a separate agreement, as well as post-implementation analysis they will be prepared under separate agreements (if any will be conducted).

The expected execution time for each of Contracts, has been indicated in the OPZ and Conditions Agreement.