Call +44 800 9755 164

Public tenders for energy in Szczytno Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!
EnergyPolandszczytno

Electricity, heating, solar and nuclear energy

Wyższa Szkoła Policji w Szczytnie | Published October 29, 2015
Winner
Veolia Szczytno Sp. z o.o.
cpvs
09300000

Delivery and transfer of thermal energy for heating buildings belonging to the Police Academy in Szczytno Street. MJ Pilsudski 111 and ul. Brave 12.

Electricity, heating, solar and nuclear energy

Wyższa Szkoła Policji w Szczytnie | Published October 14, 2015
Winner
Veolia Sp. z o.o.
cpvs
09300000

Delivery and transfer of thermal energy for heating buildings belonging to the Police Academy in Szczytno Street. JM Pilsudski 111 12-100 Szczytno and ul. Brave 12 12-100 Szczytno.

The construction of a sports hall with a cloakroom and sanitary teaching rooms were trained in the special and Education Centre in Szczytno Street. Korce 4, on plot No. 568/4 and 569/2 precinct 2 City Szczytno.

 | Published February 23, 2015  -  Deadline March 10, 2015
cpvs
45000000, 45212200, 45310000, 45330000

The contract is: Object of the contract shall include: 1. the removal of trees and shrubs, 2-storey building, with an audience of 80 people. 3. The construction of the external connections, 4. installation of fire extinguishers, signs and information plates fire., 5th hall equipment sports equipment, 6. landscaping around the sports hall, 7 to develop and provide to the Employer energy performance certificate in 2 copies, 8. obtain permission to use the object. In the event of discrepancies between the descriptions of the work to be done in the project documentation and descriptions of the works in the attached przedmiarach, the basis for determining the description of the work is the design documentation. In accordance with the principle of fixed remuneration, the Contractor shall be required to draw up their own przedmiarów works in order to calculate the offer price. The Purchaser also recommends Contractors carrying out the vision of local, detailed analysis of the design documentation, technical specification for execution and acceptance of works and make the necessary measurements from nature. 3 of the PPA Purchaser allows tenders of equivalent materials, provided that the technical parameters, operational, performance no worse than those specified in the project documentation construction executive and technical specifications, performance and acceptance of the robot. Media consumption will be settled on the basis of installed by the Contractor measuring devices. Building energy performance certificate should be drawn up in accordance with: 1409, as amended. d.), Laws of 2014. poz.1200), Laws of 2014. poz.888), 1238, as amended. d.) The conditions of work - the contractor is required to provide continuous supervision of works by the construction manager - construction works will be performed in the active sites, which will take place in school activities, - the contractor will be required to carry out works to ensure the safety of the occupants of the buildings, carrying out works in a manner interfering as little as possible the use of the facilities by the user and full cooperation with the user objects. - The contractor will be required to ensure safe passage walking and commuting to the extent agreed with the user objects and keep them in good order and cleanliness, - the contractor must provide for carrying out the works in shifts, ie. In the morning and afternoon, in a way that does not disrupt the classroom - the contractor will be required to comply with security sealed between the part of the building dedicated to the reconstruction and the remainder of which will be held school activities, - works should be carried out so that the objects were protected from flooding, - the contractor will be required for the daily maintenance of cleanliness and order area of ​​construction works, bringing to its original state area adjacent to the object - removing any waste from the construction in accordance with the Waste Act. In this situation, the Purchaser shall have the right to seek compensation for damages including the amount of lost funding. Claim for damages from the Contractor for loss of funding does not limit the right of the Employer to the Contractor with other claims laid agreement and the Civil Code. Terms of payment for work done: the Purchaser indicates that the payment due for construction works will be: 1,660,000.00 zł gross
  • 1