Call +44 800 9755 164

Public tenders for energy in Szczecin Poland

Find all Energy tenders in the world.
Finding business opportunities has never been easier.

Results for energy. Make a new search!

Szczecin: Repair of the roof insulation and facade of the building belonging to the Municipal Family Assistance Center in Szczecin at ul. Hryniewieckiego 9 in Szczecin

Miejski Ośrodek Pomocy Rodzinie | Published July 26, 2016  -  Deadline November 15, 2016
Hryniewieckiego 9 in Szczecin. The contract scope includes the following works: 1) the preparatory work in the area covered by the contract, demolition, excavation and cleaning, 2) work associated with the development of the construction site, maintenance facilities construction (repairs, water supply, electricity, telephone, surveillance) , any cleanup work associated with the termination of the contract, 3) construction of marking the construction site and appropriate marking and protection of places of work, fencing dangerous areas, 4) performance and setting site board and for making appropriate changes in the content of the array, 5) construction related to fence construction site (isolation of plots of land the construction of the area shelters), securing the construction site from access by third parties, 6) performance during construction of roofs, pledge security, etc., 7) construction of works associated and robots temporary necessary to perform the contract, 8) works related to the removal of debris and waste from the construction site and their management (export from the construction site, landfill, recycling, etc.) 9) delivery, installation, dismantling and use of scaffolding and all kinds of equipment, tools and equipment needed to use in the execution of the contract, 10) occupation of the roadway (roadway, pavement, shoulder, etc.), if the need arises for the realization of the agreement, 11) drawing up a plan of safety and health protocols of tests and checks must be completed successfully 13) execution of an energy performance certificate, 14) drawing up and submitting to the contracting authority one copy of as-built documentation in paper with marked and signed by the construction manager, insignificant changes compared to the approved project documentation (if they occur during construction) confirmed the signature of the designer, 15) the performance of the as-built geodesic inventory,
  • 1